14 juillet 2020 | Local, Aérospatial

Canada’s Secret Cold War Submarine Drone Is Still Relevant Today

Extra-large autonomous submarines may revolutionize intelligence gathering and espionage under the sea. One of these ground breaking projects is the U.S. Navy's Boeing Orca extra-large uncrewed underwater vehicle (XLUUV). It is much larger than any other underwater drone currently in the water. But there is a historical precursor that, despite its epic Cold War story, is not widely known. And its mission, to lay covert sensor networks in the arctic, may be as relevant today as it was then.

During the Cold War, NATO believed that Russian submarines were using the ice cap in the Canadian Arctic as cover to covertly move between the Atlantic and Pacific. So the U.S. and Canada placed a special sonar network there, deep under the ice. Canadian engineers had to build the world's largest autonomous underwater vehicle (AUV), Theseus, to lay a cable where ships could not reach.

The project started in the 1980s, at a time when Russian submarines were getting much quieter. To listen for them, a joint U.S. and Canadian sonar array was to be placed several hundred miles north of the remote Canadian base at CFS Alert. The array was codenamed Spinnaker, in honor of the bar where scientists made many of the unclassified decisions in the project. This was similar to the now-famous SOSUS (Sound Surveillance System), but used classified technology to match its operational circumstances. In fact it must have been much more advanced than the original SOSUS.

Connecting the sonar array to the base would require laying a fiber-optic cable for hundreds of miles under permanent ice cap. The solution was to build the world's largest autonomous underwater vehicle. The uncrewed submarine would swim from an ice hole nearer to the base all the way to the Spinnaker array. As it went the cable would unreel out of the back. Thus ‘Theseus' got its name from the mythical hero of Ancient Greece who trailed thread behind him when he ventured into the labyrinth to fight the Minotaur.

When we think of advanced Canadian military projects which were ahead of their time, the Avro Canada CF-105 Arrow springs to mind. That delta-winged Mach-2 fighter flew in the 1950s and was cutting edge technology at the time, one of the all-time great aircraft. But it was cancelled abruptly in 1959 before it could enter service. The Theseus AUV is up there with the Avro Arrow, but less well recognized. And unlike the Arrow, it was used operationally, in one of the boldest projects started during the Cold War.

The project had many secret aspects. Years later much of what we know about the project comes from Bruce Butler, one of the core team involved. Bulter has written a book, Into the Labyrinth (on Amazon), and recently talked to the Underwater Technology Podcast about the project.

Theseus was 35 feet long and about 4 feet across. In AUV terms this is large, even today. In modern naval terminology it would be categorized as a large-displacement uncrewed underwater vehicle (LDUUV).

The Spinnaker sonar system was placed on the sea floor right on the edge of the arctic shelf. It was about 84 degrees north, up in the top right-hand corner of Canada, near to Greenland. Such an advanced project took years to realize, so it was not until spring 1996 when Theseus could go to work laying the cable. The whole operation was pushing the boundaries of uncrewed underwater vehicles at the time. Despite some close calls along the way, Theseus was able to navigate to the Spinnaker, letting out the vital thread as it went.

Many details of the project and technology involved are still classified. And we may never know whether Spinnaker ever picked up any Russian submarines. By the time it had been laid the Russian Navy was in steep decline following the end of the Cold War.

But with a resurgent Russian Navy today, the relevance of systems like Spinnaker may be greater than ever. And one of the roles which large submarine drones like the Orca might do is lay cables on the sea floor, unseen from above. Historical precedents like Theseaus can help us understand the way that these might be employed, and the challenges that they will face.

https://www.forbes.com/sites/hisutton/2020/07/12/canada-secret-cold-war-drone-submarine-is-still-relevant-today/#121a2da51e96

Sur le même sujet

  • Defence Department Assistant Deputy Minister Chris Henderson to return to Canadian Coast Guard

    11 décembre 2019 | Local, Naval

    Defence Department Assistant Deputy Minister Chris Henderson to return to Canadian Coast Guard

    DAVID PUGLIESE, OTTAWA CITIZEN Chris Henderson, who is Assistant Deputy Minister for Public Affairs at the Department of National Defence, is heading back to the Canadian Coast Guard. Henderson came from the Coast Guard in October 2017 to fill the ADM PA job at DND. Henderson had been serving as Director General, National Strategies at the coast guard. Sources said Henderson has informed senior DND and Canadian Forces leadership that he will take over as ADM for Operations at the coast guard on Jan. 6. Henderson is a former Royal Canadian Navy officer who had served as a public affairs officer for around 20 years. In 2007, Henderson was appointed as DG, Public Affairs and Strategic Planning, a post he occupied for two years. After leaving DND public affairs Henderson was off to Canada Border Services Agency. Then in 2014 he was named Director General, Strategic Communications in the Privy Council Office during the government of Prime Minister Stephen Harper. In that role, he oversaw a team of strategic communications specialists responsible for the coordination of all Government of Canada public communications. Henderson came into the ADM PA branch at a pivotal time. Many of the old guard public affairs officers were in the process of leaving the military, somewhat discouraged, because of being restrained by the Harper government in communicating with the public and journalists. Much of the communication with journalists was done via email statements. That, however, has not changed much. https://ottawacitizen.com/news/national/defence-watch/defence-department-adm-chris-henderson-to-return-to-canadian-coast-guard

  • Anand defends hesitation to further invest in defence as NATO secretary general arrives in Canada | CBC News

    19 juin 2024 | Local, Terrestre

    Anand defends hesitation to further invest in defence as NATO secretary general arrives in Canada | CBC News

    The cabinet minister in charge of the federal treasury says it doesn't make sense to pour vast amounts of money into the Department of National Defence until it has the capacity to spend what it's being given.

  • Work on HMCS Corner Brook could stretch out to 2021, DND confirms

    29 mars 2019 | Local, Naval

    Work on HMCS Corner Brook could stretch out to 2021, DND confirms

    DAVID PUGLIESE, OTTAWA CITIZEN HMCS Corner Brook's Extended Docking Work Period, or EDWP, is presently underway in Esquimalt, BC and was scheduled to be completed in 2020. But an assessment conducted by the contractor, Babcock Canada Inc., indicates that the work could take longer than expected, the Department of National Defence confirmed to Postmedia. DND spokeswoman Ashley Lemire said given the complex and lengthy nature of submarine EDWPs, periodic assessments are routinely undertaken by Babcock Canada to ensure that the schedule remains achievable. “The most recent schedule assessment took into account the remaining work, and an updated assessment of the potential risk factors, to produce a probabilistic assessment of the completion date that showed that the EDWP could continue into 2021 if a number of the risks materialized,” Lemire noted in an email. The Canadian government and Babcock will now undertake a review of all risks to determine how those can be avoided and or mitigated, she added. They will also review the remaining items still to be done to ensure that only essential work has been scheduled. “This necessary process generally results in the schedule coming back towards the baseline and the process must be left to unfold to determine if a full return to baseline can be achieved,” Lemire added. If the work on Corner Brook slips into 2021, it could have an impact on the work periods for other submarines to follow. https://ottawacitizen.com/news/national/defence-watch/work-on-hmcs-corner-brook-could-stretch-out-to-2021-dnd-confirms

Toutes les nouvelles