Back to news

January 17, 2019 | Local, Land

Government completes new armoury at Saint-Hubert Garrison

January 16, 2019 – Saint-Hubert, Quebec – National Defence / Canadian Armed Forces

As outlined in Canada's defence policy, Strong, Secure, Engaged, the Government of Canada is investing in Defence infrastructure to provide our military personnel with modern, functional, and green facilities in which to work and train.

Today, Defence Minister Harjit S. Sajjan and Parliamentary Secretary to the Defence Minister Serge Cormier, participated in a ribbon-cutting ceremony for a new armoury at the Saint-Hubert Garrison. The project represents a $50-million investment in Reserve infrastructure and provided economic benefits for the local community, creating 230 jobs during construction.

The centralized 8,824-m2 facility will co-locate multiple Reserve units and provide personnel with modern administrative spaces, training rooms, an advanced weapons simulator, vehicle and equipment storage areas, common mess facilities, and a fitness centre. Work continues on the renovation of an existing building, as well as the demolition of an aging and obsolete hanger.

Quotes

“Through our defence policy Strong, Secure, Engaged, our government is expanding our Reserve Force, modernizing Defence infrastructure, and taking care of the future training and operational needs of our people. I am proud that we are delivering on the new Saint-Hubert Armoury, a green and modern facility which will support the future success of Canada's Reserve Force in the Montreal South Shore area.”

Harjit S. Sajjan, Defence Minister

“This new facility is a great example of the investments National Defence is making in green infrastructure across Canada. Greening Defence infrastructure will help us use less energy, lower our greenhouse gas emissions, and build a cleaner, healthier, more affordable future that we can be proud to leave our children.”

Serge Cormier, Parliamentary Secretary to the Minister of National Defence

“Garrison Saint-Hubert is an integral part of the Montreal South Shore community. This kind of investment in Defence infrastructure provides economic opportunities for the region and supports our Reservists by providing them with new facilities in their communities.”

Sherry Romanado, Parliamentary Secretary to the Minister of Seniors

Quick facts

  • The new and renovated facilities will be used by a number of Reserve Force units, including Le Régiment de Maisonneuve, 34 Service Battalion, 41 Military Police Platoon, and the 34 Canadian Brigade Group Headquarters in the greater Montreal region.

  • A $25-million contract was awarded to Laval-based Groupe Geyser Inc. for this construction project. The $2.6-million design contract was awarded to Birtz Bastien Beaudoin Laforest, and Stantec.

  • The total project value of $50 million included construction, design fees, contract management, communications, furnishings and landscaping.

  • Completed in December 2018, the new armoury was designed to meet Leadership in Energy and Environmental Design (LEED®) Silver standards. It will help Defence reduce greenhouse gas emissions from its buildings and non-military vehicles by 40 percent (from 2005 levels) by 2030, and support the new federal emissions reduction target of 80 percent by 2050.

Associated links

https://www.canada.ca/en/department-national-defence/news/2019/01/government-completes-new-armoury-at-saint-hubert-garrison.html

On the same subject

  • Canada owes it to the world to become an innovative ally

    July 18, 2023 | Local, Other Defence

    Canada owes it to the world to become an innovative ally

    New defence policy network aims to shift old ways of thinking about warfare and security.

  • Royal Canadian Air Force wants more than a few good pilots as it’s losing many of them to commercial jobs

    February 13, 2019 | Local, Aerospace

    Royal Canadian Air Force wants more than a few good pilots as it’s losing many of them to commercial jobs

    by Lee Berthiaume The Canadian Press OTTAWA — A shortage of experienced pilots is forcing the Royal Canadian Air Force to walk a delicate line between keeping enough seasoned aviators available to train new recruits and lead missions in the air. Air Force commander Lt.-Gen. Al Meinzinger described the balancing act during a recent interview in which he also revealed many pilots today are likely to have less experience than counterparts in similar positions 10 years ago. Much of the problem can be traced back to veteran aviators leaving for commercial jobs, or other opportunities outside the military, forcing senior commanders into a juggling act over where to put those still in uniform. "In order to (support) your training system ... you've got to pull experienced pilots into those positions, but you have to have experienced pilots on the squadrons to season the youth that are joining the units," he said. "So it's a bit of a delicate balance. And when you're in a situation where you don't have as much experience, broadly speaking, you've got to balance that very carefully. Hence the idea of retaining as much talent as we can." Fixing the problems created by the shortage will become especially critical if the Air Force is to be ready for the arrival of replacements for the CF-18s. Meinzinger said such transitions from one aircraft to another are particularly difficult — the RCAF needs to keep the same number of planes in the air to fly missions and have senior aviators train new pilots, while still sending seasoned pilots for training on the incoming fleet. "Ideally you want to go into those transitions very, very healthy with 100 per cent manning and more experience than you could ever imagine," Meinzinger said. While he is confident the military can address its pilot shortage in the next few years, especially when it comes to those responsible for manning Canada's fighter jets, the stakes to get it right are extremely high. The federal auditor general reported in November that the military doesn't have enough pilots and mechanics to fly and maintain the country's CF-18 fighter jets. Air Force officials revealed in September they were short 275 pilots and need more mechanics, sensor operators and other trained personnel across different aircraft fleets. There are concerns the deficit will get worse as a result of explosive growth predicted in the global commercial airline sector, which could pull many experienced military pilots out of uniform. "That's the expectation, that Canada will need an additional 7,000 to 8,000 pilots just to nourish the demands within the Canadian aerospace sector," Meinzinger said. "And we don't have the capacity as a nation to produce even half of that." Within the military, there also haven't been enough new pilots produced to replace those who have left. The auditor general found that while 40 fighter pilots recently left the Forces, only 30 new ones were trained. The military is working on a contract for a new training program that will let the Air Force increase the number of new pilots trained in a given year when necessary, as the current program allows only a fixed number to be produced. Meanwhile, Meinzinger said the loss of more seasoned pilots means others are being asked to take on more responsibility earlier in their careers, though he denied any significant impact on training or missions. He said the military is managing the situation through the use of new technology, such as simulators, to ensure the Air Force can still do its job. "There's no doubt commanding officers today in RCAF squadrons, they have probably less flying hours than they did 10 years ago," he said. "What that (commanding officer) has today is probably an exposure to 21st-century technology and training. So I think that certainly offsets the reduction of flying hours." Meinzinger and other top military commanders are nonetheless seized with the importance of keeping veteran pilots in uniform to ensure those climbing into the cockpit for the first time have someone to look to for guidance — now and in the future. New retention strategies are being rolled out that include better support for military families, increased certainty for pilots in terms of career progression and a concerted effort to keep them in the cockpit and away from desks and administrative work. Other militaries, notably the U.S., that are struggling with a shortage of pilots have introduced financial bonuses and other measures to stay in uniform. Meinzinger couldn't commit to such an initiative, but did say that "nothing is off the table." The situation may not represent an existential crisis, at least not yet, but officials know it is one that needs to be addressed if Canada's Air Force is to continue operating at top levels for the foreseeable future. "Experience is what allows us to (transfer knowledge) and grow for the future," Meinzinger said. "And that's why I talk about it as being kind of the centre of gravity. In the extreme, if you lose all your experience, you can't regenerate yourself." https://www.thespec.com/news-story/9169169-royal-canadian-air-force-wants-more-than-a-few-good-pilots-as-it-s-losing-many-of-them-to-commercial-jobs/

  • $1 billion and counting: Inside Canada's troubled efforts to build new warships

    February 25, 2020 | Local, Naval

    $1 billion and counting: Inside Canada's troubled efforts to build new warships

    Federal government tables figures showing what it's spent on the projects to date Murray Brewster The federal government has spent slightly more than $1.01 billion over the last seven years on design and preparatory contracts for the navy's new frigates and supply ships — and the projects still haven't bought anything that floats. The figures, tabled recently in Parliament, represent the first comprehensive snapshot of what has been spent thus far on the frequently-delayed project to build replacement warships. It's an enormous amount of money for two programs that have been operating for more than a decade with little to show for their efforts to date. It will be years before the Canadian Surface Combatant project — which aims to replace the navy's frontline frigates with 15 state-of-the-art vessels — and the Joint Support Ship program for two replenishment vessels actually deliver warships. The numbers and details for each advance contract were produced in the House of Commons in response to written questions from the Conservative opposition. The money was divided almost evenly between the federal government's two go-to shipyards: Irving Shipbuilding in Halifax, the prime contractor for the new frigates, and Seaspan of Vancouver, the builder of the supply ships. The breakdown raises critical questions about at least one of the programs, said a defence analyst, but it also shines a light on promises made by both Liberal and Conservative governments to keep spending under control for both of these projects — which could end up costing more than $64 billion. "I think there should be a level of concern [among the public] about whether or not what's being delivered in practice is what was advertised at the outset," said Dave Perry, a procurement expert and vice president of the Canadian Global Affairs Institute. A design still in flux Most of his concerns revolve around the new support ships, which the Liberal government says are in the process of being built now. The written responses, tabled in Parliament, note that the projected cost for the two supply ships — $3.4 billion — remains under review "as the design effort finalizes." Perry said he was astonished to learn that, "seven years and half-a-billion dollars into design work on an off-the-shelf design," the navy doesn't have the support ships, even though "the middle third of the ship is built" — and officials now say "the design effort isn't finished." Usually, he said, ships are designed before they're built. The head of the Department of National Defence's materiel branch said most of the preparatory contracts were needed to re-establish a Canadian shipbuilding industry that had been allowed to wither. 'A lot of patience' "I think we have to look at the totality of everything that's being accomplished under" the national shipbuilding strategy, said Troy Crosby, assistant deputy minister of materiel at DND. "Over that period of time, and with these expenditures, we've built a shipbuilding capability on two coasts, not just through National Defence but also through the coast guard, offshore fisheries science vessels. I understand it has taken a lot of patience, I suppose, and probably some uncertainty, but we're really getting to the point now where we can see delivering these capabilities to the navy." The largest cash outlays involve what's known as definition contracts, which went individually to both shipyards and were in excess of $330 million each. They're meant to cover the supervision of the projects and — more importantly — to help convert pre-existing warship designs purchased by the federal government to Canadian standards. The choices on each project were made at different times by different governments, but ministers serving both Liberal and Conservative governments decided that going with proven, off-the-shelf designs would be faster and less expensive than building from scratch. Now, after all the delays, it's still not clear that choosing off-the-shelf designs has saved any money. "I would be completely speculating on what it would cost to invest to develop the kind of expertise and capacity inside the government, inside National Defence and everybody involved, to be able to do something like that in-house," said Crosby. "The approach we've taken at this point, by basing both the Joint Support Ship and the Canadian Surface Combatant on pre-existing designs, allows us to retire a lot of risk in the way forward." When Crosby talks about "retiring risk," he's talking about the potential for further delays and cost overruns. Among the contracts, Irving Shipbuilding was given $136 million to support the drawing up of the design tender for the new frigates and to pay for the shipbuilding advice Irving was giving the federal government throughout the bidding process. Years ago, the federal government had enough in-house expertise to dispense with private sector guidance — but almost all of that expertise was lost over the past two decades as successive federal governments cut the defence and public works branches that would have done that work. The last time Canada built major warships was in the 1990s, when the current fleet of 12 patrol frigates was inaugurated. The federal government has chosen to base its new warships on the BAE Systems Type-26 design, which has been selected by the Royal Navy and the Royal Australian Navy. The hull and propulsion system on the new frigates will be "largely unchanged" from the British design, but the combat system will be different and uniquely Canadian, said Crosby. The project is still on track to start cutting steel for the new combat ships in 2023. Crosby said he would not speculate on when the navy will take delivery of the first one. Delivery of the joint support ships is expected to be staggered, with the first one due in 2024. There will be a two-year gap between ships, said Crosby, as the navy and the yard work through any technical issues arising with the first ship. If that timeline holds, the first support ship will arrive two decades after it was first proposed and announced by the Liberal government of former prime minister Paul Martin. https://www.cbc.ca/news/politics/frigates-joint-supply-ships-navy-procurement-canada-1.5474312

All news