18 septembre 2017 | Local, C4ISR

Rock Networks Acquires Nova Communications as a Platform for National Growth

Rock Networks announces the acquisition of Nova Communications (Nova), a leader in the wireless system integration and two-way radio industry.

Headquartered in the nation's capital, we partner with Harris Corporation and Tait Communications to provide solutions in the areas of two-way radio infrastructure and antenna systems.

https://globenewswire.com/news-release/2017/09/18/1124361/0/en/Rock-Networks-Acquires-Nova-Communications-as-a-Platform-for-National-Growth.html

Sur le même sujet

  • La Marine royale canadienne met en service le NCSM Margaret Brooke

    26 octobre 2022 | Local, Naval

    La Marine royale canadienne met en service le NCSM Margaret Brooke

    26 octobre 2022 – Halifax (N.-É.) – Ministère de la Défense nationale / Forces armées canadiennes Les médias sont invités à assister à la cérémonie de mise en service du Navire canadien de Sa Majesté (NCSM) Margaret Brooke à Halifax, en Nouvelle-Écosse, le 28 octobre. Cette activité constitue la mise en service officielle dans la Marine du NCSM Margaret Brooke, le deuxième navire de patrouille extracôtier et de l'Arctique remis dans le cadre de la Stratégie nationale de construction navale. DATE : Vendredi 28 octobre 2022 à 13 h (Atlantique) LIEU : Jetée NJ, arsenal CSM, Halifax (N.-É.) ACTIVITÉ : Des dirigeants militaires et des dignitaires civils mettront en service le NCSM Margaret Brooke dans la flotte de la MRC. La capitaine de frégate Nicole Robichaud, commandante, et les membres de l'équipage du navire seront accessibles pour des entrevues après la cérémonie. Notes pour le rédacteur en chef/chef des nouvelles : Tous les médias qui souhaitent assister à la cérémonie sont priés de communiquer avec le capitaine de corvette Brian Owens, officier supérieur des affaires publiques des Forces maritimes de l'Atlantique, au 902-401-5529, ou par courriel à brian.owens@forces.gc.ca. Les médias sont priés d'arriver à l'entrée Admiral's, à l'arsenal CSM, avec d'une pièce d'identité avec photo, au plus tard à 12 h 30 (Atlantique), où ils seront accueillis et escortés jusqu'au site pour couvrir l'activité. La cérémonie sera aussi diffusée en direct sur la page Facebook de la Marine royale canadienne à l'adresse Facebook - Marine royale canadienne. https://www.canada.ca/fr/ministere-defense-nationale/nouvelles/2022/10/la-marine-royale-canadienne-met-en-service-le-ncsmmargaret-brooke.html

  • Eurosatory 2018: Rheinmetall Canada unveils production-ready Mission Master Cargo unmanned ground vehicle

    12 juin 2018 | Local, Terrestre

    Eurosatory 2018: Rheinmetall Canada unveils production-ready Mission Master Cargo unmanned ground vehicle

    Rheinmetall Canada has unveiled a newly named Mission Master Cargo unmanned ground vehicle (UGV), which is a new version of the Multi-Mission UGV that was first revealed at IDEX in February 2017. The platform is designed for direct support of dismounted troops and is available in a cargo and casualty evacuation version, and a surveillance and reconnaissance version. The new UGV was revealed during Eurosatory 2018 in Paris, and Rheinmetall Canada spoke to Jane's prior to the event. Modules can be swapped in and out as required, so the UGV can fulfil mission sets including logistics support; weaponised; chemical, biological, radiological, and nuclear and explosives (CBRNE); and communications relay. “The end user can buy either a surveillance module, CBRN module or fire suppression module and clip it onto the vehicle itself with no modification required. The software can integrate and interact with any of those mission modules that are already embedded into every single UGV,” Alain Tremblay, vice-president of business development for Rheinmetall Canada, told Jane's. In the weaponised role, the platform is fitted with a remote weapon station featuring a 12.7 mm machine gun. Live fire testing was done at the end of 2017 on a military base in Canada to trial how the UGV could lock onto a target, the target then be confirmed by operators, and the platform fire by itself up to a range of 800 m. Tremblay noted that any type of remote weapon station, regardless of the manufacturer, can be fitted to the platform. “The open architecture of the software allows anything to be mounted, even a Russian type missile which has a different architecture system to the western world,” he said. “Early next year we are going to be starting to work on a medium calibre 20 mm remote weapon station for the same platform which is actually not that difficult to do. http://www.janes.com/article/80789/eurosatory-2018-rheinmetall-canada-unveils-production-ready-mission-master-cargo-unmanned-ground-vehicle

  • Quebec's Davie shipyard wins $610M contract to convert icebreakers for coast guard

    13 août 2018 | Local, Naval

    Quebec's Davie shipyard wins $610M contract to convert icebreakers for coast guard

    Jean-Yves Duclos, who represents the Quebec City region made announcement Friday The federal government has signed a $610-million contract to acquire and convert three icebreakers to renew the Canadian Coast Guard's aging fleet. Federal Families, Children and Social Development Minister Jean-Yves Duclos, who represents the Quebec City region made the announcement at the Davie shipyard in Lévis, which will be doing the work. The coast guard fleet lacks the capacity to perform its icebreaking duties. The Canadian Coast Guard ship Terry Fox, launched in 1993, is the newest icebreaker in the fleet. The contract is expected to result in the creation of 200 new jobs over the next two years, according to Davie spokesperson Frédérik Boisvert. Last year, when Davie was working on conversion of the Asterix and finishing two ferries, Davie employed 1,500 workers, Boisvert said. Many of them were laid off once the projects were completed. In June, the Liberal government concluded a deal with Davie to purchase three icebreakers, but there was no price tag attached to the project at the time. Negotiations to acquire the vessels were launched in January after Prime Minister Justin Trudeau abruptly announced the plan in a Radio-Canada interview in Quebec City. That marked the beginning of a seven-month negotiating process between the government and Davie. Fraser noted that the usual time it takes to negotiate a shipbuilding contract with the government is eight years, praising the work of negotiators for the government and Davie. MacKinnon confirmed that Ottawa sped up the process for the icebreaker deal. Full Article: https://www.cbc.ca/news/canada/montreal/ottawa-will-allow-quebec-s-davie-shipyard-to-bid-on-national-shipbuilding-plan-contracts-1.4780836

Toutes les nouvelles