29 octobre 2020 | International, Terrestre

US Army gets first Infantry Squad Vehicle from GM Defense

UPDATE This story has been updated to correct the location for ISV production in North Carolina. A GM Defense representative previously misspoke.

WASHINGTON — GM Defense delivered its first Infantry Squad Vehicle to the U.S. Army in an Oct. 27 ceremony at its proving grounds and production facility in Milford, Michigan, just 120 days after being chosen to build the new troop carrier.

The Army awarded the company a $214.3 million contract to produce 649 vehicles by the end of fiscal 2024. The service is planning to procure a total of 2,065 ISVs.

Designed to carry a nine-soldier squad, the ISV was specifically put together to be light enough to be sling loaded from a UH-60 Black Hawk and small enough to fit inside a CH-47 Chinook, to provide maximum flexibility for deployment.

GM's design is based off the company's 2020 Chevrolet Colorado ZR2 midsize truck and uses 90 percent commercial parts including a 186-horsepower, 2.8L Duramax turbo-diesel engine and performance race components. It also features a custom rollover protection system.

While the first low-rate initial production vehicles — 27 in total — will be built in Michigan, GM has a long-term plan to move its ISV manufacturing to Concord, North Carolina, where it is standing up a facility to manage its higher volume ISV production.

The Army first identified a need for a light infantry vehicle in 2015 when its most recent combat vehicle strategy was released, but nothing materialized until Congress forced the Army to launch the competition as part of the FY18 National Defense Authorization Act. The Army awarded $1 million contracts to three teams in August 2019 to develop offerings — GM Defense, a team of Oshkosh Defense and Flyer Defense LLC and an SAIC and Polaris team.

“One hundred and twenty days from contract award to delivery is a significant milestone, and I am very proud of the team for this accomplishment,” David Albritton, president of GM Defense, said in a statement. “We're leveraging General Motors' engineering prowess and immense manufacturing capabilities to bring transformative solutions to the military vehicle market. Our initial success with the ISV shows our commitment to our customer and highlights our unique right to win in the military mobility market.”

GM Defense has a “very, very talented team," Albritton said during the ceremony, and “their innovation, attention to detail, flexibility when incorporating soldier feedback during testing and a magnitude of other factors helped us to win this ISV contract and gives me great hope for how we will tackle other pursuits in the future.”

The first vehicles will be going to the 1st Infantry Brigade Combat Team of the 82nd Airborne Division, but ultimately 11 IBCTs will be outfitted with 59 vehicles each under the first contract covering the 649 ISVs.

The vehicles are slated to go through tests in the coming year, including further analysis of its air-deployable capability, as well as verification the maintenance manuals are complete. The first unit equipped will take the ISV through an initial operational test and evaluation.

With the success of the ISV, GM Defense is setting its sights on other opportunities with the Army and other military services.

“We have a strong interest in the Joint Light Tactical Vehicle Program,” Albritton said. The Army is planning to re-compete for the JLTV and for new Humvees to round out the tactical vehicle fleet.

“If you look at the size and scale of this program, obviously, this is closer to a commercial-size vehicle, but as you step up in class and step up in weight, we believe we have a right to win in vehicles sizes of that size,” he added.

“That doesn't limit us there, as well. There are only a few ground vehicle programs across the [Defense Department] right now, but we believe that other than doing a fully integrated vehicle like we do on ISV or what we potentially could do on JLTV in partnership with other companies, we can look at programs like the Advanced Reconnaissance Vehicle for the U.S. Marine Corps, or we can look at the Optionally Manned Fighting Vehicle," Albritton said. “But if you think about power and propulsion solutions, you think about light weighting, think about cybersecurity, there's other types of capabilities that we can apply in partnership on a variety of platforms as well.”

GM spent several recent years helping the Army evaluate a hydrogen fuel cell vehicle using a ZH2 Chevy Colorado and the Army is now taking some renewed steps at getting after an electric vehicles in its fleet to include the pursuit of an electric light reconnaissance vehicle.

https://www.defensenews.com/land/2020/10/27/us-army-gets-first-infantry-squad-vehicle-from-gm-defense/

Sur le même sujet

  • Australia officially announces $26B frigate contract. Here are the build details

    3 juillet 2018 | International, Naval

    Australia officially announces $26B frigate contract. Here are the build details

    By: Nigel Pittaway MELBOURNE, Australia ― Australia will acquire nine high-end anti-submarine warfare frigates from the end of the next decade under a deal with BAE Systems worth AU$35 billion (U.S. $26 billion). The announcement was formally made Friday at the ASC shipyard in Osborne, South Australia, by Prime Minister Malcolm Turnbull, Minister for Defence Marise Payne and Minister for Defence Industry Christopher Pyne. A version of BAE Systems' City-class Type 26 ASW frigate, now under construction for the British Royal Navy, will be acquired under Australia's SEA 5000 Phase 1 project, also known as the Future Frigate Project. Referred to as the Global Combat Ship―Australia, or GCS-A, during the competition, the design will be known as the Hunter-class in Royal Australian Navy service and will replace the Navy's existing Anzac-class frigates. There has been speculation in the media that the decision to go with BAE may be driven, in part, by Australia's desire to secure strong terms with the U.K. as it negotiates a series of new trade agreements after Britain leaves the European Union. Payne noted Friday that the GCS-A design was selected because it was the most capable ASW platform. “This is a decision entirely based on capability, the best capability to equip the Navy in anti-submarine warfare,” she said. Regardless, news of BAE's win was welcomed in the United Kingdom, with Secretary of State for Defence Gavin Williamson referring to it as the “biggest maritime defence deal of the decade.” “This £20 billion ‘deal of the decade' demonstrates how British defence plays a huge role in creating jobs and prosperity and is ‘Global Britain' in action,” he commented on social media. “Great to see our military and industrial links strengthen with Australia.” The ships will be built by ASC Shipbuilding in South Australia, using local workers and Australian steel, under the Turnbull government's continuous naval shipbuilding program. “What we are doing here is announcing our commitment to build the nine Future Frigates,” Prime Minister Turnbull said. “The Hunter-class frigates will be the most advanced anti-submarine warships in the world.” The Hunter-class frigates will be equipped with CEA Technologies-built CEAFAR phased array radar currently fitted to the Navy's post-anti-ship missile defense Anzac frigates, together with Lockheed Martin's Aegis combat system and an interface provided by Saab Australia. The Aegis combat system was mandated for all of Australia's major surface combatants by the Turnbull government in October 2017. The GCS-A design was selected in preference to Fincantieri's Australian FREMM, dubbed FREMM-A, a variant of the ASW-optimized FREMM frigate now in service with the Italian Navy; and the F-5000 from Navantia, based on an evolution of the Royal Australian Navy's Hobart-class air warfare destroyer, which in turn is a derivative of the Spanish Navy's F-100 Álvaro de Bazán class. An ASW capability was the highest priority for the Royal Australian Navy, according to Chief of Navy Vice Adm. Tim Barrett. “I spoke as recently as last night to the First Sea Lord, my equivalent in the [British] Royal Navy, and I am assured by his comments on just how successful this platform will be as the world's most advanced anti-submarine warfare frigate,” he said Friday. The first steel is due to be cut on prototyping activities for the build at Osborne in late 2020, with full production following in 2022. The first ship of the class will be delivered to the Royal Australian Navy in the late 2020s. Under the deal, the government-owned shipbuilder ASC will become a subsidiary of BAE Systems during the build, with the government retaining a sovereign share in the entity. The shipyard will revert to government ownership at the end of the project. Turnbull said the arrangement ensures BAE Systems is fully responsible and accountable for the delivery of the frigates, noting that Australia retains the intellectual property and a highly skilled workforce at the end of the program. “My expectation is that the next generation of frigates that comes after the ones we're about to start building at ASC will be designed and built in Australia,” he said. BAE System's global maritime systems business development director, Nigel Stewart, told Defense News that he welcomes the build strategy. “We were really pleased with that as an outcome because ASC has great capability. We always wanted to use the workforce, but this allows us to join ASC and BAE together much earlier, and we think that will be really positive,” he said. Stewart said the plan was for the Hunter-class build to follow the Type 26 activity in the U.K. by around five years, which will serve to de-risk the Australian program. BAE is due to deliver the first ship, HMS Glasgow, to the British Royal Navy in 2025, with entry into service in the 2027 time frame. “We cut steel for the first Type 26 in the U.K. in June 2017, and we'll cut steel for full production of the Hunter class in South Australia in 2022,” he said. “We'll run at an 18-month drumbeat in the U.K., and somewhere between 18 months and two years in Australia. That will keep a five-year gap, which is almost perfect. You are de-risking the Australian program in the U.K. and you don't get the obsolescence issues you would if there was a longer gap, so it's a really good program overlap.” In other news Friday, the Turnbull government announced it will set up a AU$670 million training and capability center for the Hunter-class frigates in Western Australia. Known as Ship Zero, the initiative will be established at HMAS Stirling, the Navy's Fleet Base West, at the shipbuilding facility in Henderson. Much of the training traditionally performed at sea will be transferred into the land-based facility. The capital works project will be considered by the Australian Parliament early next year, and construction is expected to commence in 2019. https://www.defensenews.com/naval/2018/06/29/australia-officially-announces-26b-frigate-contract-here-are-the-build-details/

  • Pentagon creates regional partnerships to sustain gear far from home

    23 juillet 2024 | International, Terrestre

    Pentagon creates regional partnerships to sustain gear far from home

    The Pentagon has signed off on a regional sustainment framework to maintain equipment forward in theaters around the world, starting with the Indo-Pacific.

  • US Army’s tactical network team looks to satellites for next iteration of tools

    4 septembre 2020 | International, C4ISR

    US Army’s tactical network team looks to satellites for next iteration of tools

    Andrew Eversden WASHINGTON — The U.S. Army's tactical network modernization team is considering using satellite communications as a service capability for the next iteration of new network tools set for delivery in fiscal 2023. The Army's Network Cross-Functional Team as well as Program Executive Office Command, Control, Communications-Tactical held a technical exchange meeting Sept. 2 to discuss with industry focus areas and goals for Capability Set '23, the next round of new network tools the Army plans to deliver to soldiers every two years. Col. Shane Taylor, program manager for the tactical network at PEO C3T, outlined several priority areas for his program office, including a satellite-as-a-service need that he said provides a “wide gamut of opportunity.” “The opportunity there is it could be anywhere from just leasing terminals to a cradle to [a] grave solution where we just say: 'All right, industry, if I need this capability in this location, what would that look like?' And so the challenge really in the near term is it's such a wide opportunity,” Taylor said. “There's a lot of work that you'll see us ask for some assistance going forward on that.” While Capability Set '21 centered on delivering technology to soldiers to address immediate network gaps, Capability Set '23 is working to increase capacity, bandwidth and resiliency of the Army's tactical network. Satellite communications is critical to that effort, Taylor said. “I'll keep hearkening back to resiliency, thickening, multi-path. SATCOM as a service also has a huge play in that role, and what I mean by that is it gives us just another opportunity to provide capability to the war fighter,” Taylor said. Brig. Gen. Rob Collins, head of PEO C3T, said at the meeting that satellites will be a major focus for cooperative research and development agreements with Combat Capabilities Development Command's C5ISR Center — or Command, Control, Communication, Computers, Cyber, Intelligence, Surveillance, and Reconnaissance Center. The Army is interested in the networking capabilities that satellites can provide. Collins said in August that the service expects low- and medium-Earth orbit satellites to reach technical maturity in 2025 or 2027. While the Army's tactical network team is exploring LEO and MEO capabilities, Taylor assured industry that traditional geosynchronous systems will still have a role to play. “I think they all have a role,” Taylor said. “But where we need industry's help is getting after the ability to leverage each of those capabilities without having to leverage three different types of systems.” Preliminary design review for Capability Set '23 is scheduled for April next year, with critical design review one year after that. Taylor said his team is also focusing on scalable and multi-band antennas so soldiers don't have to change out “feed horns” to change bands. The team also wants to automate the primary, alternate, contingency and emergency, or PACE, decision-making process based on network quality, metrics and availability, Taylor said. Project Manager Tactical Network is focusing on next-generation line-of-sight and beyond-line-of-sight communications capabilities as part of a pushing by PEO C3T is to improve low-probability intercept/low-probability detect for Capability Set '23. Additionally, Taylor said his team will “always” be looking for industry's help reducing cost, size, weight and power for the baseband. Taylor's program is also looking for solutions to system provisioning for the next iteration of network tools. “The initialization of the routers and switch[ing] the firewall [configurations] and then how we automate that process and move that out across the network continues to be a challenge.” https://www.c4isrnet.com/battlefield-tech/it-networks/2020/09/03/us-armys-tactical-network-team-looks-to-satellites-for-next-iteration-of-tools/

Toutes les nouvelles