Back to news

October 16, 2018 | Local, Naval

Irving Shipbuilding pushing for two more Arctic/Offshore Patrol Ships, all Halifax-class work

DAVID PUGLIESE, OTTAWA CITIZEN

Efforts are underway by Irving Shipbuilding to convince the federal government to build two more Arctic and Offshore Patrol Ships at its Halifax yard. Irving also wants all Halifax-class frigate maintenance work to remain with the yard in Nova Scotia.

The federal government is looking at splitting up maintenance work on the Canadian navy's frigates between Irving and Davie in Quebec. It is facing objections from Irving and its workers. The Irving employees warn the change will mean lost jobs in Nova Scotia.

There are seven frigates that will need maintenance on the east coast over a five-year period. But military and Department of National Defence officials are concerned the Irving yard in Halifax won't be able to handle all the work as it will also be in the midst of building the new fleet of Canadian Surface Combatant warships. There are concerns that the navy's capabilities could suffer if the work isn't split up between Davie and Irving yards.

Each of the aging Halifax-class frigates will require about a year of maintenance work, and in 2020 the navy expects maintenance will be needed on two frigates at the same time.

Irving argues it needs all the Halifax-class work and the construction of two more AOPS so it doesn't face any downturn in activity at the yard. “ We are hopeful that the Government of Canada will continue the work at Halifax Shipyard,” Irving spokesman Sean Lewis said of the frigate maintenance.

Asked about the need for two more AOPS, Lewis stated the following: “We continue to work closely with the Government of Canada to explore the overall transition between the Arctic and Offshore Patrol Ship (AOPS) and Canadian Surface Combatant (CSC) programs. The construction of additional AOPS for Canada or international export opportunities is being considered and various options pursued. At this time it is premature to comment further.”

In response to Irving's push, Davie official Frédérik Boisvert has noted that while Irving has $ 65 billion in contracts from the federal government and 1900 workers, Davie has received less than $ 1billion in contracts and has less than 200 people working and 1400 laid off workers, waiting to be recalled. “If they (Irving) are concerned about Nova Scotian jobs, they should explain to their union workers why they are building their own tugs in Eastern Europe,” Boisvert added.

https://lfpress.com/news/national/defence-watch/irving-shipbuilding-pushing-for-two-more-arctic-offshore-patrol-ships-all-halifax-class-work/

On the same subject

  • MTU Maintenance Canada signs CF6-50 and accessory repair contract with Lockheed Martin

    April 20, 2018 | Local, Aerospace

    MTU Maintenance Canada signs CF6-50 and accessory repair contract with Lockheed Martin

    Vancouver, April 11, 2018 – MTU Maintenance Canada and Lockheed Martin have signed two contracts covering the maintenance, repair and overhaul of CF6-50C2 engines as well as accessory repair for the engines. MTU Maintenance Canada is the MTU Maintenance group's center of excellence for engine MRO in military applications in North America. “We are delighted to have signed these agreements with Lockheed Martin and hope this is the start of excellent, long-term cooperation,” said Michael Schreyögg, Chief Program Officer and Member of the Executive Board at MTU Aero Engines. “Our location in Vancouver has extensive experience and a great track record in supporting military programs.” Lockheed Martin's Commercial Engine Solutions operates from ist world-class facility in Montreal, which includes two test cells and the capacity to serve up to 25 engines per month. MTU Maintenance Canada employs a highly skilled team of around 400 employees located at Vancouver airport (YVR). A 130,000 square foot facility, complete with full test cell capacity, services military and commercial customers in V2500, CF6 and CFM56 engine programs. As a center of excellence for the MTU group, MTU Maintenance Canada also specializes in accessories repair, providing LRU management for a wide range of engine types, such as GE90. About MTU Aero Engines MTU Aero Engines AG is Germany's leading engine manufacturer, with core competencies in low-pressure turbines, high-pressure compressors, turbine center frames, manufacturing processes and repair techniques. MTU plays a key role in the new engine market through its partnership in many international development, manufacturing and sales programs, to which it contributes its high-tech components. One third of the global fleet of passenger airliners relies on components supplied by MTU. MTU is one of the world's top 5 providers of maintenance services for commercial aircraft engines and industrial gas turbines. These activities are combined under the roof of MTU Maintenance. In the military sector, MTU Aero Engines is the lead industrial partner for almost every type of engine flown by the German armed forces. MTU operates affiliates around the globe; its corporate headquarters are based in Munich, Germany. http://www.mtu.de/news-media/press/latest-press-releases/press-release-detail/mtu-maintenance-canada-signs-cf6-50-and-accessory-repair-contract-with-lockheed-martin/

  • Saudis would only hurt themselves by cancelling Light Armoured Vehicle contract

    August 10, 2018 | Local, Land

    Saudis would only hurt themselves by cancelling Light Armoured Vehicle contract

    DAVID PUGLIESE, OTTAWA CITIZEN Saudi Arabia is expecting a full apology from Canada for a tweet that raised questions about human rights issues in the Middle East country. It is unlikely that would be coming anytime soon. So the dispute between Saudi Arabia and Canada continues. In recent days, Riyadh suspended diplomatic ties with Canada, expelled the Canadian ambassador and recalled its own envoy to Ottawa after Foreign Affairs Minister Chrystia Freeland and her department criticized the regime on Twitter for its arrest of social activists, demanding their immediate release. Angered by the condemnation, Saudi Arabia has also tried to sting Canada's economy by halting future trade and investment deals and by cancelling lucrative scholarships that would have seen 15,000 of its citizens study in Canada. One media report said Saudi banks and pension funds were ordered to sell off their Canadian assets, although that report remains unconfirmed. Bloomberg News has reported that any move by Saudi Arabia to stop new investments and unload assets in Canada is likely to have limited impact. Saudi assets in Canada are confined mainly to stakes in upscale hotel operators, some small stock holdings in companies like Canadian National Railway and grain facilities, Bloomberg noted. What is interesting is what Saudi Arabia hasn't done. It is still willing to sell oil to Canada and has not put any roadblocks on that money-making venture. The Saudi Press Agency confirmed Thursday that the “diplomatic crisis” wouldn't affect the kingdom's petroleum sales to Canada. But that has also raised questions in Canada about why we are buying oil from Saudi Arabia when we have such large reserves ourselves? The big question is whether the Saudis will withdraw from its $15 billion deal to buy Light Armoured Vehicles from General Dynamics Land Systems of London, Ont.? It could happen but such a move would likely only hurt the Saudis. They need the vehicles and to negotiate a new contract with another arms supplier, plus get delivery of that equipment, could take years. Then there is the supply of parts and other support for the existing LAVs that the Saudis previously purchased from General Dynamics. Would shutting down all links to the LAV supply chain make sense for the Saudis? Finance Minister Bill Morneau said Thursday he was still unsure if the General Dynamics contract would be affected. Defence Watch submitted a series of questions to General Dynamics asking whether it would be halting production of LAVs destined for Saudi Arabia and would GD continue to provide spare parts for LAVs already delivered? “General Dynamics Land Systems-Canada declines to comment,” spokesman Doug Wilson-Hodge stated in an email. Full article: https://ottawacitizen.com/news/national/defence-watch/saudis-would-only-hurt-themselves-by-cancelling-light-armoured-vehicle-contract

  • Military college culture ‘must change significantly,’ defence minister says in report to Parliament

    December 13, 2022 | Local, Other Defence

    Military college culture ‘must change significantly,’ defence minister says in report to Parliament

    Anita Anand will appoint a committee to review the future of Canada’s military colleges following a scathing report published in May by former Supreme Court justice Louise Arbour.

All news