Back to news

October 16, 2018 | Local, Naval

Irving Shipbuilding pushing for two more Arctic/Offshore Patrol Ships, all Halifax-class work

DAVID PUGLIESE, OTTAWA CITIZEN

Efforts are underway by Irving Shipbuilding to convince the federal government to build two more Arctic and Offshore Patrol Ships at its Halifax yard. Irving also wants all Halifax-class frigate maintenance work to remain with the yard in Nova Scotia.

The federal government is looking at splitting up maintenance work on the Canadian navy's frigates between Irving and Davie in Quebec. It is facing objections from Irving and its workers. The Irving employees warn the change will mean lost jobs in Nova Scotia.

There are seven frigates that will need maintenance on the east coast over a five-year period. But military and Department of National Defence officials are concerned the Irving yard in Halifax won't be able to handle all the work as it will also be in the midst of building the new fleet of Canadian Surface Combatant warships. There are concerns that the navy's capabilities could suffer if the work isn't split up between Davie and Irving yards.

Each of the aging Halifax-class frigates will require about a year of maintenance work, and in 2020 the navy expects maintenance will be needed on two frigates at the same time.

Irving argues it needs all the Halifax-class work and the construction of two more AOPS so it doesn't face any downturn in activity at the yard. “ We are hopeful that the Government of Canada will continue the work at Halifax Shipyard,” Irving spokesman Sean Lewis said of the frigate maintenance.

Asked about the need for two more AOPS, Lewis stated the following: “We continue to work closely with the Government of Canada to explore the overall transition between the Arctic and Offshore Patrol Ship (AOPS) and Canadian Surface Combatant (CSC) programs. The construction of additional AOPS for Canada or international export opportunities is being considered and various options pursued. At this time it is premature to comment further.”

In response to Irving's push, Davie official Frédérik Boisvert has noted that while Irving has $ 65 billion in contracts from the federal government and 1900 workers, Davie has received less than $ 1billion in contracts and has less than 200 people working and 1400 laid off workers, waiting to be recalled. “If they (Irving) are concerned about Nova Scotian jobs, they should explain to their union workers why they are building their own tugs in Eastern Europe,” Boisvert added.

https://lfpress.com/news/national/defence-watch/irving-shipbuilding-pushing-for-two-more-arctic-offshore-patrol-ships-all-halifax-class-work/

On the same subject

  • Government will review towing vessel contract after procurement process questioned by trade tribunal

    January 24, 2019 | Local, Naval

    Government will review towing vessel contract after procurement process questioned by trade tribunal

    DAVID PUGLIESE, OTTAWA CITIZEN The federal government will review a contract awarded last year for emergency towing vessels after the Canadian International Trade Tribunal raised questions about its procurement process. In early January, the Canadian International Trade Tribunal recommended the government review the key performance requirements used in the procurement of two emergency towing vessels for the west coast from an Irving firm. Heiltsuk Horizon, a partnership of majority partner Heiltsuk Nation of Bella Bella, British Columbia and Horizon Maritime Services Limited, a Canadian marine services company, complained to the CITT last August that the winning supplier did not meet important safety requirements of the tender process. “We're confident with the new, state of the art vessels we've submitted, and we want to ensure the right emergency response vessels are in place to protect the vital coastal economies and fragile ecosystems of British Columbia's coast,” Chief Councillor Marilyn Slett of the Heiltsuk Nation said Thursday about the decision to review the contract. At the time, the CITT recommended Public Services and Procurement Canada re-evaluate some of its mandatory requirements and that no further expenditure under the contact be undertaken. However, the tribunal also recommended that the contract remain with the winning bidder, Atlantic Services Limited/Atlantic Towing, until the evaluation can be completed. In August, the federal government announced the firm had been awarded a three-year contract worth $67 million for the lease of two emergency offshore towing vessels that would operate in the waters off the coast of British Columbia. The vessels were to be capable of towing large commercial ships in distress, such as tankers and container ships, before they get too close to shore, according to the federal government. As part of the contract, the firm, which is an Irving company, would also provide training in offshore emergency towing to Canadian Coast Guard personnel and partners, including Indigenous communities, involved in marine safety. But Heiltsuk Horizon challenged that award, pointing out that the contract was awarded without the required proof the vessels met the mandated towing power. The firm noted that the procurement process was flawed. In a letter to Heiltsuk Horizon, the CITT recommended Public Services and Procurement Canada reevaluate the “bollard pull” (towing power) of the vessels in all bids received. The CITT also awarded Heiltsuk Horizon costs incurred in submitting the complaint. Mary Keith, vice president of communications for Irving, issued a statement at the time from Atlantic Towing, pointing out that the tribunal did not declare the firm's bid non-compliant. “This is good news and reaffirms the integrity of the rigorous and transparent award process by PWGSC that also involved a third party fairness monitor,” the statement added. “The Tribunal has requested verification of one item and we are confident in our full compliance. The Bollard Pull on our vessels are verified and certified by one of the world's leading marine certification companies.” https://ottawacitizen.com/news/national/defence-watch/government-will-review-towing-vessel-contract-after-procurement-process-question

  • Minister Blair meets with Poland’s Deputy Prime Minister and Defence Minister Władysław Kosiniak-Kamysz

    December 18, 2023 | Local, Security

    Minister Blair meets with Poland’s Deputy Prime Minister and Defence Minister Władysław Kosiniak-Kamysz

    Minister Blair meets with Poland’s Deputy Prime Minister and Defence Minister Władysław Kosiniak-Kamysz

  • Trade tribunal rejects rival's bid to block warship contract

    February 4, 2019 | Local, Naval

    Trade tribunal rejects rival's bid to block warship contract

    Murray Brewster · CBC News The Canadian International Trade Tribunal has dismissed a complaint by one of the companies that was competing for the job of designing and helping to build the navy's next generation of warships. Alion Science and Technology Corp. and its subsidiary, Alion Canada, filed the complaint in November and asked that the signing of the contract with the preferred bidder be postponed until the matter could be heard. The trade tribunal, in a decision rendered late Thursday, said the company did not "have standing to file a complaint" before the agency. Last fall, the Liberal government announced plans to award the design contract to a group of companies led by Lockheed Martin Canada and opened negotiations with the intention of completing a full contract this winter. Alion, Lockheed Martin Canada and the Spanish company Navantia were all in the running for the Canadian Surface Combatant project, which will be built at Irving Shipbuilding in Halifax. The federal government issued a statement Friday and indicated progress towards a final contract was ongoing. "Public Services and Procurement Canada is pleased with the CITT's ruling," said department spokesman Pierre-Alain Bujold. "We have full confidence in our process, and continue to work toward awarding a contract for the design and design team for the future Canadian Surface Combatants." Alion had pitched its De Zeven Provinciën Air Defence and Command (LCF) frigate, a Dutch-designed warship, for the Canadian competition and has pointed out that the warship is already in service in other countries. The company had asked the CITT to investigate the procurement deal, saying the preferred warship design — the British-built Type 26 — would need substantial changes and and further claimed it doesn't meet the navy's requirements as outlined in the government tender. Alion also had filed a Federal Court challenge of the project last fall. The design competition went on for almost two years as Public Services officials and executives at Irving worked with bidders to ensure a fair competition and to avoid post-decision court fights. The first of the new warships, intended to replace the navy's frigates, are not expected to be in the water until the mid-2020s, at the earliest. https://www.cbc.ca/news/politics/trade-tribunal-warship-alion-1.5002298

All news