Back to news

September 26, 2018 | Local, Aerospace

Transport Canada looking at used German drone to patrol Arctic

Murray Brewster · CBC News

A used German drone is one of a handful of aircraft under consideration by Transport Canada for its long-delayed Arctic surveillance program.

A spokeswoman for the department said no decision has been made about the kind of remotely-piloted system the department will purchase.

Marie-Anyk Cote said the plan is to buy an aircraft to detect and monitor oil spills, survey ice levels and marine habitats and keep track of shipping and ice movement in Canada's far northern waters.

"As part of its technical assessment, the government sought information from suppliers to better understand the technology and the solutions available," Cote said in an email.

The Associated Press reported on Monday that Canada was negotiating with Germany to purchase a secondhand Global Hawk surveillance drone, which originally cost the Germans $823 million.

'Premature'

Cote said "it is still premature to speculate which remotely piloted aircraft system will be purchased" and that the evaluation is still underway.

In a statement issued to AP, Germany's defence ministry said talks with Canada were planned, but declined to comment on a possible sale price or closure date.

The news surfaced in a response to lawmakers tabled by the German government in the Bundestag, Germany's parliament. It stated that Germany has decided to "begin concrete negotiations with Canada for the sale of the Euro Hawk aircraft, two ground stations and possibly certain spare parts."

Northrop Grumman, the maker of the Global Hawk, pitched the Canadian military on buying the high-altitude surveillance system a few years ago.

New, the aircraft cost more than US $131 million each.

National Defence has its own, separate drone program which is not expected to start delivering aircraft until 2021. That new fleet will not be fully operational until 2023.

The drone under consideration by Transport Canada is a prototype that was purchased by the Germans in 2000, according the AP report.

It has flown only a handful of times; the program was cancelled because of skyrocketing costs and the German government's inability to get it certified to fly in Europe. According to 2013 German media reports, the manufacturer had refused to share technical data with the German government and the drone lacked an anti-collision alarm required by European regulators.

According to the German government's written response, the drone has now been "demilitarized" — meaning it has been stripped of its U.S.-made radio equipment, GPS receiver and flight control system.

Drone or missile?

There could be more complications ahead if Ottawa is successful in negotiations with the Germans.

A year ago, CBC News reported the Arctic drone surveillance program had been delayed because of complex international arms control rules that would categorize the unmanned aircraft as a missile.

The federal government approved $39.5 million for a technical assessment in 2015 — and the plan had been to have a small fleet airborne by last spring.

Officials told CBC News last year that they were not expecting delivery of the drones until 2020.

The Missile Technology Control Regime (MTCR), adopted by Canada and 34 other countries, was intended to prevent the spread of weapons systems that can deliver nuclear missiles. Drones were added to the list recently and the rules restrict missiles and drones from carrying a payload of more than 500 kilograms or travelling more than 300 kilometres.

A fully loaded Global Hawk can carry a sensor suite payload weighing up to 540 kilograms.

With files from the Associated Press

https://www.cbc.ca/news/politics/transport-canada-looking-at-used-german-drone-to-patrol-arctic-1.4838364

On the same subject

  • Electrical Components International Acquires Promark Electronics

    July 6, 2021 | Local, Aerospace, Naval, Land, C4ISR, Security

    Electrical Components International Acquires Promark Electronics

    July 06, 2021 08:00 AM Eastern Daylight Time ST. LOUIS & MONTREAL--(BUSINESS WIRE)--Electrical Components International, Inc. (“ECI”), a leading global supplier of wire harnesses, electrical components, and sub-assemblies for diversified industrial markets, today announced the acquisition of Promark Electronics Inc. (“Promark Electronics”). Founded in 1987 by Syd Knecht, Promark Electronics is a manufacturer of wire harnesses and cable and electromechanical assemblies utilized by commercial electric vehicles and other technically-complex, mission-critical products. With the growing demand for commercial electric vehicles, Promark Electronics has developed high-voltage cable and assemblies as part of its ProEV™ platform, which has made it a trusted partner to leading commercial electric vehicle manufacturers. The company will continue and expand its manufacturing operations in its Montreal, Quebec, Canada facilities. “We are excited to partner with Promark Electronics and establish ECI as the high-voltage harness supplier of choice in high-value, high-growth markets,” said Mike Balsei, Chief Executive Officer of ECI. “With ECI's global scale and Promark Electronics' proprietary solutions, we will be able to help manufacturers meet the increasing demand for commercial electric vehicles as well as in adjacent e-mobility verticals.” The Knecht Family will continue to lead the Promark Electronics team. In a joint statement, Jarred, Brandon, and Robert Knecht commented: “We are incredibly proud of the business and reputation that our family has built over the past three decades. We are thrilled to have found an industry-leading partner to help us further accelerate our growth, particularly in the e-mobility space. We are excited to join the ECI family, deepen our customer relationships, and continue our long track record of innovation and excellence.” ECI is a portfolio company of Cerberus Capital Management, L.P. (“Cerberus”), a global leader in alternative investing. Earlier this year, ECI acquired Omni Connection International, a manufacturer of wire harnesses and connection systems for leading tier one automotive suppliers. Michael Sanford, Senior Managing Director at Cerberus, added: “Promark Electronics adds a highly complementary platform serving a rapidly growing market. We remain excited about the strategic opportunities for ECI and look forward to supporting the business' continued growth.” Barclays served as financial advisor and Blake, Cassels & Graydon LLP and Debevoise & Plimpton LLP served as legal counsel to ECI and Cerberus. Lincoln International LLC, Crowe BGK, and EY served as financial advisors to Promark Electronics and Osler, Hoskin & Harcourt LLP acted as legal counsel. About ECI Founded in 1953, Electrical Components International, Inc. (ECI) is one of the world's leading wire harness, electrical components, and sub-assembly suppliers for diversified industrial markets. With nearly 22,000 employees in 31 facilities spanning eight countries and four continents, ECI's “blue-chip” customer base includes many firms in the Fortune 500 across the appliance, HVAC, construction, agriculture, transportation, and critical infrastructure sectors. For more information about ECI, visit www.ecintl.com. About Promark Electronics Founded in 1987 by Syd Knecht and headquartered in Montreal, Quebec, Canada, Promark Electronics is a state-of-the-art electronics manufacturer, serving OEMs in industries with complex production processes and applications, including e-mobility, industrial technology, medical, mining, aerospace, space, and defense industries. For more information, visit www.PMK.com. About Cerberus Founded in 1992, Cerberus is a global leader in alternative investing with over $55 billion in assets across complementary credit, private equity, and real estate strategies. We invest across the capital structure where our integrated investment platforms and proprietary operating capabilities create an edge to improve performance and drive long-term value. Our tenured teams have experience working collaboratively across asset classes, sectors, and geographies to seek strong risk-adjusted returns for our investors. For more information about our people and platforms, visit us at www.cerberus.com. Contacts ECI Julie Mottershead julie.mottershead@ecintl.com (314) 261-7774 Cerberus Akash Lodh Sard Verbinnen & Co. Cerberus-SVC@sardverb.com (202) 758-4263

  • Determining how to upgrade the Griffon helicopter a focus for RCAF this year

    January 25, 2018 | Local, Aerospace

    Determining how to upgrade the Griffon helicopter a focus for RCAF this year

    DAVID PUGLIESE, OTTAWA CITIZEN More from David Pugliese, Ottawa Citizen It's going to take a while to do but the RCAF plans to extend the life of its Griffon helicopters out to the 2030s. “The project will replace obsolete cockpit instruments and avionics with components that are supportable to the mid-2030s,” the RACF noted. Adaptation and integration of existing avionics and electronic flight instruments in the aircraft will enable an extension of the life of the Griffon. Griffon flight simulators will be modified to conform to the fleet. Finally, the project will ensure integrated logistic support, supply of initial spares and training. The anticipated timeline is as follows: 2018 – Definition Approval (Definition is what should be done to meet the capability need, to determining how the preferred option will be implemented) 2020 – Implementation Approval, Request for Proposal Release, Contract Award 2024-2025 – Initial Operating Capability for Life-extended Griffons 2026 – Final Delivery It should be noted that this project has been delayed from its previous schedule. In 2015, the RCAF put definition approval for 2016. In addition, implementation, issuing of an RFP and awarding a contact were all to be done in 2018. Final delivery of the upgraded helicopters was to have taken place in 2024 under the old schedule. http://ottawacitizen.com/news/national/defence-watch/determining-how-to-upgrade-the-griffon-helicopter-a-focus-for-rcaf-this-year

  • Senator critiques defence procurement process

    February 13, 2019 | Local, Aerospace

    Senator critiques defence procurement process

    by Chris Thatcher An Ontario Senator says defence procurement needs better oversight and an improved process if it is to avoid the problems affecting the government's efforts to replace the Royal Canadian Air Force (RCAF) CF-188 fighter jet fleet. “The fiasco of fighter jet replacement is the best example of a procurement system that is cumbersome, bureaucratic and beset by political interference,” Senator Nicole Eaton wrote in an article originally published in The Hill Times. “Unless ministers start to devote close attention to the management of major projects, or until the process is overhauled, Canadians can continue to expect poor outcomes and wasted taxpayer dollars.” Eaton is a member of the Senate National Finance Committee, which launched a study last fall into the processes and financial aspects of defence procurement. It held its first hearing on Oct. 30 and expects to conclude later this year. In her article, the senator critiqued the process by which Conservative and Liberal governments have struggled to replace the aging CF-188 Hornets, noting that while both Canada and Australia are members of the U.S.-led Joint Strike Fighter program to develop the F-35, Australia received its first two operational F-35s in December while Canada, as part of an interim measure, is poised to take delivery of the first of 25 “well-used” Australian F-18s. “As we take possession of Australia's scrap, Canada is in the early stages of a minimum five-year-long process to pick a replacement for the F-18, which will be more than 50 years old before it is retired in the 2030s,” she wrote. The current government bears blame for creating some of the problems with the fighter file, she wrote, but “military procurement has bedeviled successive governments, Liberal and Conservative alike.” She attributed part of the problem to political interference for both partisan advantage and regional turf protection, but said the main reason for “paralysis in military procurement in Canada is it is too cumbersome and bureaucratic. Process is paramount and results are secondary. “There are layers of committees, depending on the size of the project, with membership from Public Services and Procurement Canada, National Defence, and Innovation, Science and Economic Development,” she wrote. “The consensus-based decision-making process on which these committees operate is supposed to avoid a big mistake — no doubt an appealing quality for a risk-averse bureaucracy, but the downside is the system is not conducive to fast action. Simply put, the buck stops nowhere.” Eaton suggested that bureaucratic morass has resulted in an inability to spend allotted project budgets, an indication the government could struggle to fulfil the commitments laid out in its 2017 defence policy, Strong, Secure, Engaged (SSE). “In the last fiscal year, the policy projected capital spending of $6.1 billion, yet only $3.7 billion was spent. This year, $6.55 billion is called for under SSE, but total appropriations to date amount to $4 billion,” she noted. “Given this poor track record, the idea that military spending can be cranked up by 70 per cent over 10 years, as envisioned in Strong, Secure, Engaged, looks increasingly fanciful. At the Finance committee's first hearing on the procurement system, Patrick Finn, assistant deputy minister, Materiel at the Department of National Defence, and André Fillion, assistant deputy minister for defence and marine procurement at Public Services and Procurement Canada, faced a barrage of questions on ongoing participation in the F-35 program, the authorities and mandates of interdepartmental committees involved in military procurement, and about the challenge of balancing military requirements with equipment costs and opportunities for Canadian industry. “Buying a fighter plane isn't like buying a compact car, and the role of the government is very important. We had to adapt our method of supply to the context of fighter jets,” Fillion told the senators. He said a draft RFP released in late October “was the result of many months of consultation on all five potential options (to replace the CF-188s). “There has been a lot of back and forth over the last several months to make sure that what we are asking meets the requirements of the Air Force and ensures that we do not inadvertently limit the competition. I feel very confident that what we've put together is fair, open and transparent to all the potential suppliers.” Finn said the government had met with and learned lessons from allies who had conducted similar fighter replacement programs. He also dismissed some of the concerns about acquiring used Australian aircraft to fill a gap while the government proceeds with the replacement project. “In our opinion, Canada has the best expertise related to this type of aircraft. Some companies in Montreal do maintenance for the United States and other countries because they have the necessary knowledge,” he said. “This aircraft will really increase our fleet, and it is not the number of aircraft that counts; it is rather the hours of use in the future. We are looking for an aircraft that will remain in service for another 14 years. What is needed is enough hours on the structural side. We will be able to use these aircraft until the entire fleet is no longer in service.” https://www.skiesmag.com/news/senator-critiques-defence-procurement-process

All news