18 juin 2020 | Local, Aérospatial

Canada to buy more than $1 billion of missiles, related equipment from U.S. for CF-18 fighters

David Pugliese • Ottawa Citizen

The U.S. government has cleared the way for Canada to buy more than $1 billion worth of new missiles and related equipment for the Royal Canadian Air Force's CF-18 fighter jet fleet.

The U.S. State Department approved the proposed sale to Canada for the 50 Sidewinder AIM-9X Block II Tactical missiles, radars and other various equipment for an estimated cost of $862.3 million U.S. ($1.1 billion Canadian).

U.S. Congress was informed of the deal on Monday. The Defense Security Cooperation Agency in the U.S. announced the news on Tuesday.

The companies involved in the sale are U.S. firms, Raytheon, General Dynamics, Boeing and Collins Aerospace.

“This proposed sale will support the foreign policy and national security objectives of the United States by helping to improve the military capability of Canada, a NATO ally that is an important force for ensuring political stability and economic progress and a contributor to military, peacekeeping and humanitarian operations around the world,” the Defense Security Cooperation Agency stated in its announcement. ”This sale will provide Canada a 2-squadron bridge of enhanced F/A-18A aircraft to continue meeting NORAD and NATO commitments while it gradually introduces new advanced aircraft via the Future Fighter Capability Program between 2025 and 2035.”

Besides the 50 Sidewinder missiles, the deal will include training missiles, guidance systems, 38 specialized radar units, 20 Joint Standoff Weapons as well as support equipment.

In an email the Department of National Defence stated that the U.S. approval for the missiles and related equipment is part of the “Hornet Extension Project” or HEP. That is part of the overall $1.3 billion project cost and fleet maintenance costs, it added. “HEP will also provide upgrades to sensors, weapons, and survivability, as well as security enhancements,” the DND noted.

https://ottawacitizen.com/news/national/defence-watch/canada-to-buy-more-than-1-billion-of-missiles-related-equipment-from-u-s-for-cf-18-fighters

Sur le même sujet

  • Defence industry rep says Canada on ‘hamster wheel’ of red tape as ammo contracts fail to materialize

    24 juillet 2024 | Local, Terrestre

    Defence industry rep says Canada on ‘hamster wheel’ of red tape as ammo contracts fail to materialize

    Canadian efforts to boost ammunition production among domestic firms is caught in a “hamster wheel” of red tape, warns industry official

  • Canadian Armed Forces equipment delivered late half the time, auditor general finds

    9 juillet 2020 | Local, Aérospatial, Naval, Terrestre, C4ISR, Sécurité

    Canadian Armed Forces equipment delivered late half the time, auditor general finds

    By Charlie Pinkerton. Published on Jul 8, 2020 10:32am Half of all late requests for military materials and equipment arrived in Canadian soldiers' hands more than two weeks behind schedule because of a problem-ridden supply chain that often forced the military to incur extra shipment costs, a new report from the Auditor General has found. “We concluded that National Defence often did not deliver on time the materiel the Canadian Armed Forces requested, and that it did not have the right controls in place to determine whether it avoided needless transportation costs,” said the report authored by Auditor General of Canada Karen Hogan, which was released on Wednesday. During the period of the audit, there were approximately 1 million requests for materiel — military materials and equipment — submitted and fulfilled by National Defence. The audit oversaw all materiel covered by the National Defence Act, with the exclusion of ammunition, bombs, missiles and large equipment like aircraft, vessels and vehicles. The Auditor General found that 50 per cent of all late materiel requests were delayed by at least 15 days and 25 per cent were at least 40 days late. Of the highest priority requests — of which there were about 86,000 observed — 60 per cent were late. Fifty per cent of all were at least six days late, and 25 per cent were at least 20 days late. The Auditor General found that 162,000 requests, about 16 per cent of all it tracked during its audit, were more than one year late, having been stalled at some point in the supply chain. The goal of National Defence's supply chain is to “fulfill materiel requirements in the most economical and timely manner possible,” the Auditor General's report says. It attempts to achieve this by keeping equipment nearby where it thinks it will eventually be used. However, most equipment bought by the military is initial delivered to Canadian Armed Forces supply depots in Edmonton and Montreal. They then supply regional warehouses, which supply smaller localized military units. Materiel is transferred at units' requests, which are made in a number of ways, but are defined as being of one of three levels of priority — high priority, essential and routine. “We found that National Defence's systems and processes often did not ensure the timely and efficient delivery of military supplies to the Canadians Armed Forces,” Hogan's report says. Stock shortages caused delays, National Defence poorly managed priorities and costs for transportation were bungled. Per it's report, the Auditor General made three recommendations. It suggested that National Defence review its materiel forecasting to ensure it sufficiently stocks items at the correct locations, that it improve its oversight of high-priority requests so that the categorization is only used when necessary, and that it provide clear guidance on how to select the proper mode of transportation for items to ensure that decisions about shipments are based on fully understanding how much it'll cost. In a statement released shortly after the Auditor General's report, Defence Minister Harjit Sajjan said he “welcome(s)” its findings and accepts all recommendations. Similar concerns were raised a few years ago by the Auditor General's office about National Defence's equipment supply. In the fall of 2016, it raised issues with the military's ability to properly account for its inventory. The same fiscal year, National Defence announced a 10-year inventory management plan to address the Auditor General's concerns. The Trudeau government also released its multi-decade defence policy in the spring of 2017. One of the focal points of Strong, Secure, Engaged was to ensure the military was properly equipped. “Providing (the women and men of the Canadian Armed Forces) the training, equipment and care they deserve is the most important objective of this policy,” reads a line from the opening paragraph of Sajjan's opening message in more than 100-page policy. Upon being re-elected, Sajjan was again reminded of his responsibility to “ensure the Canadian Armed Forces have the capabilities and equipment required to uphold their responsibilities,” in the mandate letter assigned to him by Trudeau. In an emailed statement to iPolitics, Conservative Defence Critic James Bezan said “effective and efficient supply chains are crucial to the operating capability of the Canadian Armed Forces.” “Our military heroes rely on these supply chains to defend Canadians at home and abroad. It is clear that more work needs to be done in order to make these supply chains better for our men and women and uniform,” Bezan said. “The delivery of supplies must be timely so that materiel reaches military members when they need it,” Hogan's recently released report said. Defence Minister Harjit Sajjan said in a statement Wednesday that the Canadian Armed Forces will enhance its data analytics capabilities and “rely on real data to ensure” the military has the right supply chain approach for its ever-evolving requirements and to help better anticipate future needs. “These steps will make sure that we have the right equipment, in the right quantities, at the right places to meet the challenges we ask our members to face now and in the future,” he said. https://ipolitics.ca/2020/07/08/canadian-armed-forces-equipment-delivered-late-half-the-time-auditor-general-finds/

  • Lack of expert procurement staff could hinder Canadian Forces drone purchase

    25 avril 2019 | Local, Aérospatial

    Lack of expert procurement staff could hinder Canadian Forces drone purchase

    DAVID PUGLIESE, OTTAWA CITIZEN The Department of National Defence has updated details about its key ongoing defence procurements. I have written an article on that update which can be viewed at the National Post website: https://nationalpost.com/news/government-expects-to-award-contract-for-new-fighter-jet-fleet-in-2022-but-admits-it-could-face-delays The article notes the DND warning about issues that could affect the proposed purchase of a fleet of uninhabited aerial vehicles, commonly referred to as drones. The DND update warned that there might not be enough procurement staff with the required expertise to move that program forward on schedule. The department hopes to deal with the problem by hiring contractors. A draft invitation to qualify for that project was released April 5 and a contact is expected to be awarded in 2022, the update pointed out. The lack of staff has been an ongoing issue for the UAV program but in other ways. In May 2010 I reported The Canadian Force's plan to buy pilotless aircraft to conduct surveillance off the country's coasts, in the Arctic and on overseas missions had fallen behind schedule because the military doesn't have enough people to fly the drones. While the UAVs don't carry pilots, they still require an operator on the ground to fly the craft. Staff are also needed to maintain the equipment and to prepare them for flight. But at the time the air force was having difficulty finding enough people for a new unit that would be needed to operate the UAVs. Then called the Joint UAV Surveillance and Target Acquisition System or JUSTAS, there had been a number of plans for the acquisition. One of the earlier ones involved a request for proposals from industry to be issued by the end of 2009 and a contract signed in 2010. The first of the UAVs would have arrived by February 2012. That obviously didn't happen. A reworked plan called for the delivery of the UAVs in 2014, with full operating capability in 2017. That didn't happen. The project is now named, RPAS, for Remotely Piloted Aircraft System. The latest plan calls for a contract to be awarded in 2022-2023 with full capability – an armed drone fleet – in place by 2029-2030. https://ottawacitizen.com/news/national/defence-watch/lack-of-expert-procurement-staff-could-hinder-canadian-forces-drone-purchase

Toutes les nouvelles