5 avril 2018 | Local, Aérospatial

Calian Group Wins Royal Canadian Air Force Airworthiness Service Agreement Valued at up to $20M

Ottawa, ON April 05, 2018 – Calian Group Ltd. (TSX: CGY) is pleased to announce it has been awarded a contract renewal worth up to $20 million in support of the Royal Canadian Air Force's (RCAF) Airworthiness Program.

Calian will provide highly skilled professionals with expertise in 66 different categories of aeronautics to help ensure Canada's military fleet flies safely and effectively. The first year of the contract starts immediately and will run to March 31, 2019. The contract award includes two additional option years, with an aggregate contract value of approximately $20 million over the three years.

Calian is initially providing professional airworthiness, engineering and program support services through a team of about 30 specialists, including civilians and veterans. They will provide services in mechanical engineering, propulsion, electrical engineering, weapons safety and cybersecurity. To deliver these services Calian has again partnered with Valcom Consulting Group.

“We are honoured to continue providing these critical safety and security services to Canada's military aircraft fleet,” said Donald Whitty, Vice President, Calian Training. “We've been providing this support to the Airworthiness Program for 24 years, which goes far beyond technical reviews and flight test reports. We're protecting flight systems from cyber threats and providing critical security services for weapons, communications and computer systems.”

Calian is providing the RCAF with uniquely qualified experts who have sought-after signing authority to endorse changes and modifications to existing aircraft as well as assessments of newly acquired aircraft. RCAF aircraft use complex, interconnected systems, and under the Airworthiness Program any modifications must be reviewed, analyzed and tested to ensure flight safety is not compromised.

"This contract win falls directly in line with the first pillar of our growth strategy – customer retention. Customers come back to Calian because of our successful record delivering mission critical services with high satisfaction ratings,” said Jerry Johnston, acting President, BTS Division. “As one of Canada's largest defence companies, I am very pleased to see Calian continue this important partnership supporting the safety of the men and women in uniform.”

These Airworthiness services are critical to flight safety and operational readiness for new and modernized aircraft such as the Fixed Wing Search and Rescue Airbus C295W aircraft, Maritime Helicopter Project CH-148 Cyclone helicopter, CP-140 Aurora patrol, CH-146 Griffon helicopter, CH-147 Chinook helicopter, CH-149 Cormorant helicopter, CC-130 Hercules transport and CF-118 Hornet fighter.

About Calian Engineering

Calian offers full-spectrum systems engineering and technical services, supporting the Department of National Defence (DND), other government departments, and industry for over 30 years. Our engineers and technologists apply expertise in disciplines essential for system development, operation, and maintenance, with capabilities that offer full life-cycle support for soldier systems, major defence projects, electrical and electronic systems, computer systems, naval architecture, and aerospace systems.

About Calian

Calian employs more than 2,900 people with offices and projects that span Canada, U.S. and international markets. The company's capabilities are diverse with services delivered through two divisions. The Business and Technology Services (BTS) Division is headquartered in Ottawa and includes the provision of business and technology services to industry, public and government in the health, training, engineering and IT services domains. Calian's Systems Engineering Division (SED), located in Saskatoon plans, designs and implements complex communication systems for many of the world's space agencies and leading satellite manufacturers and operators. SED also provides contract manufacturing services for both private sector and military customers in North America.

For investor information, please visit our website at www.calian.com or contact us at ir@calian.com

Jacqueline Gauthier Media inquiries:

Chief Financial Officer Simon Doyle

613-599-8600 613-599-8600 x 205

https://www.calian.com/fr/node/1187

Sur le même sujet

  • Ottawa’s legal bill nearly $12 million for warship work

    28 novembre 2018 | Local, Naval

    Ottawa’s legal bill nearly $12 million for warship work

    Andrea Gunn (agunn@herald.ca) The federal government has spent $11.8 million on legal fees relating to the Canadian Surface Combatant project over the past two years, some of that owing to a large number of amendments to the project's request for proposals. In an answer to a written question posed last month by a Calgary Conservative MP, Public Services and Procurement Canada confirmed that 88 amendments had been made between July 1, 2016, and Oct. 2, 2018 to the request for proposals for the massive, multibillion-dollar project that aims to replace the Royal Canadian Navy's fleet of frigates. The request for proposals — the document that interested consortiums would have crafted their bids around — was released to 12 companies that had been pre-qualified to participate in the procurement by Irving Shipbuilding in October 2016. Irving is the prime contractor for the combat portion of the National Shipbuilding Strategy, which includes the Arctic Offshore Patrol Ships and the Canadian Surface Combatant, and is tasked with building the 15 warships at its Halifax shipyard. At a projected cost of between $56 and $60 billion, it's the largest and most complex procurement in Canadian history. There were a number of delays in the closing date for the request for proposals. Originally set for April 2017, the first bids weren't received until last November. In its many technical briefings and media releases from that period, PSPC said the delays were partially as a result of the back-and-forth between industry, government and Irving — feedback which resulted in a number of amendments to the RFP. “A total of 88 amendments were issued by Irving Shipbuilding between November 1, 2016 and August 13 2018,” the order paper question response reads. “These amendments were developed and issued to address inquiries from the 12 pre-qualified bidders, and to incorporate process improvements to the competitive RFP so as to maximize the opportunities for bidders to demonstrate the value of their solutions to Canada.” The response goes on to say the $11.8 million was spent by the government of Canada on project legal fees during the amendment period, but that PSPC is not able to provide a breakdown on how much was spent on the amendments themselves. PSPC also noted that because Irving issued the RFP, they would have also incurred legal fees. In the end, three firms submitted bids for the Canadian Surface Combatant and last month the federal government chose a consortium of Lockheed Martin Canada and BAE Systems offering the UK navy's Type 26 global combat ship as the preferred bidder. Full article: https://www.thechronicleherald.ca/news/local/feds-legal-bill-nearly-12m-for-warship-work-261231/

  • PBO at a loss to explain why cost of new Canadian warship, currently at $77B, keeps rising | The Chronicle Herald

    10 mars 2021 | Local, Naval

    PBO at a loss to explain why cost of new Canadian warship, currently at $77B, keeps rising | The Chronicle Herald

    The selection of a vessel that doesn’t yet exist has contributed to the risk of building Canada’s new warship fleet, but the parliamentary budget officer acknowledges he’s at a loss on why the price tag keeps rising. Parliamentary budget officer

  • Cost of federal science ship jumps from $108 million to nearly $1 billion | The Chronicle Herald

    23 février 2021 | Local, Naval

    Cost of federal science ship jumps from $108 million to nearly $1 billion | The Chronicle Herald

    The cost of building an offshore science vessel for the federal government, originally set at $108 million, has jumped to almost $1 billion. The price tag for the project had been steadily climbing from $108 million in 2008 to $144 million in

Toutes les nouvelles