11 décembre 2024 | International, Terrestre

Army secretary fires four-star general for promotion board meddling

Army Secretary Christine Wormuth fired Gen. Charles Hamilton, the first Army four-star to be fired in nearly 20 years.

https://www.defensenews.com/news/your-army/2024/12/10/army-secretary-fires-four-star-general-for-promotion-board-meddling/

Sur le même sujet

  • Army Ponders What To Cut If Budget Drops: Gen. Murray

    11 juin 2020 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité

    Army Ponders What To Cut If Budget Drops: Gen. Murray

    The Army Futures commander is making a list of which of the service's 34 top-priority programs to sacrifice first – and which programs outside the top 34 he has to save. By SYDNEY J. FREEDBERG JR.on June 10, 2020 at 4:18 PM WASHINGTON: The Army Secretary and Chief of Staff approved a draft spending plan for 2022-2026 yesterday that funds all 34 of the service's top-priority programs, the Army's modernization chief said this morning. But with the ever-growing cost of COVID looming over the economy and the Pentagon alike, Gen. John “Mike” Murray says he's already made a mental list of which of the 34 the service might have to slow down or sacrifice and which ones it absolutely has to save. “I have a one-to-N list in my mind” of the 34 programs, Murray told an Association of the US Army webcast this morning. “That's only in my mind, right now,” he emphasized. “It's pre-decisional.” In other words, it's not final, it's not official, and it's not ready to share with the public. All that said, however, it's still a telling sign of uncertain budget times that the four-star chief of Army Futures Command not only has such a list, but is willing to say he has it. Meanwhile, Murray's chief civilian partner, Assistant Secretary for Acquisition Bruce Jette, has launched a long-term study of the Army's economic prospects. In effect, Jette's looking at the supply side, asking how tight the budget will be, and Murray is looking at the demand side, asking what the Army should prioritize within that tight budget. Beyond The 34: “Critical Enablers” Gen. Murray is also looking at the Army's 684 other programs, he said, to determine which of them can be cut – while some have been slashed already to free up funding for the 34, others are so far unscathed – and which are essential to the top-34's success. “We can come up with, you know, the most impressive Next Generation Combat Vehicle in the world,” Murray said. “If you can't get fuel to it, then you're wasting your time.” Fuel is just one, particularly knotty logistical problem. Ultimately, Murray wants to reduce Army fuel demands by moving to hybrid diesel-electric motors. While electric power by itself might work for civilian cars, he said, he's skeptical the Army can charge batteries in combat, or that any practical amount of batteries can store enough energy to move, say, a 70-ton main battle tank. Likewise, while civilian quadcopters can run off batteries, the Army's new scout helicopter, the Future Attack Reconnaissance Aircraft, requires a high-powered turbine. So for decades to come, the Army will need fuel trucks, storage bladders, pumps, drums, hoses, and so on. And that's just for the gas. Both current and future combat systems require a staggering array of spare parts, repair tools, maintenance facilities, and more. Logistics is historically a US strength, but it's not a major focus of the 34 priority programs, which range from hypersonic missiles to smart rifles, from tanks to aircraft to robots. Besides weapons, the 34 do include a lot of high-tech information-age infrastructure, both to train the troops in virtual and augmented reality, and to share tactical data like target locations across the battlefield. There has not, however, been nearly as much emphasis on supporting functions such as fuel, maintenance, and transport. Murray now aims to fix that. Starting with a study by the Combined Arms Center at Fort Leavenworth, he said, the Army has come up with a list of “18 key critical enablers that are getting funded,” Murray said, again without naming them. Murray's calling the 34 priority programs “Tier One” and the 18 enablers “Tier Two,” he said. “Then tier three is ammo,” he added. The general didn't elaborate, but certainly a high-tech tank or aircraft can't fight without ammunition, just as it can't move without fuel. The catch is that, in modern warfare, you're not just buying rifle bullets and cannon shells, but a host of precision-guided munitions that are much more expensive to stockpile in bulk for a major war. Even once the Army has figured out which weapons, support systems, and ammunition it can afford to buy, it still won't be able to buy enough of them to equip every unit at once. The service's recent AimPoint study, Murray said, focused on figuring out which units around the world need to be modernized first and which will have to wait. “The whole point behind AimPoint was an understanding that you can't modernize the entire army overnight, or in a year, or really even in a decade,” Murray said. As a young officer, he recalled, his unit had M60 tanks and M113 transports “while the rest of the Army was running around in M1s and Bradleys.” While he doesn't to return to the extreme disparities of the past, he said, “somebody has to be first and somebody has to be last.” https://breakingdefense.com/2020/06/army-ponders-what-to-cut-if-budget-drops-gen-murray/

  • Maiden flight of first EMD Red Hawk jet slated for September 2021

    19 août 2020 | International, Aérospatial

    Maiden flight of first EMD Red Hawk jet slated for September 2021

    by Gareth Jennings The US Air Force (USAF) has slated September 2021 for the maiden flight of the first of five engineering and manufacturing development (EMD) Boeing-Saab T-7A Red Hawk advanced jet trainer aircraft, Janes has learned. With production of the EMD aircraft set to shortly begin at Boeing's St Louis facility in Missouri and Saab's Linköping facility in Sweden, a USAF official told Janes on 18 August that the hitherto undisclosed date for the first EMD flight has now been set. “Saab has released all EMD aircraft ‘build-to-packages' to support build and manufacturing preparation. The EMD [aft] fuselages (five in total) are currently planned for build at Saab's factory in Sweden with delivery [to St Louis] no later than April 2021. Production is expected to begin with jig load [this] August at Boeing in St Louis. Boeing currently plans for assembly to be complete in June 2021, with the first EMD flight expected in September 2021,” the USAF said. Prior to this disclosure, both Boeing and Saab had declined to comment on the timetable for the first EMD flight, noting only that “this is very sensitive information for the USAF”. With two production-representative jets (PRJs) currently flying, the present EMD phase of the contract covers the five further aircraft and seven simulators. https://www.janes.com/defence-news/news-detail/maiden-flight-of-first-emd-red-hawk-jet-slated-for-september-2021

  • India releases details of new defense budget

    3 février 2021 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité

    India releases details of new defense budget

    By: Vivek Raghuvanshi NEW DELHI — India on Monday allocated $18.48 billion for weapons procurement in its 2021-2022 defense budget amid an ongoing military standoff with China and financial stress on the national economy due to the coronavirus pandemic. Excluding pensions, the new defense budget totals $49.6 billion, an increase of more than 3 percent from the previous year's $47.98 billion. New capital expenditure of $18.48 billion meant for arms procurement witnessed an increase of about 16 percent from the previous year's $15.91 billion. This is the highest-ever increase in capital outlay for defense in the last 15 years, according to Indian Defence Minister Rajnath Singh. An additional $2.84 billion was spent on emergency arms purchases in the summer of 2020 to deal with the ongoing confrontation with China. The budget's revenue expenditure meant for maintenance of existing weapons, pay and allowances, and recurring expenses is set at $29.02 billion, compared to $28.75 billion in the previous defense budget. Officials in India point to the COVID-19 pandemic as disrupting the economy and thus affecting the government's income and driving spending decisions. Consequently, the defense budget might not be as high as it would've been were there not a pandemic, said Amit Cowshish, a former financial adviser for acquisition at the Ministry of Defence. Cowshish noted that the funds may be inadequate for all the planned acquisitions from abroad and at home to be signed during the upcoming financial year, which begins April 1. Capital expenditure is essentially defense funding meant for fresh arms procurement and existing liabilities from previously conducted defense contracts. Revenue expenditure is defense spending meant for the pay and allowances of military personnel as well as the maintenance of weapons and other existing inventory items. The Army will receive $4.9 billion in capital expenditure, which is an increase of 8.17 percent from the previous year's $4.53 billion. “The service could buy additional military vehicles and upgrade its drones fleet,” a senior Army official said. The service's revenue expenditure is set at $20.37 billion, compared to $20.11 billion in the previous budget. The Navy will receive $4.55 billion in capital expenditure, which is an increase of nearly 22 percent from previous year's $3.73 billion. This could pave the way for the service to buy 10 tactical MQ-9 Reaper drones from General Atomics through the U.S. Foreign Military Sales program, an Indian Navy official said. The revenue expenditure for the Navy is $3.19 billion, which is meant for the maintenance of warships and submarines, compared to $3.13 billion in the previous budget. The Air Force will receive $7.2 billion in capital expenditure, which is a hike of 19 percent from the previous year's $6.05 billion. According to a service official, this will go toward a new contract for 83 homemade LCA MK1A Tejas light combat aircraft, an existing commitment to pay for 36 Rafale fighters from France and five units of S-400 missile defense systems from Russia, among other efforts. The Air Force's revenue expenditure is $4.19 billion, compared to $4.1 billion in the previous budget. About $1.55 billion in capital expenditure will go toward the state-owned Defence Research and Development Organisation for new projects, compared to $1.47 billion in the previous budget. DRDO has also been given a revenue expenditure totaling $1.24 billion, compared to $1.2 billion last year. This year, existing liabilities could eat up to 90 percent of the new capital expenditure, which will impact several new weapons procurement efforts, an MoD official said. But if that high percentage is accurate, according to Cowshish, there must be a lot of equipment already on contract. The military will have to make do with whatever amount is left over for acquiring new systems, he noted. “Capability-building and self-reliance ... are long-term projects, which are not dependent entirely on the budgetary allocation in a particular year. Hopefully things will improve in the future.” https://www.defensenews.com/global/asia-pacific/2021/02/02/india-releases-details-of-new-defense-budget/

Toutes les nouvelles