27 août 2019 | Local, Aérospatial

RCAF to get 2 more CH-149 Cormorants as part of fleet modernization

The Royal Canadian Air Force (RCAF) is to get at least two new Leonardo CH-149s as part of the Canadian government's $1.39 billion mid-life upgrade for its Cormorant fleet.

Announcing the move Aug. 22 in Comox, B.C., Defence Minister Harjit Sajjan said the upgrades to the existing fleet of 14 Cormorants, which are primarily used for search and rescue (SAR) operations, would extend their life to at least 2042.

The upgrade program will bring the Cormorants to the latest AW101-612 standard, currently being delivered to Norway to provide that country's new search and rescue fleet. The capability enhancements and equipment improvements in the upgrade include upgraded avionics in a new glass cockpit; new sensors, radar and search enhancement technology; more powerful digitally-controlled engines; wireless in-cabin communications; LED lighting; and rescue hoist upgrades.

“Canadians rely on the women and men of the Royal Canadian Air Force to conduct successful search and rescue operations in challenging circumstances,” said Sajjan. “These enhancements to the CH-149 Cormorant fleet will ensure that search and rescue crews have the right equipment to continue providing these life-saving services.”

The upgrade program also includes synthetic training solutions delivered by CAE, including Canada's first AW101 full motion simulator. Other companies working to deliver the upgrade include IMP Aerospace and Defence, GE Canada (which will provide the new engines), and Collins Aerospace (which will provide the new cockpit displays and avionics).

“Every year, the Royal Canadian Air Force flies about 1,000 missions in support of search and rescue, a core mission of the Canadian Armed Forces,” said LGen A.D. Meinzinger, commander of the Royal Canadian Air Force. “These upgrades to the CH-149 Cormorant, and an increase in fleet size ensures the RCAF will continue to deliver search and rescue services in the challenging Canadian environment.”

Canada's Cormorant fleet began service in 2000, and are currently based at 19 Wing Comox, B.C,; 9 Wing Gander, N.L.; and 14 Wing Greenwood, N.S. In 2005, CH-149s from the Trenton main operating base were redistributed to those three bases, but with the addition of at least two CH-149s to the fleet, the type will return to Trenton and replace Bell CH-146 Griffons in the SAR role.

Leonardo said the upgrade program will be delivered with “no interruption or reduction” in Canada's rotary search and rescue capabilities.

https://www.skiesmag.com/news/rcaf-to-get-2-more-ch-149-cormorants-as-part-of-fleet-modernization/

Sur le même sujet

  • Canada calls for improvements to ICAO's air accident investigation framework - Skies Mag

    6 avril 2022 | Local, Aérospatial, Sécurité

    Canada calls for improvements to ICAO's air accident investigation framework - Skies Mag

    Canada wants to ensure that future air accident investigations are credible and transparent, including in conflict-of-interest situations.

  • Marinvent Announces Successful Delivery to Government of Canada of its APM Product

    9 avril 2019 | Local, Aérospatial

    Marinvent Announces Successful Delivery to Government of Canada of its APM Product

    Montreal, Canada, April 2, 2019 – Marinvent is pleased to announce the successful delivery of its Airfoil Performance Monitor product (APM) to the Government of Canada following extensive independent flight testing by the National Research Council under the Build in Canada Innovation Program (BCIP). APM monitors and displays the margin to stall of an airfoil and detects the real-time effects of icing, contamination, and degradation on the lifting surface of any airfoil and in all phases of flight. The recently-concluded flight evaluations conducted independently by NRC-FRL conclusively demonstrated the following unique capabilities of APM: Provides stall warning and backup airspeed indications and is completely independent of all aircraft-side inputs except power. (it needs no airspeed, air data, angle-of-attack, or flap position inputs). Gives the correct stall warning margin, even with contaminated (iced or otherwise degraded) airfoils. Correctly detects compressibility stalls at high altitude. Provides tail stall warning which is particularly relevant to a number of UAV platforms. Provides correct diagnosis of contamination early during the takeoff roll (Air Florida Flight 90, Arrow Air, and Dryden, among others). Provides real-time data enabling significantly reduced fuel consumption and brake wear and enabling better predictive maintenance scheduling, helping to pay for itself by reducing aircraft operating costs. “APM is a mature product having been successfully tested on several Part 25 jet and turboprop aircraft, as well as numerous Part 23 light aircraft and business jets”, said Dr. John Maris, President of Marinvent. “It is available for installation today. The Canadian government is our first customer under the BCIP program, and we have also made our first forays into the UAV market, which desperately needs this technology particularly for Canadian winter operations”. Dr. Maris, whose doctoral thesis “AN ARCHIVAL ANALYSIS OF STALL WARNING SYSTEM EFFECTIVENESS DURING AIRBORNE ICING ENCOUNTERS” led to the final development of APM, has made his academic life's work the study of the relationship between aircrew and angle of attack/stall warning systems. He is one of the world's leading authorities on this subject, which is particularly pertinent currently, and is also a Transport Canada Test Pilot DAR. Dr. Maris is an Adjunct Professor at Concordia University in Montreal, Canada as well as being President of Marinvent Corporation and inventor of APM. In recognition of the potential impact of APM, SAE named APM as the 2017 Aerospace & Defense category winner in their Create the Future competition: https://contest.techbriefs.com/2017/entries/aerospace-and-defense/8422 About Marinvent – Marinvent is a privately held Canadian company, founded in 1983. Marinvent is headquartered on the outskirts of Montreal, the leading aerospace center in Canada and one of the largest aerospace centers in the world. Marinvent provides consulting, services, training, tools and IP to reduce customers' program/product risk, cost and schedule and to help them innovate quickly. Its engineers, experience, TCCA DARs, flying avionics test bed, research simulator and IP make it a reliable and trusted partner for the planning and management of projects, regardless of size and complexity. Marinvent's customers include aircraft OEMs, integrators, tier 1s, tier 2s and Government customers around the world. Marinvent prides itself of helping its customers bring their products to market and has a stellar track record of doing exactly that. As a result, Marinvent has won numerous awards in recognition of that fact. http://www.marinvent.com/wp-content/uploads/APM-First-Customer-April-2019.pdf

  • Ottawa’s legal bill nearly $12 million for warship work

    28 novembre 2018 | Local, Naval

    Ottawa’s legal bill nearly $12 million for warship work

    Andrea Gunn (agunn@herald.ca) The federal government has spent $11.8 million on legal fees relating to the Canadian Surface Combatant project over the past two years, some of that owing to a large number of amendments to the project's request for proposals. In an answer to a written question posed last month by a Calgary Conservative MP, Public Services and Procurement Canada confirmed that 88 amendments had been made between July 1, 2016, and Oct. 2, 2018 to the request for proposals for the massive, multibillion-dollar project that aims to replace the Royal Canadian Navy's fleet of frigates. The request for proposals — the document that interested consortiums would have crafted their bids around — was released to 12 companies that had been pre-qualified to participate in the procurement by Irving Shipbuilding in October 2016. Irving is the prime contractor for the combat portion of the National Shipbuilding Strategy, which includes the Arctic Offshore Patrol Ships and the Canadian Surface Combatant, and is tasked with building the 15 warships at its Halifax shipyard. At a projected cost of between $56 and $60 billion, it's the largest and most complex procurement in Canadian history. There were a number of delays in the closing date for the request for proposals. Originally set for April 2017, the first bids weren't received until last November. In its many technical briefings and media releases from that period, PSPC said the delays were partially as a result of the back-and-forth between industry, government and Irving — feedback which resulted in a number of amendments to the RFP. “A total of 88 amendments were issued by Irving Shipbuilding between November 1, 2016 and August 13 2018,” the order paper question response reads. “These amendments were developed and issued to address inquiries from the 12 pre-qualified bidders, and to incorporate process improvements to the competitive RFP so as to maximize the opportunities for bidders to demonstrate the value of their solutions to Canada.” The response goes on to say the $11.8 million was spent by the government of Canada on project legal fees during the amendment period, but that PSPC is not able to provide a breakdown on how much was spent on the amendments themselves. PSPC also noted that because Irving issued the RFP, they would have also incurred legal fees. In the end, three firms submitted bids for the Canadian Surface Combatant and last month the federal government chose a consortium of Lockheed Martin Canada and BAE Systems offering the UK navy's Type 26 global combat ship as the preferred bidder. Full article: https://www.thechronicleherald.ca/news/local/feds-legal-bill-nearly-12m-for-warship-work-261231/

Toutes les nouvelles