Back to news

August 27, 2020 | Local, Aerospace, Other Defence

Government awards design contract for future fighter infrastructure in Cold Lake

August 27, 2020 – Ottawa, Ontario – National Defence / Canadian Armed Forces

As outlined in Canada's defence policy, Strong, Secure, Engaged, the Government of Canada is providing Canadian Armed Forces (CAF) personnel with the facilities and tools to support their operations for the future.

Today, the Honourable Harjit S. Sajjan, Minister of National Defence, announced a $9.2-million contract award to EllisDon Construction Services Inc., of Edmonton, Alta., for the design of a new fighter jet facility at 4 Wing Cold Lake, one of two main operating bases for Canada's future fighter aircraft. A second facility and contract award is also planned for 3 Wing Bagotville. Combined, this infrastructure will support the long-term maintenance and operation of 88 new aircraft being procured for the Royal Canadian Air Force (RCAF) through the Future Fighter Capability Project (FFCP).

This contract is an important milestone in preparing Cold Lake for the future fighter, and it takes us one step closer to delivering the infrastructure our aviators need for the future. Both infrastructure projects will also provide significant economic opportunities for the Canadian construction industry, as well as the Cold Lake and Bagotville communities. In total, over 900 jobs are expected to be created during the design and construction of both facilities.

The Cold Lake facility will host two tactical fighter squadrons and will cover approximately
19,300 m2, providing space for daily operations, maintenance, administration, mission planning, and simulator training. It will also house operational and support training squadrons and their training facilities.

Quotes

“We invest in this modern infrastructure to house our future fighter aircraft because we know it is critical to ensuring the safety and security of Canadians, as well as meeting Canada's international obligations to NORAD and NATO. A modern fighter jet fleet is essential for the defence of our country and its sovereignty, and these facilities are vital to enabling these operations.”

The Honourable Harjit S. Sajjan, Minister of National Defence

“This infrastructure project is a significant investment in the future of the Canadian Armed Forces and the Cold Lake community. Building this facility will help sustain jobs near the base, and will ensure our military is well equipped for the future.”

Anita Vandenbeld, Parliamentary Secretary to the Minister of National Defence

Quick facts

  • We expect to award the design contract for our future fighter facility in Bagotville in September 2020. Construction is estimated to begin at both bases in summer 2022.

  • Both design contracts will also include options for the contractors to build the new facilities, and any additional infrastructure once the future fighter is selected, should Canada decide to exercise these follow-on options.

  • By awarding these infrastructure design contracts ahead of choosing a future fighter, we will start on work that is needed, regardless of which of the three potential aircraft is selected. This will ensure both bases are ready for the first aircraft deliveries.

  • These facilities will be designed and constructed to Leadership in Energy and Environmental Design Silver standards and will use energy efficient options wherever possible.

Associated links

Contacts

Floriane Bonneville
Press Secretary
Office of the Minister of National Defence
Phone: 613-996-3100

Media Relations
Department of National Defence
Phone: 613-904-3333
Email: mlo-blm@forces.gc.ca

https://www.canada.ca/en/department-national-defence/news/2020/08/government-awards-design-contract-for-future-fighter-infrastructure-in-cold-lake.html

On the same subject

  • La France espère pénétrer le marché canadien de l’aéronautique et de la défense

    March 4, 2020 | Local, Aerospace, Naval, Land, C4ISR, Security

    La France espère pénétrer le marché canadien de l’aéronautique et de la défense

    « En ce moment tout le monde regarde [...] le passage du CSeries à l'A220 chez Airbus », a déclaré, le 2 mars, le président du GIFAS, Éric Trappier, lors d'un point de presse en marge d'un événement réunissant 250 représentants du secteur des deux pays, France et Canada, qui se tenait à Montréal, dans le cadre de la mission industrielle du GIFAS au Canada. « C'est un métier difficile [où il faut savoir concilier les facteurs] techniques, commerciaux et financiers, a-t-il poursuivi. Ce n'est pas tout d'avoir des succès techniques. Il faut aussi pouvoir les financer. Et pour les financer, il faut pouvoir les vendre. » La mission du GIFAS espère notamment convaincre le gouvernement fédéral de ne pas toujours seulement regarder du côté des États-Unis lorsque vient le temps de faire ses dépenses militaires.

  • CAE awarded contract by GA-ASI to develop synthetic training system

    January 28, 2019 | Local, Aerospace

    CAE awarded contract by GA-ASI to develop synthetic training system

    CAE announced on Jan. 24 that the company has been awarded a contract from General Atomics Aeronautical Systems, Inc. (GA-ASI) to develop a comprehensive synthetic training system for the United Kingdom's Protector RG Mk1 remotely piloted aircraft system (RPAS) program. The Protector will be operated by the Royal Air Force and is the U.K.-specific variant of GA-ASI's certifiable MQ-9B SkyGuardian RPAS, which can meet the most stringent certification requirements of aviation authorities. Under terms of the contract, CAE will design and develop a comprehensive synthetic training system that will include desktop and high-fidelity mission trainers specific to the Protector RPAS. The high-fidelity Protector mission trainers will be based on GA-ASI's certifiable ground control station (CGCS) and will be the first simulators developed for this advanced CGCS. CAE will also provide brief/debrief and scenario generation stations as part of the overall synthetic training system. “We are pleased to continue our global training partnership with GA-ASI to support the U.K. Protector program,” said Gene Colabatistto, CAE's group president, defence and security. “Protector will offer a new level of capability in an unmanned air system and will require well-trained aircrews. We will leverage developments we have made over the past several years creating the highest fidelity training devices for the Predator family of remotely piloted aircraft to produce a world-class synthetic training system for the Protector program.” Initial deliveries of the synthetic training system will be targeted for delivery in 2020 to RAF Waddington, the hub of U.K. Intelligence, Surveillance, Target Acquisition and Reconnaissance (ISTAR) that will be the main operating base for the Protector. “MQ-9B SkyGuardian, which Protector is based on, represents the next-generation of remotely piloted aircraft capabilities, including longer endurance and automatic take-off and landing,” said David R. Alexander, president, aircraft systems, GA-ASI. “The Protector synthetic training system will play a key role helping the Royal Air Force develop skilled aircrews, and we are pleased to collaborate with CAE as our training partner on this critical program.” https://www.skiesmag.com/press-releases/cae-awarded-contract-by-ga-asi-to-develop-synthetic-training-system

  • Thales Canada invests in Virtual Marine’s ship simulation system

    October 9, 2018 | Local, Naval

    Thales Canada invests in Virtual Marine’s ship simulation system

    Thales has invested in Canada-based Virtual Marine's embedded ship simulation system as part of a new multi-phase research and development project. With an investment of more than $315,000, the project will involve development of a ship simulator for use across a range of platforms and projects in both naval, coastguard and commercial applications. Primarily it will support advanced platform testing and integration requirements for the Royal Canadian Navy programmes such as Arctic and Offshore Patrol Ships and Joint Support Ships In-Service Support (AJISS). Virtual Marine chief technical officer and executive vice-president Randy Billiard said: “The Ship Simulator Research project will result in a more innovative and technologically advanced ship simulator software product that will build on existing simulation technologies to enhance integration support and training options for prime defence integrators. “It will be tested by users who understand the need to properly de-risk systems for safe and full operational integration. This project will further position Virtual Marine as a leading and innovative provider of marine simulation solutions.” The research project will leverage Thales's extensive software engineering expertise and capabilities in big data, connectivity, artificial intelligence and cybersecurity to upgrade baseline technology. The 12-month project will help provide the company with improved embedded navigation simulation capabilities support. In August last year, Thales received a C$800m AJISS contract from the Government of Canada to provide in-service support, refit, repair, maintenance and training to the Canadian Navy's Arctic and Offshore Patrol Ships (AOPS) and Joint Support Ships (JSS). https://www.naval-technology.com/news/thales-invests-ship-simulation-system/

All news