27 août 2020 | International, Aérospatial, C4ISR

Yahsat Boosts Thuraya's Next Generation Capabilities With A Commitment Of Over US$500 Million

ABU DHABI, UAE and TOULOUSE, France, Aug. 27, 2020 /CNW/ -- Airbus has been selected by Al Yah Satellite Communications Company (Yahsat), the UAE's leading global satellite operator, to build Thuraya 4-NGS, the next generation mobile telecommunications system that will drive the continued advancement of Thuraya's L-band business. Thuraya 4-NGS will deliver higher capabilities and flexibility while increasing capacity and coverage across Europe, Africa, Central Asia and the Middle East, enabling next generation mobility solutions for all customer segments, including defense, government and enterprise.

Thuraya 4-NGS (Next Generation System)

Yahsat Logo

Airbus Logo

Thuraya 4-NGS (Next Generation System)Yahsat LogoAirbus Logo

This is a major milestone in Yahsat's commitment towards transforming Thuraya and rolling out its next-generation system, which entails a complete overhaul of its space and ground platforms, enabling a new set of services, products and solutions, across a greater coverage area. The new capabilities will drive leadership across many strategic product lines, such as maritime, IoT, and data solutions offering a wide spectrum of throughput capabilities and the highest speeds available in the market, while reinforcing Thuraya's strengths in the MSS voice market.

Thuraya's next generation system will provide a world of opportunities to customers, service partners, hardware manufacturers and integrators, enhancing user experience across land, sea and air to support multiple customer segments, including government, consumer and enterprise.

Furthermore, an advanced portfolio of solutions to support government and defense users will accelerate Thuraya's leadership in this market, both within the UAE, regionally and globally. Meanwhile, all existing products and services will continue to be supported by Thuraya's space and ground segments, enabling service continuity during and after the transformation programme.

This latest commitment from Yahsat takes its total committed investment to date to well over US$500 million, and more is anticipated in the coming years, including an option with Airbus to build Thuraya 5-NGS (an additional satellite identical to Thuraya 4-NGS), strengthening its coverage and capabilities across the Asia Pacific region.

Khaled Al Qubaisi, Chairman of Yahsat's Board of Directors and CEO of Mubadala's Aerospace, Renewables & ICT stated, "The half a billion US dollar commitment, underscores our position as a market leader, pioneer and disruptor. We are creating a multipurpose and flexible satellite ecosystem that is attuned for growth and future diversification and Thuraya 4-NGS is a key milestone in our ongoing mission to provide advanced yet affordable satellite solutions with levels of performance, reliability and security at the leading edge of today's technology."

Ali Al Hashemi, CEO of Thuraya and General Manager of Yahsat Government Solutions (YGS) continued, "Thuraya 4-NGS represents a significant evolution of our L-band capabilities, enabling a wider range of interoperable FSS/MSS solutions for Thuraya and YGS customers. This will be critical in delivering superior defense solutions, such as battlefield communications, to our government users, while offering a complete MSS portfolio to all of our current and future customers and partners to drive the next phase of innovation and growth."

Jean-Marc Nasr, Head of Airbus Space Systems said, "Building on a relationship with Yahsat that dates back more than 10 years, our selection is testament to the innovation and engineering excellence of Airbus' geostationary satellites. Thuraya 4-NGS, as well as being electric, will also benefit from our latest processed payload technology giving increased flexibility and adaptability over the course of its life in orbit. Yahsat's new project reinforces Airbus Defence and Space's position as the world's number one in electric propulsion satellites."

Based on the state-of-the-art all-electric Airbus Eurostar Neo Platform, Thuraya 4-NGS will incorporate a large 12-metre L-band antenna and a payload with on-board processing providing advanced routing flexibility of up to 3200 channels with dynamic power allocation over a large number of spot beams. It is scheduled for operation in 2024.

Photo - https://mma.prnewswire.com/media/1225048/Thuraya_Telecommunications_Company.jpg
Logo - https://mma.prnewswire.com/media/1225075/Thuraya_Logo.jpg
Logo - https://mma.prnewswire.com/media/1225047/Yahsat_Logo.jpg
Logo - https://mma.prnewswire.com/media/1225046/Airbus_Logo.jpg

SOURCE Thuraya Telecommunications Company

https://www.newswire.ca/news-releases/yahsat-boosts-thuraya-s-next-generation-capabilities-with-a-commitment-of-over-us-500-million-855138288.html

Sur le même sujet

  • Industry protest ensnares Germany’s multibillion-dollar combat ship

    22 janvier 2020 | International, Naval

    Industry protest ensnares Germany’s multibillion-dollar combat ship

    By: Sebastian Sprenger COLOGNE, Germany — The losing bidder for Germany's MKS 180 large-frigate program has filed a protest against the government's pick of Dutch shipyard Damen for the $6.7 billion job. German Naval Yards, based in Kiel, Germany, on Monday said it had “serious doubts about the legality of the decision” and would “exhaust all legal possibilities at our disposal” to have the decision overturned. The Defence Ministry announced Jan. 13 it selected Damen to build an initial four copies of the new multipurpose combat ships. The pick capped a source-selection process that had become controversial because the government decided to compete the project throughout the European Union. The strategy followed the bloc's principle of a unified market, but it left the domestic shipbuilding lobby miffed. The protest by German Naval Yards and its bid partner ThyssenKrupp Marine Systems kicks off a dispute process that begins with the Defence Ministry reviewing the complaint and then, if it remains unresolved, could wind its way through the German court system. There is no telling how long the process will take — some protests get resolved within weeks, but the process can take a year or longer. The Defence Ministry is expected to offer an indication later this month on whether its attorneys believe the Damen pick can withstand legal scrutiny. Damen has said it wants to build the ships at the shipyards of its German bid partner Lürssen, vowing to invest 80 percent of the contract's value in Germany. The protest comes at a time when Berlin is adopting a new policy that grants an exception to the EU competition mandate when national security is at stake. Specifically, the construction of surface warships would be designated as a “key technology area” so worthy of protection that future programs would be automatically awarded to German manufacturers. For that to be the case, however, two political initiatives have yet to play out: The German parliament must approve a revision of national source-selection rules from October 2019, which formally enable EU acquisition exceptions on national security grounds. In addition, the Cabinet has to greenlight a draft strategy document on nurturing domestic security- and defense-related industries, currently in interagency review, that confers the rank of “key technology area” to naval surface combatants. The strategy document, overseen by the Federal Ministry for Economic Affairs and Energy, is expected to be ready for Cabinet consideration within weeks, as Defense News reported last week. Legal experts said the “key technology” debate has no immediate bearing on the German Naval Yards protest. At the same time, it is possible that the complaint's resolution, whichever way it goes, will come at a time when a domestic award preference for similar contracts is already in effect. https://www.defensenews.com/global/europe/2020/01/21/industry-protest-ensnares-germanys-multibillion-dollar-combat-ship/

  • UK Ministry of Defence awards $21M to support Common Missile Warning System

    6 avril 2021 | International, Aérospatial

    UK Ministry of Defence awards $21M to support Common Missile Warning System

    This contract ensures the continued support and sustainment of CMWS systems on various UK aircraft platforms. The award includes annual repair and engineering services.

  • White House asks for $11 billion more for Navy, Marine Corps spending

    13 mars 2023 | International, Naval

    White House asks for $11 billion more for Navy, Marine Corps spending

    Documents published by OMB offer an early look at the services' budget requests ahead of the Pentagon's rollout next week.

Toutes les nouvelles