15 juillet 2019 | International, Naval

General Dynamics Awarded $174 Million Contract for Submarine Work

GROTON, Conn. (July 11, 2019) - The U.S. Navy today awarded General Dynamics Electric Boat a $174 million contract for nuclear-submarine work. Electric Boat is a wholly owned subsidiary of General Dynamics (NYSE: GD).

Under the terms of the contract, Electric Boat will provide design agent, planning yard, and engineering services, as well as technical support for active nuclear submarines and submersible systems. The contract could be worth more than $1 billion over five years if all options are exercised and funded.

Seventy percent of the work will be performed at Groton; 13 percent at Kings Bay, Ga.; 10 percent at Bangor, Wash.; 3 percent at Pearl Harbor, Hawaii; and 2 percent at Newport and Quonset Point, R.I. Work performed under this contract is expected to be completed by September 2023.

General Dynamics Electric Boat has established standards of excellence in the design, construction and lifecycle support of U.S. Navy submarines. In its position as an industry leader, Electric Boat remains committed to applying its technical and business expertise to effectively manage the challenges of nuclear-submarine production. The company's three primary locations are in Groton and New London, Conn.; and Quonset Point, R.I. Its current workforce is approximately 17,000 employees.

More information about Electric Boat is available at www.gdeb.com.

For more information about General Dynamics, please visit www.generaldynamics.com.

http://www.gdeb.com/news/news_archives/2019archives.html#07-11-19

Sur le même sujet

  • German ministry seeks data on quicker fighter jet deliveries

    12 septembre 2018 | International, Aérospatial

    German ministry seeks data on quicker fighter jet deliveries

    Andrea Shalal BERLIN (Reuters) - The German military has asked potential bidders in a high-stakes competition to replace its aging Tornado fighter jets about accelerating deliveries of new warplanes before an initial target date of 2025, sources familiar with the matter said. The defense ministry posed the question in early August in a follow-up to its initial request for information from Europe's Airbus (AIR.PA) and Lockheed Martin (LMT.N) and Boeing (BA.N), both from the United States, the sources said. The ministry had no comment on the latest twist in a tender that could be worth billions of euros. One of the sources said the request signaled concerns about the growing cost of servicing the current fleet of 85 operational Tornado jets. Defence Minister Ursula von der Leyen says she favors a European solution - the Eurofighter Typhoon built by Airbus, Britain's BAE Systems and Italy's Leonardo SpA (LDOF.MI) - but Lockheed and Boeing still hope for a chance to bid for the work. Airbus and the U.S. government submitted data this spring about the four fighter jet models under consideration - the Eurofighter, Lockheed's F-35, and the Boeing F/A-18E/F or F-15E. Germany is studying a number of options, including buying one type of jet to replace the Tornado jets, a split buy of two aircraft types, and a service life extension of the Tornado jets, according to multiple sources familiar with the process. Germany has also asked Washington for information about the possibility of leasing Boeing F-15 fighter jets, two sources said, although that is seen as an unlikely outcome. Von der Leyen in July said she expected a preliminary decision on the next steps by the end of the year. POSSIBLE SPLIT BUY? One proposal calls for Germany to buy 40-45 Lockheed F-35 jets to replace those Tornados that can carry nuclear bombs, and about 75 new Eurofighters to replace both the other Tornados and a first batch of Eurofighters delivered between 2003 and 2008. Buying F-35s would allow Germany to keep a mixed fleet of fighter jets, a key requirement in its military strategy, while averting costly and time-consuming modifications to the process of certifying the Eurofighter to carry nuclear bombs. Although not a nuclear power, Germany hosts some U.S. nuclear warheads under NATO's nuclear-sharing policy and operates a number of Tornado warplanes that can deliver them. The U.S. has told Germany it could take 12 to 18 months to study the Eurofighter certification issue. German industry executives are pressing for quick answers, given that the already high cost of keeping the Tornado jets flying could rise once Britain and Italy phase out their fleets. “The cost of spare parts and operations keeps going up,” one industry executive said. https://www.reuters.com/article/us-germany-fighter/german-ministry-seeks-data-on-quicker-fighter-jet-deliveries-idUSKCN1LR24V

  • FVL: Bell, Sikorsky-Boeing Split $181M To Finalize FLRAA Designs

    18 mars 2020 | International, Aérospatial

    FVL: Bell, Sikorsky-Boeing Split $181M To Finalize FLRAA Designs

    After two years of intensive digital engineering, in 2020 the Army will pick either a Bell tiltrotor or a Sikorsky-Boeing compound helicopter to replace the UH-60 Black Hawk. By SYDNEY J. FREEDBERG JR. WASHINGTON: A Sikorsky-Boeing team won a $97 million award to refine their SB>1 Defiant high-speed helicopter over the next two years, the Army announced today, while Bell Textron won $84 million for its V-280 Valor tiltrotor. The two designs are vying to replace the Reagan-era UH-60 Black Hawk, the Army's workhorse air assault and medevac transport. The difference in amounts purely reflects the different approaches the two teams proposed for what's called Competitive Demonstration & Risk Reduction, Army officials told reporters. It doesn't imply either team has an advantage going into 2022, when the service will choose one design as its Future Long-Range Assault Aircraft (FLRAA), with the first operational units flying in 2030. FLRAA is just part of the flying “ecosystem” of manned and unmanned aircraft that the Army is developing under its Future Vertical Lift Cross Functional Team, which in turn is just one of eight CFTs working on 31 high-priority projects. But FLRAA has been unusually visible, literally, because – as part of a program called the Joint Multi-Role Tech Demonstration – both companies have prototype aircraft actually flying. As we've reported previously, the SB>1 Defiant started flight tests a year later than the V-280 Valor, but Army officials reasserted today they'll have enough test data on both aircraft. “The flight envelope continues to expand for Sikorsky-Boeing, so they're flying a bit more aggressively now than the V-280,” said Brig. Gen. Walter Rugen, head of the FVL CFT. “Towards the end of this fiscal year, maybe August, we're going to see very comparable data on both.” “Flight time is only one of the inputs that goes into a multivariable non-linear calculation,” added the Army's aviation acquisition chief, Program Executive Officer Pat Mason. Not all flight hours are equally valuable, he told reporters, and flight hours alone are not enough. “[It's] what you did in flight, what you've done in modeling and simulation, how you're administering model design, how you [set up] your digital engineering development environment, what you've done in your component test, lab test, SIL [System Integration Lab] test. Taking the totality of those elements into consideration, what we see is a good competition between two vendors.” So while the two aircraft will continue flying to provide more performance data, the lion's share of the work over the next two years will be digital, explained the Army's program manager for FLRAA. “The preponderance of this effort is associated with digital engineering and model-based systems engineering,” Col. David Philips said. That means taking the real-world data from physical tests and rigorously refining every aspect of the design to meet the Army's needs from flight performance, combat survivability, affordability, sustainability, safety and more. The program's reached the phase of design refinement that's traditionally handled by engineers with slide rules on “reams of paper,” Mason explained, but which will now be accomplished in painstakingly precise virtual models and simulations of every aspect of the aircraft. “That is the future of design,” Mason said. “The key is that digital environment.... digital engineering and model-based engineering.” The flight tests of physical aircraft are proving out their novel configurations – designed to achieve high speed and long range that are aerodynamically unattainable for conventional helicopters. But the digital design phase is especially suited for working out the software that's essential to everything from flight controls to navigation to evading incoming anti-aircraft missiles. Rather than have each vendor fit the electronic jigsaw together in their own unique, proprietary way, the Army insists that FLRAA, its sister design the FARA scout, and a whole family of drones all use the same Modular Open Systems Architecture. MOSA is meant to ensure that all the aircraft can easily share data on everything from maintenance diagnostics to enemy targets, and that the Army can easily replace specific components (hence “modular”) using whatever vendor offers the best technology (hence “open”). To ensure different vendors' products plug and play together, Mason said, “we specify what we need in those interfaces, and we flow those out in models.” Those models will include simulations of the aircrafts' physical characteristics, but, since they're software themselves, they can contain the actual prototype code for the Modular Open Systems Architecture. In other words — let's get digital. https://breakingdefense.com/2020/03/fvl-bell-sikorsky-boeing-split-181m-to-finalize-flraa-designs

  • White House asks for $11 billion more for Navy, Marine Corps spending

    13 mars 2023 | International, Naval

    White House asks for $11 billion more for Navy, Marine Corps spending

    Documents published by OMB offer an early look at the services' budget requests ahead of the Pentagon's rollout next week.

Toutes les nouvelles