30 mars 2022 | International, Terrestre

Missile Defense Agency seeks $9.6 billion in FY23 budget

The Missile Defense Agency is prioritizing efforts to go up again evolving threats like hypersonic weapons and cruise missiles including funding for a new missile defense architecture on Guam and development of a glide-phase hypersonic weapon interceptor in its FY23 budget request.

https://www.defensenews.com/congress/budget/2022/03/29/missile-defense-agency-seeks-96-billion-in-fy23-budget/

Sur le même sujet

  • All US F-35s grounded worldwide

    12 octobre 2018 | International, Aérospatial

    All US F-35s grounded worldwide

    By: Tara Copp and Shawn Snow The Pentagon announced Thursday it is grounding its entire fleet of F-35s, just days after the first crash of an F-35B led investigators to suspect there is a widespread problem with the advanced fighter's fuel tubes. “The U.S. Services and international partners have temporarily suspended F-35 flight operations while the enterprise conducts a fleet-wide inspection of a fuel tube within the engine on all F-35 aircraft,” the F-35 Joint Program Office announced in a statement Thursday morning. “If suspect fuel tubes are installed, the part will be removed and replaced. If known good fuel tubes are already installed, then those aircraft will be returned to flight status. Inspections are expected to be completed within the next 24 to 48 hours.” The office said the grounding “is driven from initial data from the ongoing investigation of the F-35B that crashed in the vicinity of Beaufort, South Carolina on 28 September. The aircraft mishap board is continuing its work and the U.S. Marine Corps will provide additional information when it becomes available.” In the Sept. 28 crash in South Carolina near the Marine Corps Air Station Beaufort, the pilot safely ejected from the aircraft, which belonged to 2nd Marine Aircraft Wing, Marine Fighter Attack Training Squadron 501, known as the “Warlords.” While the F-35′s U.S-based Joint Program Office had indicated that the grounding included aircraft purchased by foreign militaries, the British military signaled Monday that its entire fleet is not grounded. The F-35 Joint Program Office has said safety is a top priority. “The primary goal following any mishap is the prevention of future incidents. We will take every measure to ensure safe operations while we deliver, sustain and modernize the F-35 for the warfighter and our defense partners.” The U.S. grounding comes after the Pentagon announced that a Marine Corps F-35B conducted the platform's first-ever combat mission on Sept. 27. The Marine Corps' aircraft launched from the amphibious warship Essex, striking targets in Afghanistan. In April, a Marine Corps F-35B out the Marine Corps air station at Cherry Point, North Carolina, was forced to make an emergency landing when the aircraft fuel light came on. The grounding news also comes two days after Defense News reported that Secretary of Defense Jim Mattis has ordered the military services to get readiness rates on four planes, including the F-35, up above 80 percent by next September. According to data for fiscal year 2017, the most recent available, the Air Force's F-35A models had around a 55 percent readiness rate, well below that target. Although the Marine Corps is the first U.S. service to fly its joint strike fighters in combat, the aircraft has been used by the Israeli air force to strike targets. In May, Israel Defense Forces officials confirmed that the country's F-35 “Adir” fighters had seen combat in two airstrikes somewhere in the Middle East. The Marine Corps declared the F-35B operational in 2015, becoming the first service to integrate the joint strike fighter into its fleet. The Air Force followed by declaring initial operational capability for the F-35A conventional variant in 2016, while the Navy plans to declare initial operational capability for the F-35C carrier variant in February 2019. The F-35 joint strike fighter is the most expensive program in the Pentagon's history. Currently, the U.S. military has purchased 245 aircraft from Lockheed Martin. The Air Force has 156, the Marine Corps has 61 and the Navy has 28, according to data provided by the joint program office. The U.S. Air Force, Navy and Marine Corps plan to buy a total of 2,456 F-35s, at an estimated cost of $325 billion. In total, the aircraft program is projected to cost about $1 trillion to develop, produce, field and sustain over its lifetime, according to the Government Accountability Office. The F-35B is the short takeoff, vertical landing variant of the aircraft, which allows the pilot to hover and land vertically like a helicopter — a necessity for the Marines, which typically operate from amphibious ships with smaller decks than aircraft carriers. Because the problem is related to a fleetwide engine issue, rather than just in the F-35B models, it appears unlikely that the problem is unrelated to the short-takeoff and vertical-landing capabilities of the Marine's design. The issue as described by the JPO indicates the issue is believed to come from a subcontractor who supplied the fuel tubes for engine manufacturer Pratt & Whitney. A spokesman for the F-35s manufacturer, Lockheed Martin, said Thursday morning that industry partners were working with the F-35's Joint Program Office to investigate the problems. "We are actively partnering with the Pentagon's F-35 Joint Program Office, our global customers and Pratt & Whitney to support the resolution of this issue and limit disruption to the fleet,” said Friedman, Michael, the spokesman for Lockheed. The U.S. Government Accountability Office has projected a total lifetime cost of $1 trillion for the program. F-35s have already been delivered to the United Kingdom, Italy, Israel, Netherlands, Turkey, Australia, Japan, South Korea and Norway. This story is developing and will be updated. Defense News staff writers Aaron Mehta and Valerie Insinna contributed to this report. https://www.militarytimes.com/news/your-military/2018/10/11/dod-announces-global-grounding-of-all-f-35s

  • US Army network team sets timeline for satellite constellations

    20 août 2020 | International, Aérospatial

    US Army network team sets timeline for satellite constellations

    Andrew Eversden WASHINGTON — The U.S. Army's tactical network program office expects to reap the full benefits of low-and medium-Earth orbit satellite constellations in the 2025-2027 time frame, the head of the office said Aug. 18. Speaking on a webinar hosted by the Defense Advanced Research Projects Agency, Brig. Gen. Rob Collins, program executive officer at Program Executive Office Command, Control, Communications-Tactical, said the two constellations types offer “game-changing technologies” that will likely be fully mature and ready for soldier use in Capability Set ‘25 or ‘27, the two-year cycle of new network tools the service is fielding. One of the connectivity benefits of the LEO and MEO constellations in the field, Collins said, is that they can allow for complex network functions and mission-support capabilities to remain in a safer place. “We may be able to put those in an area in a more safe sanctuary and allow our war-fighting formations, our brigades and divisions to better focus on what their tactical mission is without having to concern themselves with the force protection of those areas,” the one-star general said at DARPA's virtual Electronic Resurgence Initiative Summit. The Army is interested in LEO and MEO satellite constellations because they can provide significantly more bandwidth and reduced latency. “It's really all about having a resilient network architecture that takes advantage of all the layers that can be expeditionary,” Collins said. LEO and MEO can also allow for smaller ground terminals, which will increase mobility for the soldier, he added. PEO C3T is currently working on prototypes of new satellite capabilities in partnership with the Army's Combat Capabilities Development Command. PEO C3T's Project Manager Tactical Network division will run lab-based experimentation with new satellite terminals this summer to “exploit some of the commercial capabilities,” Collins said. The program office is also working with the CCDC's Space and Terrestrial Communications Directorate on creating multi-band satellite terminals. 5G technology will add an additional layer of network speed. Collins said the Army anticipates 5G technology has the “potential” to be incorporated into Capability Set '25. But he warned that the Army operates in unique environments with rough terrain and foliage that can affect communications, and can not always rely on towers and relay stations. “I think one of the things we're going to have to do is how can we take and best employ some of this technology, how do we link it into our current environment and ensure that it's mobile,” Collins said. “And then probably, importantly, to make sure how do we secure some of the endpoints associated with the technology. I think that's really an area that we'll be reaching out to industry, academia and others to see how we best incorporate that.” https://www.c4isrnet.com/battlefield-tech/space/2020/08/19/us-army-network-team-sets-timeline-for-satellite-constellations/

  • NASSCO readying for one program’s end, downturn in repair workload

    27 février 2024 | International, Naval

    NASSCO readying for one program’s end, downturn in repair workload

    NASSCO is looking for new work to follow behind the soon-to-end Expeditionary Sea Base program, and is also hoping for an uptick in repair workload.

Toutes les nouvelles