Back to news

August 29, 2019 | International, Land

Swiss seek package deal of ground-based weapons, combat aircraft

By: Sebastian Sprenger

COLOGNE, Germany — The Swiss government plans to make the integration of combat aircraft and ground-based air defense assets a key benchmark in its planned $8 billion Air 2030 program, according to officials.

Program leaders disclosed the desire for a high degree of interplay between the two competing missile-defense offers and four possible aircraft types during a news conference in the capital Bern earlier this month. The comments reveal a new front in the selection criteria for one of Europe's most prized defense acquisitions, where the air and ground portions had always existed as separate tracks.

Fear of fratricide in Switzerland's small and crowded airspace is one of two key factors driving the need for close integration between ground and aerial assets, said Swiss Air Force Col. Marco Forrer. Given the country's alpine terrain and the requirement to hit targets more than 50 kilometers away and over 12 kilometers high, official are concerned about erroneously downing civilian planes, he said.

“That's why BodLuv has to be integrated into the Air Force operational picture and command-and-control network,” Forrer said, referring to the German-language acronym for the ground-based program Bodengestützte Luftverteidigung.

Forrer added that a high level of integration also is crucial to keeping costs down, enabling air defenders to engage targets with greater precision and — hopefully — fewer misses.

Of the total Air 2030 program, $6 billion is slated for a new fleet of aircraft, while $2 billion is budgeted for ground-based defenses.

In the aerial segment, the planes in play are the Airbus Eurofighter Typhoon, the Lockheed Martin F-35, Dassault's Rafale and Boeing's F-18 Super Hornet.

In the ground segment, Swiss officials are left with choosing between Raytheon's Patriot and the SAMP-T system, which is made by an MBDA-Thales consortium called Eurosam. Israel's Rafael, which was also invited to bid with its David's Sling system, never responded to the invitation, presumably following pressure by the Israeli or American governments to stay out of the race.

Swiss officials have complained that they never got a straight answer explaining Rafael's abstention, and the company's non-response has left them worried about the losing an element of competition in the race that could make for lower costs.

“It can have a negative impact on the competitive situation,” said Christian Catrina, who oversees Air 2030 at Switzerland's defense ministry. “We will never know if so and how strongly. We would have appreciated having three contenders.”

Following a similar wave of aircraft tests in Switzerland over the spring and early summer, evaluations of the two ground-based systems, namely regarding their radar sensors, began this month. First up is the Patriot system with a two-week test, which will end Aug. 30; SAMP-T is next, beginning Sept. 16.

The tests will take place at an army range near Menzingen, central Switzerland, where the Swiss operated the Bloodhound weapon system until its retirement in the late 1990s.

https://www.defensenews.com/global/europe/2019/08/28/swiss-seek-package-deal-of-ground-based-weapons-combat-aircraft/

On the same subject

  • Dassault lance un ultimatum à Airbus sur l'avion de chasse du futur

    March 7, 2022 | International, Aerospace

    Dassault lance un ultimatum à Airbus sur l'avion de chasse du futur

    Redressement dans l'aviation d'affaires et succès à l'exportation pour le Rafale, Dassault Aviation a enregistré en 2021 plus de 12 milliards d'euros de commandes, contre 3,5 milliards en 2020. L'avionneur estime que les prétentions d'Airbus sur le projet franco-allemand espagnol de système de combat aérien du futur ont franchi « les lignes rouges ».

  • Budget Shows Flightworthy Sixth-Generation Fighter Engines Ready By 2025

    August 3, 2020 | International, Aerospace

    Budget Shows Flightworthy Sixth-Generation Fighter Engines Ready By 2025

    Steve Trimble July 31, 2020 Details of the first of two mostly secret initiatives to support the U.S. Air Force's five-year-old pursuit of a sixth-generation successor to the Lockheed Martin F-22 are now released and reveal that a critical technology for the Next-Generation Air Dominance program could become flightworthy by mid-2025. GE Aviation and Pratt & Whitney are scheduled to complete separate competitive designs for a Next-Generation Adaptive Propulsion (NGAP) system by the second quarter of 2022 and finish assessments on a full-scale engine three years later, according to Air Force budget documents. The schedule and spending details on the NGAP appeared for the first time in the Air Force's budget justification documents for fiscal 2021 that were submitted to Congress in February, but passed unnoticed for several months. The Air Force awarded GE and Pratt each a $427 million contract to support the NGAP program, but the details were shrouded in budget documents within the related Adaptive Engine Transition Program (AETP), an unclassified effort to develop a reengining candidate for the Lockheed F-35. After Senate authorizers cited the Air Force's lack of transparency for justifying a $270 million budget cut for AETP this year, service officials decided to break out funding for the NGAP in budget documents. In fact, the NGAP program reappeared in the fiscal 2021 budget documents for the first time in more than six years. The Air Force has kept all details about the Next-Generation Air Dominance (NGAD) program highly secret since 2016, but there was a brief, two-year window in 2014-15 when senior defense officials provided information about the underlying technology development efforts. The NGAP was first referenced in testimony by Alan Shaffer before House Armed Services Committee in March 2014. Shaffer is now the deputy to Ellen Lord, undersecretary of defense for acquisition and sustainment. Six years ago, he was the principal deputy to the director for research and engineering. In that role, Shaffer introduced the NGAP as an enabler to the NGAD program, along with another, complementary initiative focused on new airframes. “This program will develop and fly two X-plane prototypes that demonstrate advanced technologies for future aircraft,” Shaffer said in 2014. “Teams will compete to produce the X-plane prototypes, one focused on future Navy operational capabilities, and the other on future Air Force operational capabilities.” A year later, Frank Kendall, then undersecretary of defense for acquisition, technology and logistics, elaborated on the Aerospace Innovation Initiative (AII). The development of the X-planes would be led by DARPA, he said. “To be competitive, the Navy and the Air Force each will have variants focused on their mission requirements,” Kendall said. “There will be a technology period leading up to development of the prototypes. This will lead to the systems that ultimately will come after the F-35.” The results of the AII program have not been released or even acknowledged by Air Force or defense officials since 2015, but the initiative suggests that one or two X-plane aircraft could be in testing now. Kendall's remarks to Congress in 2015 came a year before the Air Force received the results of an Enterprise Capability Collaboration Team on the Air Superiority 2030 Flight Plan, which urged the development of a family of systems anchored by a next-generation fighter to replace the F-22. The Flight Plan prompted the Air Force to commission an analysis of alternatives (AoA) in late 2016. The results of that study were originally scheduled to be released by the end of 2017, but the analysis continued until early 2019. Meanwhile, a 2015 presentation by the Air Force Research Laboratory showed a notional schedule for the NGAD program; a contract award to launch the engineering and manufacturing development (EMD) phase is set for fiscal 2023. As late as the Air Force's fiscal 2019 budget request, the financial resources devoted to the NGAD appeared to support that schedule: A significant increase in funding starts in fiscal 2023, and $13 billion is set aside overall between fiscal 2019 and 2023. Last year, however, as the results of the AoA study became available, the Air Force appeared to defer the launch of the EMD by at least a few years. The fiscal 2020 budget request included only $6.6 billion for the NGAD from fiscal 2020-24. Funding for the NGAD and NGAP programs is accounted for separately in Air Force budget documents. The fiscal 2021 budget justification documents reveal that the Air Force spent $106 million for the NGAP in fiscal 2019. Another $224 million is allocated to the NGAP this year. But the program has requested an additional $403 million in fiscal 2021, the budget documents show. “The Next-Generation Adaptive Propulsion effort consists of four phases: preliminary design, detailed design, engine fabrication and engine assessments,” the Air Force's budget documents state. “Program deliverables include military adaptive engine detailed design parameters and models, engine hardware (plus spare parts), matured technologies, major rig assessment data (controls, combustor, etc.), program reviews, and technology, affordability and sustainability studies for next generation fighter aircraft,” the documents add. https://aviationweek.com/defense-space/budget-policy-operations/budget-shows-flightworthy-sixth-generation-fighter-engines

  • With new CH-47 variant back in flight tests, Boeing hopes for production contract

    April 19, 2021 | International, Aerospace, C4ISR

    With new CH-47 variant back in flight tests, Boeing hopes for production contract

    Boeing is expecting the Army to award a first production contract for the CH-47F Block II Chinook this fiscal year as it dives back into flight testing.

All news