Filtrer les résultats :

Tous les secteurs

Toutes les catégories

    12016 nouvelles

    Vous pouvez affiner les résultats en utilisant les filtres ci-dessus.

  • £26.7 million engine support contract for Oxfordshire company

    19 juin 2020 | International, Naval

    £26.7 million engine support contract for Oxfordshire company

    June 17, 2020 - Oxfordshire-based EP Barrus secured the seven-year contract for the upkeep, update and supply of engines fitted to more than 1,100 craft. The contract covers boats within the current MOD in-service fleet for craft under 25m, including Rigid Inflatable Boats (RIBs), the Mexeflote landing-raft system powered by the Thrustmaster propulsion unit, workboats, and planned future craft. Defence Minister Jeremy Quin said: Our maritime industry continues to grow from strength to strength. This contract will secure an essential capability for our Armed Forces and support over 40 quality engineering jobs in Bicester plus many more throughout the UK. The contract will support operations in the UK and overseas involving the Royal Navy, Royal Marines, British Army, Ministry of Defence Police, and Cadets. The contract will directly support 40 jobs within Barrus's Engineering Centre, as well as a further 80 jobs across the UK supply chain that will benefit from the contract. In addition, this contract secures EP Barrus's graduate programme in Oxfordshire and the future roles for its young engineering students. James Melia, Project Manager for DE&S Boats Team, said: Boats are an essential capability of the UK Armed Forces and are used for many different operations around the world ensuring that our Navy has the reach it needs to protect our interests around the globe. We are committed to ensuring that engines are effectively managed through every stage of their life cycle and our partnership with EP Barrus will provide critical support to this. DE&S is proud to maintain excellent working relationships with EP Barrus, a valued industry supplier and we look forward to continuing to work together to support our front line with the equipment they need while also maintaining vital British skills and jobs. Photo Crown copyright View source version on UK Ministry of Defence: https://www.gov.uk/government/news/267-million-engine-support-contract-for-oxfordshire-company

  • Future Combat Air System: Owning the sky with the Next Generation Weapons System

    19 juin 2020 | International, Aérospatial

    Future Combat Air System: Owning the sky with the Next Generation Weapons System

    June 17, 2020 - When facing today's uncertainties, air superiority, which was underpinning western military operations for over 40 years, is no longer a given thing. The playing field is levelled by opponents' constant investment in integrated air defence systems, hypersonic weapon technologies and low observability technologies. Western air forces need to regain their ability to counter threats by accessing highly contested environments in a scalable, flexible and dynamic way rather than a local and static one. By intelligently teaming sixth generation manned fighters with unmanned platforms, the Next Generation Weapon System or NGWS will provide European air forces & navies with capabilities well beyond existing fighters. With no agreed definition of a sixth-generation fighter, Airbus' understanding is that such a New Generation Fighter or NGF will be a more sophisticated and connected platform than what currently exists. The NGF will set the next level of survivability in terms of passive stealth (signature reduction and electromagnetic emission control) and active stealth (electronic counter measures). The heart of the NGF will be provided by its extremely capable avionics and sensor suite. The increase in processing power, storage and connectivity will grant the pilot with greatly heightened situational awareness and the ability to rely not only on its own sensors and effectors, but also on other platforms' ones. Combined with the introduction of artificial intelligence and the ability to team with unmanned platforms, the NGF will become a battlefield management platform capable of operating deep within the enemy airspace. Powerful engines equipped with thrust-vectoring nozzles combined with high-performance flight control system will ensure the NGF's manoeuvrability, speed, and range. Innovative effectors will provide the fighter with unprecedented firepower, ranging from stand-off kinetic loads (including hypersonic ones) to directed energy weapons (lasers and microwaves) to electronic warfare capabilities (including cyberattack). However, more sophistication also means higher development costs leading to a declining number of platforms and/or effectors. Eventually such dangerously low levels result in critical availability levels. This is problematic, as operational studies indicate that penetrating contested environments will require an adequate number of manned platforms. Hence, it is important to set the right level of capabilities for the NGF by taking a holistic approach when right sizing its stealth, velocity, manoeuvrability, range, sensing and effects generation's capabilities. The NGF alone will not suffice for the most demanding missions in highly contested environments. To counter such threats, the NGF will team with unmanned platforms called Remote Carriers or RCs acting as force multipliers. Adding capabilities in a scalable and flexible manner will enhance the overall mission effectiveness, efficiency and survivability of the NGWS. RCs will be a family of unmanned platforms ranging from 200 kilograms for disposable RCs, to under 2 tons for recoverable ones and even several tons in the case of loyal wingmen. Airbus is currently studying and optimising with users their design. The RCs will provide various non-kinetic effects (Target Acquisition and Reconnaissance, Airborne Electronic Warfare) as well as kinetic ones (A2G SEAD/DEAD and Strike). With “packs” of RCs teaming with NGFs, the NGWS will clearly establish a new operational dimension. An augmented level of effectiveness will be achieved by opening new fields of tactics based on collaborative combat, the use of deception and numeric superiority. Efficiency will improve by ensuring the required mix of capabilities for a given mission is deployed. The NGF will stay at a safe stand-off distance whilst closer RCs deal with the threats, thus keeping the pilots out of harm's way and increasing the manned platform's survivability. Within the NGWS, the Air Combat Cloud or ACC will connect the manned and unmanned platform and provide the teaming intelligence for faster collaborative combat. The ACC will deliver common situational awareness by instantaneously capturing, sharing, merging and processing massive amounts of data from all connected NGFs and RCs. The ACC's warfare analytics and real-time coordination will provide better situational awareness, tactical options, decisions and collaborative effects Airbus has a leading role within the Next Generation Weapon System programme programme which will be the core of FCAS. Airbus is Dassault's main partner for the NGF and the lead for the RCs and the ACC with MBDA and Thales as its respective main partners. This will benefit Airbus' sites in securing work and maintaining technological excellence for decades to come. More on FCAS here View source version on Airbus: https://www.airbus.com/newsroom/stories/Future-Combat-Air-System-Owning-the-sky-with-the-Next-Generation-Weapons-System.html

  • Why Canada’s Failure to Win U.N. Security Council Seat Is a Huge Loss for Justin Trudeau

    19 juin 2020 | Local, Aérospatial, Naval, Terrestre, C4ISR, Sécurité

    Why Canada’s Failure to Win U.N. Security Council Seat Is a Huge Loss for Justin Trudeau

    BY KAIT BOLONGARO / BLOOMBERG JUNE 17, 2020 11:42 PM EDT Prime Minister Justin Trudeau and his top diplomat sought to put a brave face on their failure to secure a spot on the United Nations Security Council in one of the Canadian leader's biggest defeats yet on the world stage. Trudeau waged a four-year campaign for a council seat in what he hoped would represent a vindication of his foreign policy — a staunch defense of pluralism and multilateralism at a time of global upheaval. But his brand of progressive politics sometimes fell flat and he's been criticized as being preachy on liberal values. “We listened and learned from other countries, which opened new doors for cooperation to address global challenges, and we created new partnerships that increased Canada's place in the world,” Trudeau said in a statement Wednesday after the vote. Foreign Affairs Minister Francois-Philippe Champagne said at a press conference the country's campaign allowed Canada to renew and strengthen bilateral connections across the world. The latest setback is just one of many recent struggles for Trudeau globally, including a deterioration of relations with China and Saudi Arabia and a disastrous state visit to India. Not Back But none, perhaps, are as big a personal setback for the prime minister as Wednesday's defeat. The government had seen a return to the security council as a fulfillment of the Canadian leader's promise — the day after he took power in 2015 — to bring the country “back” on the world stage. “Many of you have worried that Canada has lost its compassionate and constructive voice in the world over the past 10 years,” Trudeau said at the time. “Well, I have a simple message for you: on behalf of 35 million Canadians, we're back.” Canada received the support of 108 countries of a total 192 that voted Wednesday afternoon at UN Headquarters in New York. Norway and Ireland, Canada's two rivals, received 130 and 128 votes, passing the required two-thirds majority of 128 ballots. “It's really the biggest embarrassment he will suffer in his prime minister-ship in Canada, particularly on international affairs,” said Shuvaloy Majumdar, a senior fellow at the MacDonald Laurier Institute and former adviser on foreign policy in Prime Minister Stephen Harper's conservative government. Canada has now been overlooked for the second time in the past decade to become a non-permanent member on the agency's decision-making body. https://time.com/5855483/canada-un-security-council-seat/

  • Major upgrades incoming for Canada’s fleet of CF-188 Hornets

    19 juin 2020 | Local, Aérospatial

    Major upgrades incoming for Canada’s fleet of CF-188 Hornets

    You can pick your own term. Generation 4.2? Gen 4.3? However you choose to define the upgraded Royal Canadian Air Force (RCAF) CF-188 Hornet, the fighter jet will have “operational parity” in a complex operating environment until the early 2030s. “It's not Gen 4, but it's not a true Gen 4.5 like the (F/A-18E/F) Super Hornet. It will be somewhere between there,” said BGen Todd Balfe, a CF-188 pilot and special advisor to the Fighter Capability Office. “The term we use is, it brings us to operational parity against current threats. That is an implicit statement recognizing we don't have operational parity right now. And that supports our [objective] of bridging towards the future fighter.” Under a program known as the Hornet Extension Project (HEP), the Air Force will upgrade its entire fleet of 94 aircraft to meet international aviation regulations and ensure interoperability with the United States and other allies, including NATO. It will also enhance the combat capability of 36 jets to operate globally against current threats. The program addresses what the RCAF is calling quantitative and qualitative capability gaps. The delivery and upgrade of 18 operational Australian F/A-18A Hornets, which will expand the current fleet of 76 to 94, gives the Air Force the necessary quantity to meet concurrent NORAD and NATO obligations. Upgrading the sensors, weapons, countermeasures and mission support of approximately two squadrons worth of fighters will resolve the qualitative concern. Previously two distinct projects to comply with changing civil aviation regulations and allied capabilities and to modernize combat capability, HEP will be completed in two phases. The first phase, set to begin shortly on all 94 Hornets, will include automatic dependent surveillance-broadcast (ADS-B) to replace the current transponder, Honeywell GPS/INS systems, Collins Aerospace AN/ARC-210 RT-2036 (Gen 6) radios, airborne Joint Tactical Radios, upgrades to the Lockheed Martin sniper targeting pod, enhanced mission computers and data transfer units, and software updates for the Advanced Distributed Combat Training System (ADCTS) for networked flight simulation exercises. “It will allow the aircraft to operate in civil airspace out to 2032, but more importantly ... to interoperate with allies,” said Balfe. “Our NATO allies and our U.S. allies are upgrading the interoperability standards on all their fleets of aircraft.” The second phase, to be completed on the 36 Hornets with the most remaining operational life, will follow shortly after. Though select weapons and sensor systems were upgraded prior to Operation Impact over Iraq and Syria in 2014 and 2015, the CF-188 has not had a major overhaul of its combat capability for almost 15 years, Balfe acknowledged. The most significant enhancement will be to the sensing capability, in particular the radar. The Air Force will replace the AN/APG-73 mechanically scanned radar, a multimode airborne radar system developed in the 1980s by Hughes Aircraft, now Raytheon, with a vastly improved APG-79(V)4 Active Electronically Scanned Array (AESA) radar, now standard on so-called fifth generation fighters and many allied upgraded fourth generation aircraft. “An AESA radar gives you much greater detection, less probability of being detected, and more capability to track and identify airborne and even surface targets,” said Balfe. “It is a scaled down version of the radar that is in the Super Hornet.” The Fighter Capability Office looked across allied F-18 operators for examples and “quickly landed upon the U.S. Marine Corps,” which operates a C variant of the Hornet, he said. “They have embarked upon a very similar upgrade path ... so much of the engineering effort has already been done. We will partner with the Marine Corps and put that in our aircraft.” The Hornets will also receive a new F/A-18A Wide Band RADOME to “be able to accommodate the full capability of the AESA radar,” he added. The new weapons package will include the Sidewinder AIM-9X Block II air-to-air short-range missile, the AIM-120D advanced medium range air-to-air missile, and the AGM-154 Joint Standoff Weapon (JSOW), an air-to-surface glide bomb with an unclassified published range of at least 100 kilometres “All the weapons are currently integrated on Marine Corps F-18s” and are used by select NATO allies, noted Balfe. “They are a significant increase in capability and survivability for our pilots.” Given the age of the Hornets, which were designed in the 1970s and produced in the 1980s, there would be limited value in modifying the airframe or enhancing the electronic warfare system to further increase survivability — the RCAF is anticipating about seven years of service life once the upgrades are completed in 2025. But the Air Force will add new expendable chaff and flare, the ADM-141C Improved Tactical Air-Launched Decoys, and an Automatic Ground Collision Avoidance System (Auto GCAS). “The system was not technically feasible before,” said Balfe. “It is now. The Marine Corps has found a solution.” Lastly, the RCAF will expand mission support and security with a new Joint Mission Planning System (JMPS) and security upgrades to portable, temporary secure facilities to conduct simulated weapons training and mission planning for pilots. “These new weapons come with a higher level of security,” he said, noting that the CF-188 operates at secret or below while newer fighters require top secret level classification. Though the enhanced combat capability might not match that of a true Gen 4.5 or greater aircraft, it will serve as a “transition activity” to the future fighter, which remains “on track,” said MGen Michel Lalumiere, chief of Fighter Capability. The government still expects to award a contract in 2022 for 88 advanced fighter jets to replace the current Hornet fleet, despite twice adjusting the request for proposals deadline, now set for July 31, and the challenges of coordinating paperwork and other activity among the Fighter Capability Office, the Air Force, other government departments and the three contending companies while working remotely during the coronavirus pandemic. Balfe suggested the combat systems introduced during HEP Phase 2, many of the which will be the same or similar on the future fighter, “will enable us to begin the transition of our people, our mindset, our procedures and our way of thinking for the capabilities that are going to come with the future fighter. We think HEP is a great bridge toward that path.” While data from the various sensors will still be “fused” by the pilot rather than an onboard computer, systems in CF-188, the enhanced sensing and data transfer will mean a clearer operating picture among RCAF pilots that can be shared to a degree with allies. “It will bring our pilots into a different level,” he said. One key approval milestone was reached on June 16 when the U.S. State Department approved the possible military sale to Canada of the AESA radar along with technical and logistics support, the RADOME, radios, data transfer units, the various missiles and tactical guidance units, the ADCTS, Auto GCAS, JMPS and other systems for an estimated US$862.3 million, according to the Defense Security Cooperation Agency. The combined HEP program is estimated to cost about $1.3 billion. The Air Force is anticipating an initial operating capability of six Hornets through both Phase 1 and 2 in 2023. Full operational capability of the entire 94 aircraft is expected in 2025. “We are doing this very rapidly,” noted Balfe. That timeline includes the introduction of 18 Australian flyable aircraft as well as delivery of a spares package and up to seven more F/A-18A jets for parts by 2022. So far, five have been delivered and two have completed testing and evaluation after undergoing a conversion program that includes Canadian operational flight program software, cockpit configuration, a naval aircrew common ejection seat, night vision imaging systems, external lighting on the tail, changes to the landing gear and installation of the Lockheed Martin sniper targeting pod. “The allocation (of the Australian aircraft) will be based upon squadron needs and aircraft fatigue,' said Balfe. “One of the benefits besides helping close that quantitative capability gap, they give us a bigger pool of aircraft over which to distribute the stress and strain of [fighter operations]. They also allow us to have aircraft out of service while they are going through various phases of upgrades under HEP.” Enhanced combat systems may put the CF-188 on a par with current threats for the next decade, but they don't negate the need for a more modern fighter, Balfe observed. “We have a limited window where the upgraded CF-188 will have operational parity. Past that window, roughly 2032, it will most likely not have operational parity any longer.” https://www.skiesmag.com/news/major-upgrades-canada-fleet-cf-188-hornets

  • Sweden to Propose Development of a New Fighter Aircraft

    19 juin 2020 | International, Aérospatial

    Sweden to Propose Development of a New Fighter Aircraft

    The Swedish government on Tuesday revealed its plans to improve its military capabilities including development of a new fighter jet to replace the JAS 39 Grippen. “The development of the next generation fighter aircraft will commence,” Swedish Carl Anders Peter Hultqvist said in a statement June 16, without divulging any more details. Swedish Air Force JAS 39/D combat aircraft will be maintained, as the new fighter JAS 39 E is integrated into the squadrons and becomes operational. This will allow the service to keep six fighter squadrons. The Army will be reorganized and consist of three mechanized brigades, one smaller motorized brigade and, on the island of Gotland, one mechanized battalion with support elements. Additional ranger, intelligence, security, artillery, engineer, logistics and air defence units will be added. When it comes to the Navy the existing corvettes will be upgraded with new air-defence missiles. Two new corvettes will be acquired in order to replace two older ones after 2025. One existing submarine will get a mid-life upgrade and therefore the number of submarines will increase from four to five. A new amphibious battalion will be established on the west coast of Sweden. In 2020, the government will also establish a national cyber security centre. This centre will strengthen Sweden's ability to prevent, detect and handle antagonistic cyber threats and reduce cyber related vulnerabilities. It will also provide support to private and public actors on how to improve their cyber security and protection against cyber attacks. In July 2019, Governments of Sweden and the United Kingdom (UK) signed a Memorandum of Understanding (MoU) to develop future combat aircraft capabilities and combat aircraft systems. The collaboration offers the opportunity to further insert advanced technologies into JAS 39 Gripen. https://www.defenseworld.net/news/27229#.Xuz9ymhKiUk

  • India’s defense industry is set to lose $3 billion from nationwide lockdown

    18 juin 2020 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité

    India’s defense industry is set to lose $3 billion from nationwide lockdown

    By: Vivek Raghuvanshi NEW DELHI — Indian defense companies may have lost $3 billion in potential revenue during March 24-May 31 amid a nationwide lockdown in response to the coronavirus pandemic, according to a Ministry of Defence official. Those affected include more than 100 large defense firms and some 4,000 small and medium aerospace and defense businesses. The lockdown has also impacted the supply of local and foreign material for 50 major defense projects. Currently, every Indian-made weapon and platform is designed to use 10-20 percent of imported components. The COVID-19 pandemic is expected to disrupt the supply of such components for at least a year, which could cause delays and cost overruns for major defense programs, according to a senior executive with the Society of Indian Defence Manufacturers, a defense industry advocacy body. Speaking on condition of anonymity, he said local defense industry factories are operating at 30-50 percent capacity and that the outlook is grim. “This will lead to a direct hit in the first-quarter revenue of all defense companies operating in India, which will also seemingly struggle for cash flows for operation costs,” he said, adding that those costs could increase in the second quarter of the current fiscal year. Another MoD official told Defense News that some of the ongoing major defense projects — such as licence production of French Scorpene submarines, Project 17A destroyers, Indo-Russian BrahMos cruise missiles and license production of Russian T-90MS main battle tanks — will take a major hit because foreign engineers are unwilling to come to India to supervise the projects. Due to disruption in the supply chain, the SIDM exec warned, the cost of material and components will increase sharply — possibly an extra 10-15 percent — and Indian defense companies will have to spend more if fluctuations in the exchange rate between the Indian rupee and the euro or U.S. dollar harms India's purchasing power. https://www.defensenews.com/industry/2020/06/17/indias-defense-industry-is-set-to-lose-3-billion-from-nationwide-lockdown/

  • Contract Awards by US Department of Defense - June 17, 2020

    18 juin 2020 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité

    Contract Awards by US Department of Defense - June 17, 2020

    AIR FORCE Accenture Federal Services LLC, Arlington, Virginia (FA7014-20-D-0006); Booz Allen Hamilton Inc., Arlington, Virginia (FA7014-20-D-0007); Deloitte Consulting LLP, Arlington, Virginia (FA7014-20-D-0008); Digital Mobilizations Inc., Warrenton, Virginia (FA7014-20-D-0010); KMPG LLP, McLean, Virginia (FA7014-20-D-0009); BCG Federal Corp., Bethesda, Maryland (FA7014-20-D-0005); Grant Thornton Public Sector LLC, Arlington, Virginia (FA7014-20-D-0004); and McKinsey & Co. Inc., Washington, D.C. (FA7014-20-D-0003), has been awarded a ceiling $990,000,000 multiple-award, indefinite-delivery/indefinite-quantity, firm-fixed-price contract to provide advisory and assistance services to support the Deputy Assistant Secretary of the Air Force Office of Business Transformation and Deputy Chief Management Officer in managing and improving strategic transformation initiatives at the enterprise level. Work will be performed at various locations and is expected to be completed June 16, 2027. This award is the result of a competitive acquisition and seven offers were received. Fiscal 2020 operations and maintenance funds in the amount of $500 for each contract are being obligated at the time of award. Air Force District of Washington, Joint Base Andrews, Maryland, is the contracting activity. NORTHCON Inc., Hayden, Indiana (FA4814-20-D-0005); Pro-Mark Services Inc., West Fargo, North Dakota (FA4814-20-D-0006); Danner Construction Co. Inc., Tampa, Florida (FA4814-20-D-0007); ABBA Construction Inc., Jacksonville, Florida (FA4814-20-D-0008); Bay Area Building Solutions, Tampa, Florida (FA4814-20-D-0009); HCR Construction Inc., Norcross, Georgia (FA4814-20-D-0010); OAC Action Construction Corp., Miami, Florida (FA4814-20-D-0011); Frazier Engineering, Melbourne, Florida (FA4814-20-D-0012); Benaka Inc., New Brunswick, New Jersey (FA4814-20-D-0013); RELYANT Global LLC, Maryville, Tennessee (FA4814-20-D-0014); Polu Kai Services LLC, Falls Church, Virginia (FA4814-20-D-0015); Nisou LGC JV LLC, Detroit, Michigan (FA4814-20-D-0016); KMK Construction Inc., Jacksonville, Florida (FA4814-20-D-0017); Burgos Group LLC, Medford, New Jersey (FA4814-20-D-0018); A&H-Ambica JV LLC, Livonia, Michigan (FA4814-20-D-0019); P&S Construction Inc., Chelmsfor, Massachusetts (FA4814-20-D-0020); Northstar Contracting Inc., Cleveland, Ohio (FA4814-20-D-0021); ESA South Inc., Cantonment, Florida (FA4814-D-20-0022); and RUSH Construction Inc., Titusville, Florida (FA4814-D-20-0023), have been awarded a $500,000,000 indefinite-delivery/indefinite-quantity contract for execution of a broad range of maintenance, repair and minor construction projects affecting real property at MacDill Air Force Base, Florida; and Avon Park Air Force Range, Florida. Work is expected to be completed June 16, 2027. Fiscal 2020 operations and maintenance funds in the amount of $9,500 will be obligated at the time of award. The 6th Contracting Squadron, Tampa, Florida, is the contracting activity. Northrop Grumman Systems Corp., Linthicum Heights, Maryland, has been awarded an $18,733,197 firm-fixed-price, cost-plus-fixed-fee modification (P00026) to contract FA8615-17-C-6047 for active electronically scanned array radars of Air Force F-16 aircraft. The contract modification is for definitization of the radio frequency target generator, additional support equipment and software development to support Phase Two. Work will be performed in Linthicum Heights, Maryland, and is expected to be completed by April 2023. Fiscal 2018 aircraft procurement funds in the amount of $3,510,172; and fiscal 2020 research, development, test and evaluation funds in the amount of $10,103,436 are being obligated at the time of award. Total cumulative face value of the contract is $1,027,044,025. Air Force Life Cycle Management Center, Wright-Patterson Air Force Base, Ohio, is the contracting activity. NAVY Huntington Ingalls Industries, Pascagoula, Mississippi, is awarded $145,598,728 for a not-to-exceed, undefinitized contract action for long lead time material in support of one Amphibious Assault Ship (General Purpose) Replacement (LHA(R)) and Flight 1 Ship (LHA 9). Work will be performed in Milwaukee, Wisconsin (42%); Baltimore, Maryland (24%); Pascagoula, Mississippi (17%); Cranberry Township, Pennsylvania (10%); Fairfield, Ohio (6%); and Warminster, Pennsylvania (1%). Work to be performed is the procurement of long lead-time material for LHA 9, the fourth (LHA(R)) America Class and the second LHA(R) Flight 1 variant. Work is expected to be complete by February 2024. Fiscal 2019 shipbuilding and conversion (Navy) advance procurement funding in the amount of $145,598,728 will be obligated at award and will not expire at the end of the current fiscal year. In accordance with 10 U.S. Code 2304(c)(1), this contract was not competitively procured with only one responsible source. No other supplies or services will satisfy agency requirements. The Naval Sea Systems Command, Washington, D.C., is the contracting activity (N00024-20-C-2437). Barnhart-Reese Construction Inc.,* San Diego, California (N62473-17-D-4635); Bristol Design Build Services LLC,* Anchorage, Alaska (N62473-17-D-4636); I.E.-Pacific Inc.,* Escondido, California (N62473-17-D-4637); and R.A. Burch Construction Co. Inc.,* Ramona, California (N62473-17-D-4638), are awarded $92,000,000 to increase the aggregate capacity of the previously awarded suite of firm-fixed-price, indefinite-delivery/indefinite-quantity, multiple award construction contracts. The maximum dollar value, including the base year and four option years for all four contracts combined, has increased from $99,000,000 to $191,000,000. The contracts are for new construction, renovation and repair, primarily by design-build or secondarily by design-bid-build, of general building construction at various federal sites and government installation locations within the Naval Facilities Engineering Command (NAVFAC) Southwest area of operations. Work will be performed in various locations, including but not limited to, California (90%); Arizona (6%); Nevada (1%); Utah (1%); Colorado (1%); and New Mexico (1%). No funds are being obligated on this award, and no funds will expire. Future task orders will be primarily funded by military construction (Navy); operations and maintenance (O&M), Navy; O&M, Marine Corps; and Navy working capital funds. The original contract was competitively procured via the Navy Electronic Commerce Online website. The NAVFAC Southwest, San Diego, California, is the contracting activity. L3 Technologies Inc. KEO, Northampton, Massachusetts, is awarded a $17,275,863 firm-fixed-price modification to previously awarded contract N00024-15-C-6250 for options to procure spare parts for the photonics mast program. Work will be performed in Northampton, Massachusetts, and is expected to be complete by February 2022. Fiscal 2020 other procurement (Navy) funding in the amount of $2,831,502 will be obligated at time of award. Funds will not expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, D.C., is the contracting activity. Epsilon Systems Solutions Inc.,* San Diego, California, is awarded a $17,175,335 cost-plus-fixed-fee contract for Southwest Regional Maintenance Center (SWRMC) support services. Work will be performed in San Diego, California. The SWRMC production department Code 900 is responsible for providing intermediate-level (I-Level) maintenance and repair support and selective maintenance training to over 100 surface ships, submarines, shore activities and other commands of the U.S. Pacific Fleet. SWRMC Production Department is broken into four product families, and each contains multiple product lines and shops. The SWRMC production department product families currently consist of corrosion control products, engine products, machine products and combat systems product family. Within the SWRMC production department, there are also production control division, I-Level planning division and an off-site facility. Work is expected to be complete by September 2021. This contract includes options which, if exercised, would bring the cumulative value of this contract to $106,240,249. Fiscal 2020 operations and maintenance (Navy) funding in the amount of $1,431,278 will be obligated at the time of award, and will expire at the end of the current fiscal year. This contract was competitively procured via the Federal Business Opportunities website, and four offers were received. The Southwest Regional Maintenance Center, San Diego, California, is the contracting activity (N55236-20-C-0003). Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded a $16,026,098 modification (P00001) to cost-plus-fixed-fee order N00019-20-F-0817 against previously issued basic ordering agreement N00019-19-G-0008. This order procures support to manage diminishing manufacturing sources in support of the F-35 Program for the Air Force, Navy and non-Department of Defense (DOD) participants. Work will be performed in Fort Worth, Texas, and is expected to be complete by June 2021. Fiscal 2018 aircraft procurement (Air Force) funds in the amount of $6,586,406; fiscal 2020 aircraft procurement (Navy) funds in the amount of $6,586,406; and non-DOD participant funds in the amount of $2,853,286 will be obligated at time of award, of which $6,586,406 will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. Phillips Corp., Hanover, Maryland, is awarded a $12,790,000 fixed-price, indefinite-delivery/indefinite-quantity contract. This contract procures equipment related services necessary for the inspection, evaluation, repair, upgrade, training and rebuild for the sustainment of industrial plant equipment that is required to adequately support overhauling and repairing fleet aircraft, engines and components in support of the Commander Fleet Readiness Centers. Work will be performed in North Island, California (50%); Cherry Point, North Carolina (35%); and Jacksonville, Florida (15%), and is expected to be complete by June 2023. No funds will be obligated at the time of award. Funds will be obligated on individual orders as they are issued. This contract was not competitively procured, pursuant to Federal Acquisition Regulation 6.302-1. The Naval Air Warfare Center Aircraft Division, Lakehurst, New Jersey, is the contracting activity (N68335-20-D-0017). DEFENSE LOGISTICS AGENCY Federal Prison Industries Inc., Washington, D.C., has been awarded a maximum $17,548,000 modification (P00007) exercising the first one-year option period of one-year base contract SPE1C1-19-D-F027 with four one-year option periods for coveralls. This is a firm-fixed-price, indefinite-delivery/indefinite-quantity contract. Locations of performance are Georgia, Arizona, Washington, D.C., and Mississippi, with a June 20, 2021, ordering period end date. Using military service is Navy. Type of appropriation is fiscal 2020 through 2021 defense working capital funds. The contracting activity is the Defense Logistics Agency Troop Support, Philadelphia, Pennsylvania. The Entwistle Co., Hudson, Massachusetts, has been awarded a maximum $8,135,400 firm-fixed-price contract for air launch and recovery equipment shuttle assemblies. This was a sole-source acquisition using justification 10 U.S. Code 2304 (c)(1), as stated in Federal Acquisition Regulation 6.302-1. This is a 42-month contract with no option periods. Location of performance is Massachusetts, with a Dec. 31, 2023, performance completion date. Using military service is Navy. Type of appropriation is fiscal 2020 Navy working capital funds. The contracting activity is the Defense Logistics Agency Aviation, Philadelphia, Pennsylvania (SPRPA1-20-C-Z043). DEFENSE ADVANCED RESEARCH PROJECTS AGENCY PAR Government Systems Corp., Rome, New York, was awarded an $11,920,160 cost-plus-fixed-fee contract for a research project under the Semantic Forensics (SemaFor) program. The SemaFor program will develop methods that exploit semantic inconsistencies in falsified media to perform tasks across media modalities and at scale. Work will be performed in Rome, New York, with an expected completion date of June 2024. Fiscal 2020 research, development, test and evaluation funding in the amount of $1,500,000 are being obligated at time of award. This contract was a competitive acquisition under a full and open broad agency announcement and 37 proposals were received. The Defense Advanced Research Projects Agency, Arlington, Virginia, is the contracting activity (HR0011-20-C-0126). ARMY ControlPoint Surveying Inc.,* Honolulu, Hawaii (W9128A-20-D-0002); Masa Fujioka & Associates,* Aiea, Hawaii (W9128A-20-D-0003); and Sam O. Hirota Inc.,* Honolulu, Hawaii (W9128A-20-D-0004), will compete for each order of the $9,900,000 firm-fixed-price contract for indefinite-delivery architect-engineer services for miscellaneous projects in the Pacific region. Bids were solicited via the internet with four received. Work locations and funding will be determined with each order, with an estimated completion date of June 16, 2025. U.S. Army Corps of Engineers Honolulu, Hawaii, is the contracting activity. Honeywell International Inc., Phoenix, Arizona, was awarded a $7,738,247 modification (P00101) to contract W56HZV-12-C-0344 for hardware and services exercise of options for the Total Integrated Engine Revitalization Automated Gas Turbine 1500 program for the Abrams tank and family of vehicles. Work will be performed in Phoenix, Arizona, with an estimated completion date of Dec. 31, 2020. Fiscal 2020 Army working capital funds; and weapons and tracked combat vehicle procurement (Army) funds in the amount of $7,738,247 were obligated at the time of the award. U.S. Army Contracting Command, Detroit Arsenal, Michigan, is the contracting activity. *Small Business https://www.defense.gov/Newsroom/Contracts/Contract/Article/2223800/source/GovDelivery/

  • In War, Chinese Shipyards Could Outpace US in Replacing Losses; Marine Commandant

    18 juin 2020 | International, Aérospatial, Naval, Terrestre

    In War, Chinese Shipyards Could Outpace US in Replacing Losses; Marine Commandant

    “Replacing ships lost in combat will be problematic," Marine Commandant Gen. David Berger writes in a forthcoming paper. "Our industrial base has shrunk while peer adversaries have expanded their shipbuilding capacity. In an extended conflict, the United States will be on the losing end of a production race.” By PAUL MCLEARYon June 17, 2020 at 4:44 PM WASHINGTON: The Commandant of the Marine Corps, Gen. David Berger, dismisses current Marine and Navy plans for amphibious ships as “obsolete,” and worries that in any conflict, China could replace damaged ships faster than the US in a draft operating concept obtained by Breaking Defense. The warnings are the latest in a campaign waged by the reform-minded Berger to overhaul how the Marine Corps trains and equips to meet the challenges of China and other advanced nations, while working more closely with the other armed services and allies around the globe. In the sharply-worded 22-page document, Berger rejects war plans anticipating a Cold War-style confrontation in which huge ships can creep close to shore free from the threat of precision-guided munitions being launched from batteries deep inland. He calls the current configuration of amphibious ships “the most obvious manifestation of this obsolete paradigm” in a draft document obtained by Breaking Defense. In an unsigned draft of the unreleased report, “Naval Campaigning: The 2020 Marine Corps Capstone Operating Concept,” Berger underlines the need for new thinking about how the Marine Corps and Navy will fight an advanced Chinese military that can control islands, coastlines, and vast swaths of the sea with aircraft carriers, a swelling blue ocean fleet and long-distance precision munitions. The old way of thinking “is also exemplified by our current amphibious warships and maritime prepositioning ships, which are large and built for deployment efficiency rather than warfighting effectiveness,” he writes. “These superb, multipurpose ships are extremely expensive—meaning we've never had the desired number.” Berger also raises significant concerns about the United States' ability to replace any combat losses, even in a short, sharp conflict. “Replacing ships lost in combat will be problematic, inasmuch as our industrial base has shrunk, while peer adversaries have expanded their shipbuilding capacity. In an extended conflict, the United States will be on the losing end of a production race—reversing the advantage we had in World War II when we last fought a peer competitor.” The stark admission comes as the Navy's shipyards struggle under the disruptions caused by COVID-19, leading the service to order an emergency call up over 1,600 Reservists to fill labor shortages to do repair work on aircraft carriers and submarines in a desperate effort to get them back out to sea as soon as possible. Berger takes care not to blame the Navy for building expensive, relatively slow amphibious ships to carry Marines across the globe. “These issues should not be construed as a criticism of our Navy partners who built the fleet—to include the types of amphibious warfare and maritime prepositioning ships the Marine Corps asked for—that was appropriate to the security era within the constraints of finite resources.” But that era is now over the Corps wants to build a more dynamic “inside force” of smaller ships that can operate within range of Chinese and Russian weapons and pack a potent offensive punch while offering more and smaller targets than the current amphibious fleet. But these small ships won't replace their bigger cousins — they'll come in addition to them, creating new issues for both Navy budgets and the limited number of shipbuilders who can produce hulls for the sea service. The ships will also need ports to call home. “One can think of basing forces and lots of smaller vessels in theater, but this raises the issue of where to put everything and doesn't seem to be a ready solution that replaces divestiture of large ships,” said Dakota Wood, senior research fellow for defense programs at The Heritage Foundation. In recent weeks, the Navy met with shipbuilders to talk about plans for a new class of logistics ship that can operate under fire and resupply Marines deep within the range of enemy precision weapons. The Next Generation Medium Logistics Ship would resupply both ships at sea, as well as small, ad hoc bases ashore. The ship fits within plans Berger has made to stand up several Marine Littoral Regiments designed to move fast and have their own integrated anti-air and possibly anti-ship weapons. The Corps and Navy are also looking to buy as many as 30 Light Amphibious Warships in coming years, which would be much smaller than the current amphibious ships. The draft document doesn't include any those specifics. But Berger has already done that work in previous statements and documents, where he outlined plans: to rethink the role that large amphibious ships play in future; divest of M1 Abrams tanks; cut artillery units; slash helicopter squadrons; and reassess the role F-35s might play in future operations. Berger has admitted he realizes he needs to undertake this transition within existing budgets, leading him to call for cutting tanks, helicopters, and even some end strength. But for the Navy, Wood said, “I think much of this will be added cost because it must maintain current capabilities (types of ships) while developing new capabilities. It does not have the luxury of getting rid of current before new replacements are ready.” A significant omission in all of these plans is the absence of a larger, coherent naval strategy. The 30-year shipbuilding plan, due to Congress in February, continues to be missing in action. A major Navy force structure review was rejected by Defense Secretary Mark Esper earlier this year. The force structure review, currently being taken apart by Deputy Defense Secretary David Norquist, is expected this fall. The Navy's plans are in such a fluid state that Vice Adm. Stuart Munsch, head of the service's Warfighting Development office, cited Chinese attention as a reason to decline to give a progress report in a call with reporters earlier this month. “I'm not going to divulge our intentions,” he said. “I'm very conscious that, if I say anything public, I'm an authoritative source and the Chinese will key on what I say, and likewise any kind of public-facing document that we put out as well.” Pressed to explain what the Navy's strategy for operating in a world with competing great powers looks like, Munsch said, “I'm not sure how you would see that keeping our intentions for warfighting classified is something you would want as an American citizen.” While Berger continues to push out papers and strategies for pushing the Marines into the future, the Navy, which will provide much of the lift he needs, is still at the drawing board. https://breakingdefense.com/2020/06/in-war-chinese-shipyards-can-outpace-us-in-replacing-losses

  • Army Reassures Anxious Industry Over Stryker Cannon Competition

    18 juin 2020 | International, Terrestre

    Army Reassures Anxious Industry Over Stryker Cannon Competition

    While at least two of six competitors have dropped out, the Army says it will still have plenty of 30mm turret options to choose from as it starts testing this fall. By SYDNEY J. FREEDBERG JR.on June 17, 2020 at 2:43 PM WASHINGTON: “This is a healthy competition,” the head of the Army Stryker program, Col. Bill Venable, reassured reporters. “My No. 1 mandate as the overall program manager was to protect the competition in this first phase.” Venable was allaying anxieties yesterday about the five-year-old effort to upgun the infantry transport version of the Stryker, an 8×8 armored vehicle that's become an Army workhorse worldwide since its controversial introduction in 2003. The wheeled Stryker was criticized for having lighter armor than the tracked M1 Abrams and M2 Bradley, although it's far better protected than Humvees. It often struggled over Afghan terrain. But its ability to move rapidly by road – with fewer stops for gas and maintenance than heavy armored vehicles – made it a favorite of US commanders from Iraq to Estonia. So, while overshadowed by high-tech prototypes from hypersonic missiles to high-speed helicopters to robotic tanks, the Army is doubling down on the proven Stryker in several ways: Two light infantry brigades are being converted into Stryker units, which increases the number of active-duty Stryker brigades from five to seven. (There are two more part-time units in the National Guard). Original manufacturer General Dynamics has a $2.4 billion contract to rebuild hundreds of existing Strykers as DVHA1 models with bigger engines, upgraded electronics, and mine-resistant “double-V” hulls. Leonardo DRS is developing a new anti-aircraft variant called IM-SHORAD. It is several months behind schedule due to COVID disruptions and software issues. And the Army is upgunning the basic infantry-carrier variant from an exposed 12.7mm (0.50 cal) machinegun, viable against infantry and unarmored trucks, to a turret-mounted Medium Caliber Weapon System (MCWS), a 30mm autocannon capable of killing light armored vehicles widely used by Russia General Dynamics urgently built 83 upgunned Strykers to reequip a single Europe-based brigade. Now the Army is holding an open competition for an official Program of Record (POR) to upgrade at least three more brigades with a more refined 30mm turret design – but we've heard some anxiety over whether any other vendor can really unseat the incumbent. Out of six companies awarded $150,000 design contracts last summer, Venable confirmed that at least two have dropped out. At the current — sensitive — stage of the competition, the program manager said after a quick consultation with his staff, he isn't allowed to disclose how many companies remain and how many have quit. But Venable did tell reporters that one vendor dropped out because it wasn't making adequate progress to meet the technical requirements, while another decided it didn't have a good enough chance of winning to justify the investment. While the Army gave competitors free Strykers and 30mm guns, they must provide their own turrets, electronics and other components to integrate the weapon and the vehicle into a functional fighting system, to be delivered to the Army for testing by August 10. “We're not funding their development,” Venable said, “[which is] in some cases millions of dollars they're going to invest.” While he won't second-guess any company's cost-benefit calculus, he's been working with all of them to try to keep them in the running, despite disruptions caused by the COVID-19 pandemic. “We have adjusted the evaluation strategy in order to maintain the competition as robust as we can,” he said. “This isn't the first competitive selection effort that I've run, and I will say we have more [viable competitors] than the incumbent, significantly more than the incumbent,” Venable told reporters. “We're going to present a variety of choices to the source selection authority to evaluate starting on 10 August.” Once the vehicles arrive in August, the Army will live-fire the 30 mm guns, check out the armor, and conduct a host of other tests. By January, Venable expects to have that data ready for the evaluation board, which aims to announce a winner by the end of April, 2021. After that, the winning company will start mass production, with the first vehicles scheduled for delivery to a Stryker unit in August or September 2022. That meets the Army's previously announced deadline to start fielding by the end of fiscal '22, Venable said. But the brigade will spend months more taking possession of the vehicles and training on them – a “Rubik's Cube” of logistics and scheduling, Venable said — before it's officially declared the “First Unit Equipped,” probably around March 2023. https://breakingdefense.com/2020/06/army-rebuffs-anxiety-over-stryker-cannon-competition

Partagé par les membres

  • Partager une nouvelle avec la communauté

    C'est très simple, il suffit de copier/coller le lien dans le champ ci-dessous.

Abonnez-vous à l'infolettre

pour ne manquer aucune nouvelle de l'industrie

Vous pourrez personnaliser vos abonnements dans le courriel de confirmation.