10 mars 2023 | International, C4ISR

China’s neighbors seek expanded partnerships with US to deter, defend

The Pentagon’s efforts to improve U.S. force posture in the Pacific have yielded a flurry of major agreements, with allies motivated by China's behavior.

https://www.defensenews.com/pentagon/2023/03/10/chinas-neighbors-seek-expanded-partnerships-with-us-to-deter-defend/

Sur le même sujet

  • Contract Awards by US Department of Defense - January 2, 2019

    3 janvier 2019 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité

    Contract Awards by US Department of Defense - January 2, 2019

    NAVY Risk Mitigation Consulting Inc.,* Destin, Florida, is awarded a maximum amount $95,000,000 indefinite-delivery/indefinite-quantity contract for mission assurance assessments of installation/facilities infrastructure and facility-related control systems for the Department of the Navy . The work includes, but is not limited to the collection and evaluation of data concerning the criticality of facilities, utilities, industrial control systems, and supporting infrastructure based on mission impacts, probable threats and hazards, and degrees of vulnerability to determine the overall risk posture of the asset. Work will be performed at various Navy and Marine Corps installations at various locations within the Naval Facilities Engineering Command, Atlantic area of responsibility, both inside and outside the continentalU.S., including, but not limited to, California (24.6 percent); Virginia (13.0 percent); Florida (10.1 percent); Maryland (7.2 percent); Washington (5.8 percent); Hawaii (4.3 percent); Texas (4.3 percent); South Carolina (4.3 percent); Washington, District of Columbia (2.9 percent); North Carolina (2.9 percent); Mississippi (2.9 percent); Georgia (2.9 percent); Tennessee (1.5 percent); Rhode Island (1.5 percent); Pennsylvania (1.5 percent); New York (1.5 percent); New Jersey (1.5 percent); Louisiana (1.5 percent); Indiana (1.5 percent); Illinois (1.5 percent); Connecticut (1.4 percent); and Arizona (1.4 percent). The term of the contract is not to exceed 60 months with an expected completion date of January 1, 2024. Fiscal 2019 operations and maintenance (Navy) funds in the amount of $10,000 are obligated on this award, and will expire at the end of the current fiscal year. Future task orders will be primarily funded by operations and maintenance (Navy and Marine Corps). This contract was competitively procured via the Navy Electronic Commerce Online website and Federal Business Opportunities website, with six proposals received. The Naval Facilities Engineering Command, Atlantic, Norfolk, Virginia, is the contracting activity (N62470-19-D-2002). Raytheon Co., El Segundo, California, was awarded $81,224,627 for modification P00007 to a previously awarded fixed-price-incentive=-firm-target contract (N00019-17-C-0042). This modification provides for the procurement of 228 configuration components required for completion of Configuration D Retrofit Component engineering change proposals for the F/A-18E/F and EA-18G aircraft for the Navy and the government of Australia. Work will be performed in Forest, Mississippi (53 percent); Andover, Massachusetts (36 percent); and El Segundo, California (11 percent), and is expected to be completed in February 2022. Fiscal 2019 aircraft procurement (Navy); and Foreign Military Sales (FMS) funds in the amount of $81,224,627 will be obligated at time of award. No funds will expire at the end of the current fiscal year. This modification combines purchases for the Navy ($80,692,484; 99 percent) and the government of Australia ($532,143; 1 percent) under the FMS program. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. Lockheed Martin, Rotary and Mission Systems, Moorestown, New Jersey, is awarded a $28,882,337 cost-plus-incentive-fee modification to previously awarded contract N00024-16-C-5102 for AEGIS Baseline 9 Integration and Delivery, TI-08 CG Upgrade, AEGIS Baseline 9 Capability Development, Capability Improvements, Baseline 9 Sea Based Non-Cooperative Target Recognition Development and Radar Engineering. Work will be performed in Moorestown, New Jersey, and is expected to be complete by July 2019. Fiscal 2019 research, development, test and evaluation (Navy); fiscal 2013 shipbuilding and conversion (Navy); fiscal 2019 other procurement (Navy); 2019 operations and maintenance (Navy); and 2019 weapons procurement (Navy), funding in the amount of $28,882,337 will be obligated at time of award and funds in the amount of $1,530,764 will expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity. Bell-Boeing JPO, Amarillo, Texas, is being awarded $23,325,145 for cost-plus- fixed-fee delivery order N0001918F5004 against a previously issued basic ordering agreement (N00019-17-G-0002) in support of the V-22. This order provides support of ongoing flight test and evaluation of the V-22 test aircraft. Work will be performed at Naval Air Station Patuxent River, Maryland (90 percent); and Marine Corps Air Station Yuma, Arizona (10 percent), and is expected to be completed in December 2018. Fiscal 2018 aircraft procurement (Navy); and fiscal 2018 research, development, test and evaluation (Navy) funds in the amount of $23,325,145 will be obligated at time of award; none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. SRA International Inc., Chantilly, Virginia, was awarded an $11,336,940 firm-fixed-price contract for command, control, communications, and computer system afloat operations and sustainment support for capabilities aboard the Military Sealift Command (MSC) fleet of ships, and the MSC network operations centers. This contract includes a six-month period of performance. Work will be performed in Norfolk, Virginia, and work is scheduled to commence Jan. 1, 2019, and is scheduled to be completed June 30, 2019. This contract will be funded with Navy working capital funds; and U.S. Transportation Command working capital funds. Funds will expire at the end of the current fiscal year. This contract was awarded as an other than full and open requirement under unusual and compelling urgency procedures. Only one offer was solicited and received. The Navy's Military Sealift Command, Norfolk, Virginia, is the contracting activity. (N3220519C1000) (Awarded Dec. 31, 2018) Structural Associates Inc., * East Syracuse, New York, is awarded $10,008,000 for firm-fixed-price task order N4008519F4299 under a previously awarded multiple award construction contract (N40085-17-D-5048) for repairs for insulator shop relocation Building 166 at Portsmouth Naval Shipyard. The work to be performed provides building repairs and modernization to the historic 1941 Building 166. Exterior envelope repairs and replacement will include, but are not be limited to, roofing and wall systems, trim, windows and window systems, skylights, door repairs, concrete, the installation of roof and wall insulation, and reconfiguration of the building entrance to provide accessibility. Interior repair and renovation includes, but is not limited to, reconfiguration of existing toilet facilities, the renovation of electrical and plumbing systems, the replacement of deteriorated heating ventilation and air conditioning equipment and controls, and the modernization of fire protection systems. Work will include egress paths in order to improve space utilization, accessibility and life safety. The task order also contains five unexercised options, which, if exercised, would increase cumulative task order value to $10,691,110. Work will be performed in Kittery, Maine, and is expected to be completed by March 2020. Fiscal 2019 operations and maintenance (Navy) contract funds in the amount of $10,008,000 are obligated on this award and will expire at the end of the current fiscal year. Four proposals were received for this task order. The Naval Facilities Engineering Command, Mid-Atlantic, Norfolk, Virginia, is the contracting activity. Correction: Contract awarded on Dec. 27, 2018 to Bell Boeing JPO, Amarillo, Texas, was announced with the incorrect award amount and contracting activity. The contract should have stated the award amount of $ $24,448,390 and that the contracting activity is the Naval Air Warfare Center Aircraft Division, Lakehurst, New Jersey. All other contract information is correct. ARMY O'gara-Hess & Eisenhardt Armoring Co. LLC,* Fairfield, Ohio, was awarded a $60,736,752 firm-fixed-price contract to procure Family of Medium Tactical Vehicles protection kits. Bids were solicited via the internet with six received. Work locations and funding will be determined with each order, with an estimated completion date of Dec. 31, 2023. U.S. Army Contracting Command, Warren, Michigan, is the contracting activity (W56HZV-19-D-0041). Endeavor Robotics Inc., Chelmsford, Massachusetts, was awarded a $32,400,000 firm-fixed-price contract for reset, sustainment, maintenance, and recap parts for Robot Logistics Support Center technicians to support the overall sustainment actions of the entire Endeavor family of small, medium, and large robots. Bids were solicited via the internet with one received. Work locations and funding will be determined with each order, with an estimated completion date of Jan. 2, 2024. U.S. Army Contracting Command, Warren, Michigan, is the contracting activity (W56HZV-19-D-0031). CORRECTION: An $89,520,585 modification (0053 09) to contract W52P1J-11-G-0053 awarded to BAE Systems Ordnance Systems Inc., Radford, Virginia, announced Dec. 31, 2018, listed the wrong amount of funds obligated. The correct amount of obligated funds is $7,895,422. All other information in the announcement was correct. AIR FORCE BAE Systems Information and Electronics Systems Integration, Nashua, New Hampshire (FA8604-19-D-4021); The Boeing Co., Defense, Space & Security, St. Louis, Missouri (FA8604-19-D-4022); General Atomics Aeronautical Systems Inc.(GS-ASI), Poway, California (FA8604-19-D-4020); Goodrich Corp., UTC Aerospace Systems, ISR Systems, Westford, Massachusetts (FA8604-19-D-4023); Harris Corp., Electronic Systems, Integrated Electronic Warfare Systems, Clifton, New Jersey (FA8604-19-D-4027); Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas (FA8604-19-D-4026); Northrop Grumman Systems Corp., Northrop Grumman Aerospace Systems, Melbourne, Florida (FA8604-19-D-4024); and Raytheon Co., Raytheon, El Segundo, California (FA8604-19-D-40250), have been awarded $22,500,000 ceiling indefinite-delivery/indefinite-quantity contracts for the formation of a collaborative working group of various industry partners to work as single extended entity to develop, evolve, update via pre-planned product improvement initiatives, as well as manage and provide configuration control of the open mission systems and universal command and control interface standards, collectively referred to as the Open Architecture Standards. These contracts provide for the development, updating and management of the above standards with the following business goals, promote adaptability, flexibility, and expandability; support a variety of missions and domains; simplify integration; reduce technical risk and overall cost of ownership of weapon system programs; enable affordable technology refresh and capability evolution; enable reuse; enable independent development and deployment of system elements; and accommodate a range of cybersecurity approaches. Work will be performed at the industry partner facilities in Nashua, New Hampshire; St. Louis, Poway, California; Westford Massachusetts; Clifton New Hampshire; Fort Worth, Texas; and Melbourne, Florida, and is expected to be complete by December 31, 2022. This award is the result of a sole-source acquisition. Air Force Life Cycle Management, Wright Patterson Air Force Base, Ohio, is the contracting activity. *Small business https://dod.defense.gov/News/Contracts/Contract-View/Article/1723366/

  • Northrop Grumman Expands Plant 42 as B-21 Continues Development

    27 août 2019 | International, Aérospatial

    Northrop Grumman Expands Plant 42 as B-21 Continues Development

    By BRIAN EVERSTINE PALMDALE, Calif.—Northrop Grumman is expanding its side of the secretive Plant 42 facility here and hiring thousands of employees while development of the new B-21 bomber remains largely under wraps. An older tan hangar-turned-production facility sits next to recently built white and blue buildings. Another large hangar is still under construction, and trailers serving as offices are lined up on-site. Heavy equipment dug through the dirt as speakers praised the evolution of the legacy B-2, which is helping lay the foundation for its next-generation successor, at a recent birthday ceremony at Northrop's facilities. The company won't specifically say whether the growth is driven by the B-21 Raider, only that the new construction is for “programs.” But it has funneled “multiple hundreds of millions” of dollars to improve Plant 42, according to Janis Pamiljans, the president of Northrop's aerospace sector. The company has also grown from about 25,000 to 28,000 employees in California alone since 2015 and continues to hire. “We've been on a tremendous hiring spree ... and you can see the kind of structures being built,” Pamiljans said. Northrop moved some of its other systems, such as the RQ-4 Global Hawk and the MQ-4 Triton, to new locations so it can better serve production of those aircraft. The shifts also free up space for other endeavors. Reporters were not allowed near the new facilities during an escorted visit throughout the Southern California site earlier this week. No other companies that are involved in B-21 development were visible on the premises. The promise of a new design remained even as Northrop and the Air Force celebrated the B-2 turning 30 years old at an Aug. 20 event. The “Spirit of Missouri” was parked in front of a hangar that is now partially used to produce F-35 jet fuselage and is partially dedicated to “other programs,” Pamiljans said. The B-21 is eventually expected to replace the stealthy B-2 over the coming decades. Northrop plans to use the Spirit program's focus on supportability, sustainability, and mission-capable rate as the blueprint for maintaining the B-21 as well. Northrop officials say they are taking lessons learned in the development and sustainment of low-observable technology, a key to the B-2's stealth, and applying them to these “other programs,” Pamiljans said. “The B-2 is setting the path, course for the B-21,” Pamiljans said. “What we've learned on B-2, we're finding baselined into the design of the B-21.” Eighth Air Force Commander Maj. Gen. James Dawkins told reporters in Palmdale that aspects of B-2 sustainment like computers, maintenance, and materials can naturally be leveraged for the B-21. He said the platform's cost and schedule performance are “right on expectations.” “From that standpoint, it's been very successful so far,” he said. “We're really happy about the way Northrop has approached this.” The Air Force remains mum about the state of B-21 production, other than to occasionally say it is going well. Air Force Vice Chief of Staff Gen. Stephen Wilson said last month the service is planning first flight of the B-21 in December 2021. The service is so far sticking with its plan to buy at least 100 of the bombers to go with 75 B-52s that will remain in service. The Air Force and Northrop continue to crunch overall production numbers, and haven't settled on an exact strategy for phasing out the B-2 as the B-21 comes online. There will be a transition period when both the B-2 and B-21 will be part of the strategic bomber fleet, Dawkins said. “I'm optimistic they will take lessons learned” from the B-2 for “any type of program” the company is developing, he added. http://www.airforcemag.com/Features/Pages/2019/August%202019/Northrop-Grumman-Expands-Plant-42-as-B-21-Continues-Development.aspx

  • F-22 cut from US Air Force data-sharing prototype

    18 janvier 2023 | International, Aérospatial

    F-22 cut from US Air Force data-sharing prototype

    Officials told the GAO the decision to exclude the F-22 stems from the fighter's "reduced role in the future force structure," among other factors.

Toutes les nouvelles