12 août 2023 | International, Aérospatial, Sécurité

Ukraine war driving US Army electronic warfare development, Bush says

The Terrestrial Layer System-Brigade Combat Team and -Echelons Above Brigade are both “on track, and I feel good about them,” said Doug Bush.

https://www.c4isrnet.com/electronic-warfare/2023/08/11/ukraine-war-driving-us-army-electronic-warfare-development-bush-says/

Sur le même sujet

  • Peraton to acquire SATCOM for US Africa Command

    4 mars 2020 | International, C4ISR

    Peraton to acquire SATCOM for US Africa Command

    By: Nathan Strout Peraton will receive $219 million to provide satellite communications fpr US Africa Command, the company announced. Mar. 3. Under the five-year contract, Peraton will be expected to rapidly acquire commercial satellite services to meet the needs of AFRICOM and its mission partners in the region. The company will utilize communications services from multiple satellite communications companies. “As an independent service integrator, Peraton takes a neutral, vendor-agnostic approach to leverage the best technologies available from across the entire commercial satellite industry,” said David Myers, president of Peraton Communications sector, in a statement. “As a result, customers like AFRICOM are assured a solution tailored to prioritize consistent mission performance, without being dependent on any particular satellite fleet or vendor assets.” Peraton has a longstanding relationship with AFRICOM, acting as a consultative mission partner to the command for more than 10 years and currently supporting it through other task orders. The contract was awarded via a blanket purchase agreement issued by Air Force Space Command in coordination with the Defense Information Systems Agency. The task order is the first of its kind to be awarded under the Future Commercial SATCOM Acquisition program. https://www.c4isrnet.com/battlefield-tech/c2-comms/2020/03/03/peraton-to-acquire-satcom-for-us-africa-command

  • Foreign debuts, but few defence deals at Singapore air show

    24 février 2024 | International, Aérospatial

    Foreign debuts, but few defence deals at Singapore air show

  • F-35 Costs Drop for Building Jets But Rise for Operating Them

    29 mai 2020 | International, Aérospatial

    F-35 Costs Drop for Building Jets But Rise for Operating Them

    By Anthony Capaccio 29 mai 2020 à 04:00 UTC−4 The Pentagon's costliest program, Lockheed Martin Corp.'s F-35, is starting to look a little less expensive, with the latest estimate for development and procurement down 7.1% to $397.8 billion. Less encouraging for the lawmakers who craft defense budgets and for taxpayers: Operating and maintaining the fleet for 66 years is projected to cost $1.182 trillion, a 7.8% increase over the estimate from the Pentagon's F-35 office last year, according to the Defense Department's annual assessment of the jet obtained by Bloomberg News. The lower acquisition estimate produced by the F-35 program office is the latest in a string of good news that also includes improved on-time delivery of aircraft, the elimination of all flaws that were considered life-threatening to pilots and a steady reduction since 2018 in the number of potentially mission-crippling software deficiencies. The Selected Acquisition Report, which hasn't been released to the public, also said the F-35 program anticipates sales over time of 809 aircraft to international partners, up from the 764 projected last year. Cumulatively, the improvements might protect the F-35 from pressure to cut defense budgets as the federal deficit balloons due to spending for the Covid-19 pandemic. The Pentagon is already projecting mostly flat budgets through 2025. Even under the current budget forecast, the Pentagon report discloses that previous plans to buy 94 F-35s in fiscal 2022 will be reduced by nine. The blueprint then calls for buying 94 each year in fiscal 2023 and 2024 and 96 in fiscal 2025. Those are up from the 79 requested for fiscal 2021. The report was prepared in December before the coronavirus pandemic crippled the global economy. Lockheed announced last week that Covid-19 impacts will temporarily slow F-35 production because of subcontractor parts delays and that the Bethesda, Maryland-based company might fail to deliver as many as 24 of a planned 141 jets this year. Earlier: Lockheed Slows F-35 Production on Covid-Related Parts Delays More than 500 of a potential 3,200 F-35s for the U.S. and allies already have been delivered and will have to be retrofitted as flaws are fixed, at a cost of as much as $1.4 billion. The F-35 is in the final stages of intense combat testing to demonstrate it's effective against the most advanced Russian, Chinese and Iranian threats. Lockheed spokesman Brett Ashworth said the report “highlights our ability to work with our partners to produce the world's most advanced fighter at the cost of legacy aircraft” the F-35 is intended to replace. Brandi Schiff, a spokeswoman for the Pentagon's F-35 program office, declined to comment on the report before its release. The Pentagon assessment says that updating its numbers based on actual production performance data by Lockheed and its subcontractors, rather than projections, resulted in the reduction in acquisition cost estimates. For example, the “unit flyaway cost” of an F-35 for the Air Force's version of the fighter, not including the engine, declined by $12.1 million to $57.4 million. The Air Force plans to purchase 1,763 jets, the most of the U.S.'s planned 2,456 aircraft. The Marine Corps version dropped to $72.1 million from $80 million, and the Navy model fell to $72.3 million from $79.5 million. None of that resolves the projected long-term trillion-dollar burden of operating and sustaining the fleet through 2077. Outlining the stakes, then-acting Defense Secretary Patrick Shanahan said in March 2019 that “this is the largest program in DoD history and the cost of sustainment is about the same cost as nuclear modernization.” In the new report the F-35 program office said that it “remains committed to and continues pursuing multiple efforts to drive down” those costs. https://www.bloomberg.com/news/articles/2020-05-29/f-35-costs-drop-for-building-jets-but-rise-for-operating-them

Toutes les nouvelles