Filtrer les résultats :

Tous les secteurs

Toutes les catégories

    3558 nouvelles

    Vous pouvez affiner les résultats en utilisant les filtres ci-dessus.

  • Huntington Ingalls Industries Continues Planning for Mid-life Refueling Overhaul of USS John C. Stennis (CVN 74)

    5 août 2019 | International, Naval

    Huntington Ingalls Industries Continues Planning for Mid-life Refueling Overhaul of USS John C. Stennis (CVN 74)

    NEWPORT NEWS, Va., Aug. 01, 2019 (GLOBE NEWSWIRE) -- Huntington Ingalls Industries (NYSE: HII) announced today that its Newport News Shipbuilding division has received a $290 million contract modification from the U.S. Navy to continue planning for the refueling and complex overhaul (RCOH) of the aircraft carrier USS John C. Stennis (CVN 74). The contract funds the second and third years of planning, long-lead-time material procurement, shop fabrication, shipboard inspections, and facilities readiness for the RCOH. As part of the planning contract, Newport News also will perform some shipboard work, which will take place in Norfolk. The initial year of planning was funded at a base value of $187.5 million. “The second and third year of planning is important to the overall success of a project of the magnitude of an RCOH,” said Chris Miner, Newport News' vice president of in-service aircraft carriers. “This contract allows us to continue our critical planning for each step of the process so we're ready to begin execution when the ship arrives in the first quarter of 2021.” Stennis will be the seventh Nimitz-class carrier to undergo a major life-cycle overhaul at Newport News, representing 35 percent of all maintenance and modernization completed during its service life. An RCOH is an extremely complex engineering and construction project that involves more than 680 suppliers from 40 states providing material and services critical to the overhaul process. Once completed, a recapitalized carrier is capable of supporting current and future warfare doctrine and continuing to operate as the centerpiece of the Navy's fleet and national defense for another 25 years. About Huntington Ingalls Industries Huntington Ingalls Industries is America's largest military shipbuilding company and a provider of professional services to partners in government and industry. For more than a century, HII's Newport News and Ingalls shipbuilding divisions in Virginia and Mississippi have built more ships in more ship classes than any other U.S. naval shipbuilder. HII's Technical Solutions division provides a wide range of professional services through its Fleet Support, Mission Driven Innovative Solutions, Nuclear & Environmental, and Oil & Gas groups. Headquartered in Newport News, Virginia, HII employs more than 41,000 people operating both domestically and internationally. For more information, visit: HII on the web: www.huntingtoningalls.com HII on Facebook: www.facebook.com/HuntingtonIngallsIndustries HII on Twitter: twitter.com/hiindustries CONTACT INFORMATION Duane Bourne Manager of Media Relations (757) 380-3581 Duane.A.Bourne@hii-co.com https://newsroom.huntingtoningalls.com/releases/photo-release-huntington-ingalls-industries-continues-planning-for-mid-life-refueling-overhaul-of-uss-john-c-stennis-cvn-74

  • Government of Canada announces construction of new icebreakers for Canadian Coast Guard

    5 août 2019 | Local, Naval

    Government of Canada announces construction of new icebreakers for Canadian Coast Guard

    IQALUIT, NU, Aug. 2, 2019 /CNW/ - Canadians across the country rely on the critical services of the Canadian Coast Guard to protect mariners and the marine environment, and to ensure the safe and efficient movement of ships that are key to our vibrant economy. With continued growth in commercial shipping and with climate change already affecting our communities, demands on the Coast Guard continue to grow. The Coast Guard provides critical icebreaking services to ensure commercial ships and ferries have access to Canadian ports during the winter time, and supports summer re-supply activities in Canada's Arctic. To ensure the Coast Guard can continue to deliver these essential services, today, the Honourable Jonathan Wilkinson, Minister of Fisheries, Oceans and the Canadian Coast Guard, announced that the Coast Guard will be procuring six new program icebreakers to replace its current aging fleet of icebreakers. Minister Wilkinson also announced, on behalf of the Honourable Carla Qualtrough, Minister of Public Services and Procurement and Accessibility, that the Government of Canada is officially launching a competitive process, through an Invitation to Qualify, to add a third Canadian shipyard as a strategic partner under the National Shipbuilding Strategy (NSS). This new shipyard will build the new program icebreakers for the Coast Guard. Coast Guard program icebreakers are essential to Canada's economy by supporting year-round marine trade in Eastern Canada, the St. Lawrence waterway and the Great Lakes. They enable eastern Canadian ferries to operate during the winter time, and are critical to Canada's commercial fisheries. The program icebreakers are also used to provide service to Canada's northern residents by supporting the annual re-supply of goods to Canada's Arctic communities and their industries. Quotes "The Canadian Coast Guard saves lives at sea, maintains safe shipping, enables an otherwise ice-choked economy, protects the marine environment and supports Canadian sovereign presence in the Arctic. Demands on the Coast Guard will only grow as the impacts of climate change become more frequent and intense. By adding the new program icebreakers to renew the fleet, we are ensuring the women and men of the Canadian Coast Guard have the equipment they need to deliver icebreaking services in the Arctic, on the St. Lawrence waterway and on Canada's East Coast." The Honourable Jonathan Wilkinson Minister of Fisheries, Oceans and the Canadian Coast Guard "This is an important undertaking with another significant investment to back it up, and it means even more jobs, more opportunity and more economic development right across the country, while ensuring our Canadian Coast Guard has the ships it needs to do its important work. Together with our partners, we are renewing Canada's federal fleet, advancing Canadian technological innovation and supporting jobs across Canada." The Honourable Carla Qualtrough Minister of Public Services and Procurement and Accessibility Quick facts Through the Invitation to Qualify, the Government of Canada will establish a short list of pre-qualified shipyards that will be eligible to submit a formal proposal to become the third strategic partner under the NSS, joining Irving Shipbuilding Inc. and Seaspan's Vancouver Shipyards. Interested suppliers have 15 days, starting today, to respond to the Invitation to Qualify. On May 22, 2019, Prime Minister Justin Trudeau announced that the Government of Canada is investing $15.7 billionto renew the Coast Guard fleet, with up to 16 Multi-Purpose Vessels to be built at Seaspan's Vancouver Shipyards and two new Arctic and Offshore Patrol Ships to be built at Irving Shipbuilding Inc. To date, the Government of Canada has awarded more than $11.4 billion in NSS-related contracts across the country. The Government of Canada's NSS is a long-term, multi-billion-dollar program focused on renewing the Canadian Coast Guard and Royal Canadian Navy fleets to ensure that Canada's marine agencies have the modern ships they need to fulfill their missions, while revitalizing Canada's marine industry, creating good middle-class jobs and maximizing economic benefits across the country. Related products Backgrounder – Canadian Coast Guard's new icebreakers Backgrounder – Canada's National Shipbuilding Strategy – Process to add a third shipyard Associated links National Shipbuilding Strategy Prime Minister announces renewal of Canadian Coast Guard fleet Follow us on Twitter Follow us on Facebook SOURCE Public Services and Procurement Canada For further information: Marielle Hossack, Press Secretary, Office of the Honourable Carla Qualtrough, 819-997-5421; Media Relations, Public Services and Procurement Canada, 819-420-5501, media@pwgsc-tpsgc.gc.ca; Jocelyn Lubczuk, Press Secretary, Office of the Minister of Fisheries, Oceans and the Canadian Coast Guard, 343-548-7863, Jocelyn.lubczuk@dfo-mpo.gc.ca; Media Relations, Fisheries, Oceans and the Canadian Coast Guard, 613-990-7537, Media.xncr@dfo-mpo.gc.ca Related Links www.tpsgc-pwgsc.gc.ca https://www.newswire.ca/news-releases/government-of-canada-announces-construction-of-new-icebreakers-for-canadian-coast-guard-821197891.html

  • U.S. Navy Commissions Littoral Combat Ship 15 (Billings)

    5 août 2019 | International, Naval

    U.S. Navy Commissions Littoral Combat Ship 15 (Billings)

    KEY WEST, Fla., Aug. 3, 2019 /PRNewswire/ -- The U.S. Navy commissioned USS Billings (LCS 15) – the nation's eighth Freedom-variant Littoral Combat Ship (LCS) – in Key West, Florida. This milestone places the ship, built by the Lockheed Martin (NYSE: LMT) -led team into active service. "Billings was designed to operate and adapt to a rapidly changing environment," said Joe DePietro, vice president of Small Combatants and Ship Systems at Lockheed Martin. "She is equipped and ready for today's threats and easily modifiable to meet the threats we may not even be aware of yet. Our team is confident Billings will be what the Navy needs when the fleet needs it." Unique among combat ships, LCS is designed to complete close-to-shore missions and is a growing and relevant part of the Navy's fleet. It is fast — capable of speeds in excess of 40 knots. It is automated — with the most efficient staffing of any combat ship. It is lethal — standard equipped with Rolling Airframe Missiles (RAM) and a Mark 110 gun, capable of firing 220 rounds per minute. It is flexible — with 40 percent of the hull easily reconfigurable, integrating capabilities like the Longbow Hellfire Missiles, 30mm guns, and manned and unmanned vehicles targeted to meet today's and tomorrow's missions. "Having now commanded two freedom class LCS variants, I would like to report that these ships are truly impressive and will fit well in the niche they have been designed for," said LCS 15's Commanding Officer, Commander Nathan Rowan. "They are fast, maneuverable, and their weapon systems are some of the most accurate I've witnessed on any platform of which I've previously served." There are seven ships in various stages of production and test at Fincantieri Marinette Marine in Wisconsin, where the Freedom-variant LCS is built. The next Freedom-variant in the class is LCS 17, the future USS Indianapolis, which was delivered in late July. "On behalf of the proud 2,000 men and women who transform flat steel into a fast, agile surface combatant," said Jan Allman, CEO of Fincantieri Marinette Marine, "we are honored to support the U.S. Navy, and we congratulate the outstanding crew of the USS Billings." Multimedia assets are available here: Social media video: https://vimeo.com/351803068 B-roll: https://vimeo.com/351805414 Photos: https://www.flickr.com/photos/143371902@N04/albums/72157710070352016 For more information, visit www.lockheedmartin.com/lcs. https://news.lockheedmartin.com/2019-08-03-U-S-Navy-Commissions-Littoral-Combat-Ship-15-Billings

  • Contract Awards by US Department of Defense - August 2, 2019

    5 août 2019 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité

    Contract Awards by US Department of Defense - August 2, 2019

    AIR FORCE HEBCO Inc., Oklahoma City, Oklahoma, has been awarded an $80,000,000 indefinite-delivery/indefinite-quantity contract for A-10 technical order sustainment. This contract provides for 10 years of non-personal technical services in support of technical order sustainment activities by providing technically accurate and up-to-date digital technical data. Work will be performed at Oklahoma City, Oklahoma; and Clearfield, Utah, and is expected to be complete by Aug. 1, 2030. This award is the result of a sole-source acquisition. Fiscal 2019 operations and maintenance funds in the amount of $445,739 are being obligated at the time of award. The Air Force Life Cycle Management Center, Hill Air Force Base, Utah, is the contracting activity (FA8202-19-D-0003). The Boeing Co., Seattle, Washington, has been awarded a not-to-exceed $55,500,000 undefinitized contract action modification (P00177) to the previously awarded, FA8625-11-C-6600, for KC-46 engineering, manufacturing and development contract. This modification is for the system level hardware and software critical design review of the boom telescope actuator redesign. Work will be performed at Seattle, Washington, and is expected to be completed February 2021. Fiscal 2018 research and development funds in the amount of $20,845,672 are being obligated at the time of award. The Air Force Life Cycle Management Center, Wright-Patterson Air Force Base, Ohio, is the contracting activity. Rockwell Collins Simulation & Training Solutions, Cedar Rapids, Iowa, has been awarded a $40,219,702 indefinite-delivery/indefinite-quantity contract for E-8 Aircrew Training Device sustainment. This contract provides for contractor logistics support and training system support center operations of the Joint Surveillance Target Attack Radar System Aircrew Training Device. Work will be performed at Robins Air Force Base, Georgia; and Sterling, Virginia, and is expected to be complete by Aug. 3, 2029. This award is the result of a sole-source acquisition. Fiscal 2019 Air National Guard operations and maintenance funds in the amount of $3,556,865 are being obligated on the first delivery order at the time of award. The Air Force Life Cycle Management Center, Robins Air Force Base, Georgia, is the contracting activity (FA8529-19-D-0001). Raytheon Co. Space and Airborne Systems, McKinney, Texas, has been awarded a $23,817,657 contract for two prototype High Energy Laser Weapon Systems (HELWS). This award provides for outside continental U.S. (OCONUS) field assessment for purposes of experimentation including, but is not limited to, 12 months of in-field operation by Air Force personnel against unmanned aerial systems threats. Work will be performed OCONUS and is expected to be completed by Nov. 1, 2020. This award is the result of a sole-source acquisition. Fiscal 2018 research, development, test and evaluation funds in the amount of $23,817,657 are being obligated at the time of award. The Air Force Research Laboratory, Wright Patterson Air Force Base, Dayton, Ohio, is the contracting activity (FA8650-19-9-9326). DEFENSE LOGISTICS AGENCY C&C Produce Inc.,* North Kansas City, Missouri, has been awarded a maximum $48,000,000 firm-fixed-price with economic-price-adjustment, indefinite-delivery/indefinite-quantity contract for fresh fruits and vegetables. This was a competitive acquisition with three responses received. This is a 36-month contract with no option periods. Locations of performance are Kansas and Missouri, with a July 30, 2022, performance completion date. Using customers are Army, Air Force, and Department of Agriculture schools and reservations. Type of appropriation is fiscal 2019 through 2022 defense working capital funds. The contracting activity is the Defense Logistics Agency Troop Support, Philadelphia, Pennsylvania (SPE300-19-D-P345). ARMY NTVI Enterprises LLC,* Falls Church, Virginia (W9127S-19-D-6001); Global Engineering & Construction LLC,* Renton, Washington (W9127S-19-D-6002); KJS Support Services JV LLC,* Fort Worth, Texas (W9127S-19-D-6003); and Royce Construction Services LLC,* Reston, Virginia (W9127S-19-D-6000), will compete for each order of the $45,000,000 firm-fixed-price contract for mechanical infrastructure repair services. Bids were solicited via the internet with 10 received. Work locations and funding will be determined with each order, with an estimated completion date of Aug. 1, 2022. U.S. Army Corps of Engineers, Little Rock, Arkansas, is the contracting activity. American Ordnance, Middletown, Iowa, was awarded a $43,351,782 modification (0003 28) to contract W52P1J-16-D-0050 for M795 155mm projectile load assemble and pack. Work will be performed in Middletown, Iowa, with an estimated completion date of Dec. 31, 2022. Fiscal 2017, 2018 and 2019 procurement of ammunition, Army funds in the amount of $43,351,782 were obligated at the time of the award. U.S. Army Contracting Command, Rock Island Arsenal, Illinois, is the contracting activity. DEFENSE INFORMATION SYSTEMS AGENCY HGSNet LLC, Vienna, Virginia, was awarded a Direct 8(a), firm-fixed-price contract, HC1084-19-C-0006, for development, deployment and sustainment (DD&S) services. These services include requirements analysis, software engineering, systems integration and interoperability, data engineering and management, test, deployment, and development, security and operations (DevSecOps), cloud, infrastructure engineering and transitioning systems to operations in support of the National Background Investigations System. The place of performance will be at the contractor's location in Vienna, Virginia. The contract ceiling is $21,932,725 funded by fiscal 2019 research, development, testing and evaluation funds; and operations and maintenance funds. The proposal was solicited via email to HGSNet LLC. The period of performance consists of one one-year base period and one six-month option period. The period of performance for the base year is Aug. 5, 2019, through Aug. 4, 2020, and the option period follows through to Feb. 5, 2021. The Defense Information Technology Organization, Scott Air Force Base, Illinois, is the contracting activity. Kapili Services LLC, Orlando, Florida, was awarded a Direct 8(a), firm-fixed-price contract, HC1084-19-C-0005, for system engineering and technical assistance (SETA) support services. The face value of this action is $18,095,364 funded by fiscal 2019 operations and maintenance funds. The total cumulative value of the contract is $18,095,364. Performance will be at the contractor's facility located in Orlando, Florida. The proposal was solicited via email to Kapili Services LLC. The period of performance consists of one one-year base period and two one-year options. The period of performance is for the base year is Aug. 5, 2019, through Aug. 4, 2020, and the option years follow consecutively through Aug. 4, 2022. The Defense Information Technology Contracting Organization, Scott Air Force Base, Illinois, is the contracting activity. NAVY The Boeing Co., St. Louis, Missouri, is awarded $8,905,835 for modification P00023 to a previously awarded cost-plus-fixed-fee contract, N00019-16-C-0032, to continue software development efforts for calendar year 2019 in support of the Next Generation Jammer. Work will be performed in St. Louis, Missouri, and is expected to be completed in December 2019. Fiscal 2019 research, development, test and evaluation (Navy) funds in the amount of $8,905,835 will be obligated at time of award, none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. *Small Business https://dod.defense.gov/News/Contracts/Contract-View/Article/1924880/source/GovDelivery/

  • Land Systems Integration Team Is Leader in Model-Based Systems Engineering

    5 août 2019 | International, Naval

    Land Systems Integration Team Is Leader in Model-Based Systems Engineering

    By C. Michaela Judge, Naval Information Warfare Center Atlantic Public Affairs CHARLESTON, S.C. (NNS) -- The Land Systems Integration (LSI) Division at Naval Information Warfare Center (NIWC) Atlantic continues to be an enterprise leader in Model-Based Systems Engineering (MBSE) for their work on land systems modernization and integration. MBSE is an engineering approach that utilizes a common, digital tool suite allowing all team members – from engineer to sponsor – to have awareness, line-of-sight and an understanding of the interaction between the various moving parts across the systems engineering and project lifecycle. LSI's Vehicular Technology Transition (VTT) team incorporates the full range of MBSE techniques into their systems engineering projects to support the Marine Corps and has had great success in continuing this approach in their daily work. “What makes LSI and our team specifically successful is the depth of knowledge in implementation of using the MBSE Tool Suite,” said Tim Turner, VTT team lead. “Our engineering work isn't radically different than any other engineering groups across the Command; it's how we're putting the data in the system and making it transparent to everyone that needs to have access to it.” Though engineers have been performing systems engineering in some capacity for decades, using this model-based approach provides an added advantage to deliver effective and timely solutions to the warfighter. “Our MBSE Tool Suite is a set of seamlessly integrated engineering lifecycle management tools that work together as one,” said Jacob Witmer, VTT team Military GPS User Equipment (MGUE) project lead. “We use these tools to manage requirements and architectures, plan projects, track changes, manage quality, and provide an enterprise library management system where you catalog, organize, use, reuse, manage, and report on any type of software, technology, or business asset.” In the vehicle transition domain, the VTT team utilized MBSE techniques to solve real-world challenges for the warfighter. Most recently, they used MBSE to conduct global positioning system (GPS) integration work conducted on the Joint-Light Tactical Vehicle, the MGUE Program's lead platform. “When we look at all of the people our team has to work with on this integration project, we have to manage a lot of different data, to include where the trucks are manufactured, where GPS is managed, the performance level of the GPS card, the truck integration and more,” said Witmer. “There are a lot of players, managing a lot of data in a lot of different formats from different geographic parts of the country. That's really what the MBSE Tool Suite is designed to do – manage, connect and link the data to see how they impact each other.” One cost-avoidance benefit of using the MBSE Tool Suite, in time and man-hours, includes the ability to quickly build reports. “We can build 150-page project requirements documents in three minutes because the data is already in the Tool Suite,” said Ryan Longshore, VTT team technical lead. “There is an investment in time and energy upfront in loading the data, but a report that would take 30 to 90 days is done in a matter of minutes and everything from that project is captured in the report.” The team's use of MBSE is not only essential to connecting and maintaining data across a project, but also a necessary resource in developing physical models and solutions in a fraction of the time previously needed to fulfill a warfighter requirement. “Our team works within the Systems Integration Laboratory (SIL) to design and test on multiple vehicular platforms,” said Turner. “The lab allows us to execute MBSE across all team functions, from mission thread to risk analysis or program management.” The team maintains physical models for all of the vehicle platforms they support. When a requirement from a sponsor arrives, the team can use tools within the SIL to design and print a three-dimensional piece of hardware and test it on an existing model before they touch a physical vehicle. The team conducts engineering, mechanical and software-related integration testing and design work all within the laboratory. “It's all about testing upfront, learning upfront, failing faster and learning from it and moving on and improving on the design,” said Turner. As the team designs and tests within the lab, they also update the MBSE Tool Suite is to capture lessons learned, integration challenges and real-time project data for all team members to access. “The beauty of the suite being so integrated is that it doesn't matter what type of systems engineering methodology a project uses, the tools can be tailored to meet a myriad of engineering processes and organizing the data by methodology saves countless hours in digging around trying to find historical artifacts,” said Witmer. The team can now complete an integration project that previously took 18 to 36 months as quickly as six to nine months, without sacrificing quality, thanks to the value of MBSE. With VTT and other teams reaping the benefits of MBSE, NIWC Atlantic created a training and workforce development path to work toward a Command-wide adoption of this method. Communities of interest, industry engagements and training events on MBSE methods are a few of the efforts implemented to date. The VTT uses these training approaches, to a smaller-scale, to continue to encourage MBSE implementation and help employees understand the power of using a model-based approach to apply agility in executing warfighter solutions. “We're seeing the benefits and through MBSE my team has the flexibility to fail fast and learn a lot upfront,” said Turner. The team's success with the MBSE Tool Suite is a Command-wide example of how the transparency and connectivity of engineering data help to provide integration solutions to NIWC Atlantic customers with a high confidence of success. As a part of Naval Information Warfare Systems Command, NIWC Atlantic provides systems engineering and acquisition to deliver information warfare capabilities to the naval, joint and national warfighter through the acquisition, development, integration, production, test, deployment, and sustainment of interoperable command, control, communications, computer, intelligence, surveillance, and reconnaissance, cyber and information technology capabilities. https://www.navy.mil/submit/display.asp?story_id=110447

  • CH-53E Heavy Lift Helicopter Reaches One Million Flight Hours

    5 août 2019 | International, Aérospatial, Naval

    CH-53E Heavy Lift Helicopter Reaches One Million Flight Hours

    Aircraft First Entered Service With The USMC In 1981 The CH-53E Super Stallion helicopter reached a major milestone this year by logging more than one million flight hours since it first entered service with the Marine Corps in 1981. The CH-53E is a versatile machine used for amphibious assault and long-range insertion, delivering troops, vehicles and supplies. This rapid resupply vehicle is still one of the most used aircraft in the United States military air arsenal. “The CH-53E has seen more work than was ever anticipated it would see,” said Major Matthew Baumann, H-53 In-Service, Naval Air Systems Command Heavy Lift Helicopter program office (PMA-261) co-lead. Currently, there are 142 CH-53E Super Stallions in service. Though out of production, the CH-53E is in the middle of a “RESET” – a rolling period of rebuilding, upgrading and increasing safety, reliability and capabilities to lengthen its service life through 2032. According to Baumann, the first 25 helicopters have completed their RESET process, “allowing the squadron commanders to plan for training, operations and maintenance with renewed confidence,” he said. Resetting of the CH-53E fleet is an important segue from the current platform to the new CH-53K King Stallion, which will be its heavy-lift replacement. “The CH-53K is the most powerful helicopter ever built by the United States military,” said Colonel Perrin, PMA-261 program manager. “It will be safer, faster and more capable than any previous heavy lift helicopter in the battlespace.” Its development is currently in the testing and capability requirements phase, with a goal of bringing the CH-53K to fleet Marines by 2024. “It's a game-changer,” said Perrin. “We can't wait to have the K available for fleet use. But for now we've got a capable, reliable and safe helicopter doing heavy-lift for our Marines.” http://www.aero-news.net/index.cfm?do=main.textpost&id=8e63f37f-9874-4fb9-acf1-72e67d6a9cbd

  • CH-53E Heavy Lift Helicopter Reaches One Million Flight Hours

    5 août 2019 | International, Aérospatial, Naval

    CH-53E Heavy Lift Helicopter Reaches One Million Flight Hours

    Aircraft First Entered Service With The USMC In 1981 The CH-53E Super Stallion helicopter reached a major milestone this year by logging more than one million flight hours since it first entered service with the Marine Corps in 1981. The CH-53E is a versatile machine used for amphibious assault and long-range insertion, delivering troops, vehicles and supplies. This rapid resupply vehicle is still one of the most used aircraft in the United States military air arsenal. “The CH-53E has seen more work than was ever anticipated it would see,” said Major Matthew Baumann, H-53 In-Service, Naval Air Systems Command Heavy Lift Helicopter program office (PMA-261) co-lead. Currently, there are 142 CH-53E Super Stallions in service. Though out of production, the CH-53E is in the middle of a “RESET” – a rolling period of rebuilding, upgrading and increasing safety, reliability and capabilities to lengthen its service life through 2032. According to Baumann, the first 25 helicopters have completed their RESET process, “allowing the squadron commanders to plan for training, operations and maintenance with renewed confidence,” he said. Resetting of the CH-53E fleet is an important segue from the current platform to the new CH-53K King Stallion, which will be its heavy-lift replacement. “The CH-53K is the most powerful helicopter ever built by the United States military,” said Colonel Perrin, PMA-261 program manager. “It will be safer, faster and more capable than any previous heavy lift helicopter in the battlespace.” Its development is currently in the testing and capability requirements phase, with a goal of bringing the CH-53K to fleet Marines by 2024. “It's a game-changer,” said Perrin. “We can't wait to have the K available for fleet use. But for now we've got a capable, reliable and safe helicopter doing heavy-lift for our Marines.” http://www.aero-news.net/index.cfm?do=main.textpost&id=8e63f37f-9874-4fb9-acf1-72e67d6a9cbd

  • Contract Awards by US Department of Defense - Aug 1, 2019

    2 août 2019 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité

    Contract Awards by US Department of Defense - Aug 1, 2019

    DEFENSE LOGISTICS AGENCY Tesoro Refining and Marketing Co., San Antonio, Texas (SPE602-19-D-0506, $348,692,953); BP Products North America Inc., Chicago, Illinois (SPE602-19-D-0514, $315,599,804); Par Hawaii Refining LLC, Houston, Texas (SPE602-19-D-0510, $271,274,321); Valero Marketing and Supply Co., San Antonio, Texas (SPE602-19-D-0504, $260,554,844); Equillon Enterprises LLC, doing business as Shell Oil Products, Houston, Texas (SPE602-19-D-0509, $228,126,037); BP West Coast Products LLC, Blaine, Washington (SPE602-19-D-0512, $157,502,370); U.S. Oil and Refining Co., Tacoma, Washington (SPE602-19-D-0513, $156,746,055); Petro Star Inc.,* Anchorage, Alaska (SPE600-19-D-0505, $110,836,555); Phillips 66 Co., Houston, Texas (SPE602-19-D-0515, $58,246,377); Epic Aviation LLC, Salem, Oregon (SPE602-19-D-0508, $38,905,276); and Sinclair Oil Corp.,* doing business as Sinclair, Salt Lake City, Utah, (SPE602-19-D-0507, $38,197,366), have each been awarded a fixed-price with economic-price-adjustment, indefinite-delivery/indefinite-quantity contract under solicitation SPE602-19-R-0703 for various types of fuel. These were competitive acquisitions with 21 offers received. They are one-year contracts with a 30-day carryover. Locations of performance are Texas, Illinois, Washington, Alaska, Oregon, Utah, and the Rocky Mountain Region of the continental U.S., with an Oct. 30, 2020, performance completion date. Using customer is Defense Logistics Agency Energy. Type of appropriation is fiscal 2019 defense working capital funds. The contracting activity is the Defense Logistics Agency Energy, Fort Belvoir, Virginia. Petro Star Inc.,* Anchorage, Alaska, has been awarded a maximum $52,630,968 fixed-price with economic-price-adjustment, indefinite-delivery/indefinite-quantity contract for JA1 jet fuel. This was a sole-source acquisition using justification 10 U.S. Code 2304 (c)(1), as stated in Federal Acquisition Regulation 6.302-1. This is a one-year contract with a 30-day carryover. Location of performance is Alaska, with an Oct. 30, 2020, performance completion date. Using customer is Air Force. Type of appropriation is fiscal 2019 defense working capital funds. The contracting activity is the Defense Logistics Agency Energy, Fort Belvoir, Virginia (SPE602-19-D-0517). Sysco Raleigh LLC, Selma, North Carolina, has been awarded a maximum $49,019,871 fixed-price with economic-price-adjustment, indefinite-quantity contract for full line food distribution. This was a sole-source acquisition using justification 10 U.S. Code 2304 (c)(1), as stated in Federal Acquisition Regulation 6.302-1. This is a 286-day contract with no option periods. Location of performance is North Carolina, with a May 16, 2020, performance completion date. Using customers are Army, Navy, Air Force, Marine Corps and federal civilian agencies. Type of appropriation is fiscal 2019 defense working capital funds. The contracting agency is the Defense Logistics Agency Troop Support, Philadelphia, Pennsylvania (SPE300-19-D-3230). Oshkosh Defense LLC, Oshkosh, Wisconsin, has been awarded a maximum $27,537,300 firm-fixed-price requirements contract for pneumatic tire wheel assemblies. This was a sole-source acquisition using justification 10 U.S. Code 2304 (c)(1), as stated in Federal Acquisition Regulation 6.302-1. This is a three-year contract with no option periods. Locations of performance are Wisconsin and New Jersey, with a July 29, 2022, performance completion date. Using military service is Army. Type of appropriation is fiscal 2019 through 2022 Army working capital funds. The contracting activity is the Defense Logistics Agency Land and Maritime, Warren, Michigan (SPRDL1-19-D-0130). (Awarded July 30, 2019) U.S. TRANSPORTATION COMMAND Crowley Logistics Inc., Jacksonville, Florida, has been awarded a contract modification, P00009, on contract HTC711-17-D-R003 in the estimated amount of $328,000,000. This modification provides continued surface transportation coordination services for the movement of freight within the continental U.S. and Canada under the Department of Defense Freight Transportation Services program to the Defense Logistics Agency and Defense Contract Management Agency. Work will be performed in the continental U.S. and in Canada. The period of performance is from Aug. 1, 2019, to July 31, 2020. Fiscal 2019 transportation working capital funds were obligated at award. This modification brings the total cumulative face value of the contract from $110,285,829 to $438,285,829. U.S. Transportation Command, Directorate of Acquisition, Scott Air Force Base, Illinois, is the contracting activity. AIR FORCE Raytheon Co., Woburn, Massachusetts, has been awarded a $36,250,251, firm-fixed-price contract modification (P00014) to previously awarded contract FA8730-17-C-0010 for the Qatar Early Warning Radar (QEWR). This modification is for procurement and storage of obsolescent spares in support of QEWR sustainment. The modification brings the total cumulative face value of the contract to $1,094,776,076. Work will be performed in Woburn, Massachusetts, and is expected to be completed by August 2023. This modification involves 100% foreign military sales to the country of Qatar. Foreign Military Sales funds in the amount of $36,250,251 are being obligated at the time of award. The Air Force Life Cycle Management Center, Hanscom Air Force Base, Massachusetts, is the contracting activity. Summers Concrete Contracting Inc., Hahira, Georgia, has been awarded a ceiling $25,000,000 indefinite-delivery/indefinite-quantity contract for repair airfield pavements. This contract provides for repair or alteration of airport runways and taxiways construction requirements. Work will be performed at Moody Air Force Base, Valdosta, Georgia; and Sebring, Florida, and is expected to be completed by July 31, 2024. This award is the result of a competitive acquisition with three offers received. No funds are being obligated at the time of award. The 23d Contracting Squadron, Moody Air Force Base, Georgia, is the contracting activity (FA4830-19-D-A001). Verdis-Takisaki JV, Coeur d'Alene, Idaho (FA4620-19-D-A007); National Native American Construction Inc., Coeur d'Alene, Idaho (FA4620-19-D-A010); Global-Northcon JV, Hayden, Idaho (FA4620-19-D-A011); and Imperial Construction NW LLC, Wapato, Washington (FA4620-19-D-A012), have been awarded a combined, not-to-exceed $23,000,000 indefinite-quantity multiple award task order contract for design-build construction efforts. Work will be performed at Fairchild Air Force Base, Washington, and is to be expected to be complete by July 31, 2024. These awards are the result of a competitive acquisition and eight offers were received. Fiscal 2019 operation and maintenance funds in the amount of $500 are being obligated to each company at the time of award. The 92d Contracting Squadron, Fairchild Air Force Base, Washington, is the contracting activity. L3 Technologies Inc., Link Training & Simulation Division, Arlington, Texas, has been awarded a $10,411,380 cost-plus-fixed-fee contract task order modification (P00011) to the previously awarded FA8621-19-6251 task order for F-16 aircraft simulator training program services. This contract modification will provide aircraft concurrency requirements for the M7.3 Operation Flight Plan to deliver medium and high-fidelity simulation capability to train pilots for the F-16 aircraft platform. The modification brings the total cumulative face value of the contract to $28,440,800. Work will be performed at Arlington, Texas, and is expected to be completed by March 31, 2021. Fiscal 2019 research and development funds in the amount of $800,000 are being obligated at the time of award. The Air Force Life Cycle Management Center, Wright-Patterson AFB, Ohio, is the contract activity. University of Dayton Research Institute, College Park, Dayton, Ohio, has been awarded a $9,800,000 cost-plus-fixed-fee, indefinite-delivery/indefinite-quantity contract. This contract provides enhancement and improvement to the non-destructive evaluation capabilities for aerospace structures and components. This contract promotes discovery and provides increased accuracy, precision, reliability and optimization of the material state awareness of aerospace materials. Work will be performed at Wright-Patterson Air Force Base, Ohio, and is expected to be completed by Aug. 3, 2026. This award is the result of a competitive acquisition and three offers were received. Fiscal 2019 research, development, test and evaluation funds in the amount of $304,000 will be obligated at the time of award via task order 0001. The Air Force Research Laboratory, Wright-Patterson Air Force Base, Ohio, is the contracting activity (FA8650-19-D-5230). ARMY Kinder Brothers Excavating Inc.,* Dexter, Missouri (W912EQ-19-D-0009); SYTE Corp.,* Chicago, Illinois (W912EQ-19-D-0007); Randy Kinder Excavating Inc.,* Dexter, Missouri (W912EQ-19-D-0008); and C&M Contractors Inc.,* Doniphan, Missouri (W912EQ-19-D-0006), will compete for each order of the $50,000,000 firm-fixed-price contract for all plant, labor, materials and equipment for construction of relief wells, repairs to existing relief wells and construction of earthen berms. Bids were solicited via the internet with four received. Work locations and funding will be determined with each order, with an estimated completion date of Aug. 20, 2024. U.S. Army Corps of Engineers, Memphis, Tennessee, is the contracting activity. Sehlke Consulting LLC,* Arlington, Virginia, was awarded a $9,999,500 order-dependent contract for financial management support services. Bids were solicited via the internet with one received. Work locations and funding will be determined with each order, with an estimated completion date of Aug. 9, 2024. U.S. Army Contracting Command, Aberdeen Proving Ground, Maryland, is the contracting activity (W91CRB-19-A-0001). P&S Construction Inc.,* North Chelmsford, Massachusetts, was awarded a $9,457,700 firm-fixed-price contract for construction of a small arms range at Westover Air Reserve Base, Massachusetts. Bids were solicited via the internet with two received. Work will be performed in Westover, Massachusetts, with an estimated completion date of Dec. 9, 2020. Fiscal 2016, 2017 and 2018 military construction funds in the amount of $9,457,700 were obligated at the time of the award. U.S. Army Corps of Engineers, Louisville, Kentucky, is the contracting activity (W912QR-19-C-0020). Nisou LGC JV LLC,* Detroit, Michigan, was awarded an $8,945,520 firm-fixed-price contract for construction of the aerial port facility at Grissom Air Reserve Base, Indiana. Bids were solicited via the internet with two received. Work will be performed in Grissom, Indiana, with an estimated completion date of Oct. 12, 2020. Fiscal 2015, 2017 and 2019 military construction funds in the amount of $8,945,520 were obligated at the time of the award. U.S. Army Corps of Engineers, Louisville, Kentucky, is the contracting activity (W912QR-19-C-0026). Navistar Defense LLC, Lisle, Illinois, was awarded a $7,766,045 firm-fixed-price contract for 4x4 cargo trucks, 6x6 general transport truck, 6x6 30 ton recovery wrecker and medium tactical vehicles general transport truck spares. Bids were solicited via the internet with one received. Work will be performed in Lisle, Illinois, with an estimated completion date of Sept. 27, 2020. Fiscal 2019 operations and maintenance, Army funds in the amount of $7,766,045 were obligated at the time of the award. U.S. Army Contracting Command, Warren, Michigan, is the contracting activity (W56HZV-19-F-0455). NAVY Lockheed Martin, Mission Systems and Training, Baltimore, Maryland, is awarded $18,849,765 for cost-plus award-fee order N62786-19-F-0055 against the previously awarded basic ordering agreement N00024-15-G-2303 to provide engineering and management services for LCS-15 post shakedown availability. Lockheed Martin will provide support of the following: 62,462 man-hours level of effort; and to provide the work specification, pre-fabrication and material. Work will be performed in Moorestown, New Jersey (37%); Mayport, Florida (35%); Hampton, Virginia (14%); and Washington, District of Colombia (14%), and is expected to be complete by January 2021. Fiscal 2013 and 2019 shipbuilding and conversion (Navy); and fiscal 2019 other procurement (Navy) funding in the amount of $13,631,677 will be obligated at time of award and will not expire at the end of the current fiscal year. The Supervisor of Shipbuilding, Conversion and Repair, Bath, Maine, is the contracting activity. BAE Systems Land & Armaments LP, Minneapolis, Minnesota, is awarded an $8,411,293 cost-plus-fixed-fee delivery order for MK38 Gun Weapon System Repair Program support. This contract action is for labor, material and services required to support the Gun Weapon System Repair Program in pre/post testing, removal/installation, refurbishment, fleet technical assistance, maintenance, training and fleet modernization of MK 38 machine gun system. Work will be performed in Norfolk, Virginia (29%); San Diego, California (27%); Yokosuka, Japan (16%); Manama, Bahrain (7%); Rota Spain (7%); Everett, Washington (4%); Tacoma, Washington (4%); Pearl Harbor, Hawaii (4%); and Pascagoula, Mississippi (2%), and is expected to be complete by September 2021. Fiscal 2019 operations and maintenance (Navy); and fiscal 2019 weapons procurement (Navy and Coast Guard) in the amount of $1,050,000 will be obligated at the time of award, and $750,000 will expire at the end of the current fiscal year. This delivery order was solicited as a sole source under basic ordering agreement N00174-18-G-0001 in accordance with 10 U.S. Code 2304(c)(1). The Naval Surface Warfare Center, Indian Head, Explosive Ordnance Disposal Technology Division, Indian Head, Maryland, is the contracting activity (N00174-19-F-0420). Leidos Innovations Corp, Gaithersburg, Maryland, is awarded an $8,208,133 performance-based, indefinite-delivery/indefinite-quantity, firm-fixed-price contract for Micro-processor En-route Automated Radar Tracking System (MEARTS). The contract is for the acquisition of hardware, software, logistics and on-call help desk support for MEARTS. The contract includes a single five-year ordering period and one six-month option to extend services in accordance with Federal Acquisition Regulations (FAR) Clause 52.217-8. The option period, if exercised, would bring the cumulative value of this contract to an estimated $8,737,303. Work will be performed in Charleston, South Carolina, and is expected to be completed by January 2025. An order utilizing fiscal 2019 operations and maintenance (Navy) funds in the amount of $605,690 will be obligated at time of award. Contract funds will expire at the end of the current fiscal year. This requirement was not competitively procured because it is a sole-source acquisition pursuant to the authority of 10 U.S. Code 2304(c)(1) only one Responsible Source FAR Subpart 6.302-1). Naval Information Warfare Center Atlantic, Charleston, South Carolina, is the contracting activity (N65236-19-D-1001). EFW Inc., Fort Worth, Texas, is awarded $7,228,544 for firm-fixed-price delivery order N68335-19-F-0006 against a previously issued basic ordering agreement (N00019-17-G-0014). This delivery order procures 15 Fast Characterization Tools, 15 Helmet Kit Modification Fixtures, 15 Ready Room Testers and 20 Night Vision Goggle Modification Kits for the V-22 Color Helmet Mounted Display System. In addition, this delivery order provides drawing packages and the upgrade of five Fast Characterization Tools. Work will be performed in Haifa, Israel (70%); and Fort Worth, Texas (30%), and is expected to be completed in October 2020. Fiscal 2017 aircraft procurement (Air Force); and fiscal 2019 procurement defense-wide funds in the amount of $7,228,544 will be obligated at time of award, $3,496,053 of which will expire at the end of the current fiscal year. The Naval Air Warfare Center Aircraft Division, Lakehurst, New Jersey, is the contracting activity. DEFENSE INTELLIGENCE AGENCY CoSolutions EIS JV LLC,* Sterling, Virginia, was awarded a labor hour contract (HMM402-19-F-0098) with an estimated total value of $10,000,148 to support intelligence training in Europe. Work will be performed at the Regional Joint Intelligence Training Facility at RAF Molesworth, United Kingdom; Patch Barracks, Stuttgart, Germany; and, on a temporary duty basis, at other locations in Europe and within the continental U.S. The expected completion date is July 31, 2024, if all options are exercised. Fiscal 2019 operations and maintenance funds in the amount of $1,713,015 are being obligated at time of award. This contract was solicited through a small business set aside and one offer was received. The Virginia Contracting Activity, Washington, District of Columbia, is the contracting activity. *Small Business https://dod.defense.gov/News/Contracts/Contract-View/Article/1923647/source/GovDelivery/

  • Department of Defense Selected Acquisition Reports (SARs) - December 2018

    2 août 2019 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité

    Department of Defense Selected Acquisition Reports (SARs) - December 2018

    The Department of Defense (DoD) has released details on major defense acquisition program cost, schedule, and performance changes since the December 2018 reporting period. This information is based on the comprehensive annual Selected Acquisition Reports (SARs) for the first quarter of FY 2019, as updated by the President's Fiscal Year (FY) 2020 budget submitted to Congress on March 11, 2019. SARs summarize the latest estimates of cost, schedule, and performance status. These reports are prepared annually in conjunction with submission of the President's Budget. Subsequent quarterly exception reports are required only for those programs experiencing unit cost increases of at least 15 percent or schedule delays of at least six months. Quarterly SARs are also submitted for initial reports, final reports, and for programs that are rebaselined at major milestone decisions. The total program acquisition cost estimates provided in the SARs include research and development, procurement, military construction, and acquisition-related operations and maintenance. These totals reflect actual costs to date as well as future anticipated costs. All estimates are shown in fully inflated then-year dollars. The prior current estimate of program acquisition costs for programs covered by SARs for the reporting period for December 2017 (83 programs) was $1,917,840 million. The current estimate for December 2018 (87 programs) is $2,018,684 million. Quantity changes account for the majority of the $101,000 million increase (+$51,000 million), in addition to scope changes (+$18,000 million) and revised indices (+$11,500 million). 16 of the 20 programs with quantity changes are either equal to or underrunning their current baseline costs, as well as 60 of the 84* SARs reporting Unit Cost this SAR cycle overall. To view the full news release and SAR Summary Tables, click here. https://dod.defense.gov/News/News-Releases/News-Release-View/Article/1923492/department-of-defense-selected-acquisition-reports-sars-december-2018/source/GovDelivery/

Partagé par les membres

  • Partager une nouvelle avec la communauté

    C'est très simple, il suffit de copier/coller le lien dans le champ ci-dessous.

Abonnez-vous à l'infolettre

pour ne manquer aucune nouvelle de l'industrie

Vous pourrez personnaliser vos abonnements dans le courriel de confirmation.