Back to news

February 13, 2019 | Local, Naval

MDA Selected for Design Phase of Canadian Surface Combatant Program

RICHMOND, BC, Feb. 8, 2019 /CNW/ - MDA, a Maxar Technologies company (NYSE: MAXR) (TSX: MAXR), today announced that Canada's Combat Ship Team was selected by Irving Shipbuilding for the design contract for Canada's Surface Combatant (CSC) ships. Irving Shipbuilding is the Canadian Surface Combatant Prime Contractor and will build all 15 ships at Halifax Shipyard. As a core member of the design team, MDA's primary role will be to design the Electronic Warfare suite system for the CSC program.

The CSC is a globally deployable, multi-role warship designed to meet the distinctive mission requirements of the Royal Canadian Navy. MDA is partnered with other industry leaders including BAE Systems, CAE, Lockheed Martin Canada, L3 Technologies, and Ultra Electronics as Canada's Combat Ship Team to provide the Royal Canadian Navy the most advanced and modern warship design. Purposely designed for anti-submarine warfare and capable of performing a variety of missions in any part of the world, the CSC is acoustically quiet, versatile, highly survivable, and reconfigurable for future modernization. The most recent Canadian Defence Policy stated that 15 of these ships will be built in Canada over the next 25 years and will serve the Royal Canadian Navy for decades to come.

"MDA is proud to play such a critical role in supplying systems and subsystems for the Canadian Surface Combatant program," said Mike Greenley, group president of MDA. "Our low-risk, lower life-cycle cost CSC solutions are based on proven technologies and will enable Canadian security and peacekeeping operations around the world by providing advanced intelligence and protection for our brave sailors. These Canadian-built solutions further unlock enormous economic benefits and return on investment to the nation, particularly in Quebec, Ontario, British Columbia and Nova Scotia, as we seek to export these technologies globally in the years ahead secure our position as a global technology leader."

This contract is for the CSC design phase within which MDA is responsible for the Electronic Warfare design. Over the life of the program, MDA expects to perform multiple roles on the Lockheed Martin Canada team for CSC. Work on four pivotal areas of the program would create more than 200 new, high-quality jobs in MDA's Quebec, Ontario, British Columbia, and Nova Scotia facilities. MDA's roles include:

  • Lead the Electronic Warfare system integration by procuring best-value subsystems for each functional element and providing an advanced Electronic Warfare solution for installation onto each CSC ship, leveraging MDA's deep Canadian expertise in project management, system engineering, electronics, antennas, signal processing and software.
  • Build an advanced radar system critical to the integrated CSC weapons system, which is well positioned to be exported to the global naval market.
  • Partner with L3 WESCAM to build a Laser Warning and Countermeasures System that is part of the overall Electronic Warfare system suite and will defend against emerging laser-guided threats that are particularly dangerous for the CSC and its crew in littoral environments.
  • Partner with Lockheed Martin Canada to develop an advanced Electronic Warfare jamming subsystem, based on proven components and electronics similar to those used by MDA for both its space and terrestrial communications and radar programs.

About MDA
MDA is an internationally recognized leader in space robotics, space sensors, satellite payloads, antennas and subsystems, surveillance and intelligence systems, defence and maritime systems, and geospatial radar imagery. MDA's extensive space expertise and heritage translates into mission-critical defence and commercial applications that include multi-platform command, control and surveillance systems, aeronautical information systems, land administration systems and terrestrial robotics. MDA is also a leading supplier of actionable mission-critical information and insights derived from multiple data sources. Founded in 1969, MDA is recognized as one of Canada's most successful technology ventures with locations in Richmond, Ottawa, Brampton, Montreal, Halifax and the United Kingdom. MDA has supported the Royal Canadian Navy for over two decades. For more information, visit www.mdacorporation.com.

About Maxar Technologies
As a global leader of advanced space technology solutions, Maxar Technologies is at the nexus of the new space economy, developing and sustaining the infrastructure and delivering the information, services, systems that unlock the promise of space for commercial and government markets. As a trusted partner, Maxar Technologies provides vertically integrated capabilities and expertise including satellites, Earth imagery, robotics, geospatial data and analytics to help customers anticipate and address their most complex mission-critical challenges with confidence. With more than 6,100 employees in over 30 global locations, the Maxar Technologies portfolio of commercial space brands includes MDA, SSL, DigitalGlobe and Radiant Solutions. Every day, billions of people rely on Maxar to communicate, share information and data, and deliver insights that Build a Better World. Maxar trades on the New York Stock Exchange and Toronto Stock Exchange as MAXR. For more information, visit www.maxar.com.

https://www.newswire.ca/news-releases/mda-selected-for-design-phase-of-canadian-surface-combatant-program-836299961.html

On the same subject

  • New logistics trucks being delivered to the Canadian Armed Forces

    September 21, 2018 | Local, Land

    New logistics trucks being delivered to the Canadian Armed Forces

    September 21, 2018 – Petawawa, ON – National Defence / Canadian Armed Forces Through Canada's defence policy, Strong, Secure, Engaged, the Government of Canada has committed to providing the women and men of the Canadian Armed Forces (CAF) with the equipment they need to do their jobs. In the spirit of that commitment, Defence Minister Harjit S. Sajjan today highlighted new Standard Military Pattern trucks being delivered to the CAF. Logistics vehicles like these trucks form the backbone of ground transportation for our Regular and Reserve forces, and can be found at the heart of nearly every Canadian Armed Forces operation. They are used to move critical equipment, personnel and supplies to wherever they need to be. Whether they are helping Canadian communities deal with severe flooding or other national disasters, or supporting NATO operations in Latvia and throughout Eastern Europe, our women and men will be able to rely on these new trucks for decades to come. More than 1500 trucks, 300 trailers, and 150 armoured protection systems are expected to be delivered over the next two years. This $834-million project remains on budget. The purchase of these trucks is subject to the Industrial and Technological Benefits (ITB) Policy, which requires that for every dollar the government spends on major defence purchases, the winning contractor must put a dollar back into Canada's economy. Through this policy, the government's purchasing power is being used to support innovation and create well-paying middle-class jobs. Quotes “As outlined in our defence policy Strong, Secure, Engaged, our government is committed to ensuring the women and men of our Canadian Armed Forces have the tools and equipment they need to do the important jobs we ask of them. The delivery of these new trucks will support our women and men – and especially our Reservists – in their operations. We look forward to their delivery at bases across the country.” Defence Minister Harjit S. Sajjan “The Industrial and Technological Benefits Policy generates investments that lead to high-skilled, good-paying middle-class jobs for Canadians. We are using necessary investments in the Canadian Armed Forces and Coast Guard to drive innovation and grow businesses, both of which boost our economy as a whole.” Innovation, Science, and Economic Development Canada Minister Navdeep Bains “These trucks are a key piece of equipment to help the Canadian Armed Forces complete both bigger missions and the everyday tasks that keep their operations running smoothly. These deliveries are yet another example of our government's commitment to providing the equipment needed to carry out important missions on behalf of all Canadians.” Public Services and Procurement Canada Minister Carla Qualtrough Quick Facts In July 2015, the Government of Canada awarded two contracts to Mack Defense, valued at a total of $834 million, to deliver new trucks, trailers, armour protection systems and in-service support. The procurement of these trucks is part of our wider effort to modernize our fleet of logistics trucks and mobile workspaces. The new trucks have the ability to carry up to 9.5 tonnes. Deliveries of the new trucks started in April 2018 in Edmonton. Deliveries have also started in Petawawa. Deliveries will soon begin in Montreal, Valcartier, and Gagetown. To date, 46 new logistics trucks have been delivered to the CAF. - 30 - Associated Links Medium Support Vehicle System Project Contacts Byrne Furlong Press Secretary Office of the Minister of National Defence Phone: 613-996-3100 Media Relations Department of National Defence Phone: 613-996-2353 Email: mlo-blm@forces.gc.ca

  • Stantec to design two fighter jet facilities in Quebec and Alberta - Construction Canada

    August 16, 2021 | Local, Aerospace

    Stantec to design two fighter jet facilities in Quebec and Alberta - Construction Canada

    Global architecture, engineering, and design firm Stantec has been selected to design the Future Fighter Capability Project Fighter Squadron Facilities at 3 Wing Bagotville, Que. and the Fighter Squadron Facility at 4 Wing Cold Lake, Alta. Jodoin Lamarre Pratte architectes has been mandated, within the multidisciplinary team assembled by the joint-venture of builders Ellis Don / EBC and Stantec in engineering, to design the fighter jets squadron facility on one of the main bases of operations which will host the new aircrafts Canada will acquire by 2025.

  • Navy's new Arctic ship sidelined until April because of mechanical problems

    December 5, 2022 | Local, Naval

    Navy's new Arctic ship sidelined until April because of mechanical problems

    The repairs to HMCS Harry DeWolf won’t be covered by Irving Shipbuilding because the warranty for the company’s workmanship on the vessel, delivered in 2020, was only for one year, a National Defence spokesperson said.

All news