28 juillet 2022 | International, Naval
Thales finalise l’acquisition d’Advanced Acoustic Concepts (AAC)
TDSI, filiale de Thales, vient de finaliser l’acquisition d’AAC, la société commune partagée avec Leonardo DRS.
30 avril 2020 | International, Aérospatial
By: Angela Charlton, The Associated Press
PARIS — Airbus says the aviation industry's unprecedented troubles are just beginning.
The European manufacturing giant reported €481 million (U.S. $515 million) in losses in the first quarter, put thousands of workers on furlough and sought billions in loans to survive the coronavirus crisis. And its CEO said Wednesday it's still at an “early stage.”
Even after virus-related travel restrictions eventually ease, Chief Executive Guillaume Faury acknowledged it will take a long time to persuade customers to get back on planes. Just how long, he can't predict.
“We are in the gravest crisis the aerospace industry has ever known,” Faury said. “Now we need to work as an industry to restore passenger confidence in air travel as we learn to coexist with this pandemic.”
Images shared online of packed planes and maskless, elbow-to-elbow passengers on U.S. flights — despite virus protection guidelines - have worried travelers and airline unions alike. International travel restrictions, meanwhile, have grounded thousands of planes worldwide.
Faury insisted that airplanes are “probably the best place to be” during a virus outbreak because of air filtration systems put in place after previous virus outbreaks and other threats, but said Airbus will work with aviation authorities to try to calm the public.
Shares in Airbus and Boeing have dropped some 60 percent this year as customer airlines collapse or seek billions of dollars in government bailouts.
Airbus was unable to deliver 60 planned planes in the quarter because of virus-related problems, and said the second quarter looks similarly rough. Customers are asking for delays, which Faury called “the biggest issue we are managing at the moment.”
Airbus executives expressed hope Wednesday that deliveries could start picking up in the second half of the year. But they refused to issue long-term guidance given that the virus is still spreading, and that governments are reluctant to relax international travel restrictions.
U.S. rival Boeing is facing similar woes. Boeing's CEO said Monday that it will take years for the aircraft-building business to return to levels seen before the coronavirus pandemic.
Airbus has slashed production by a third since the virus hit, and Faury said Airbus will study “resizing” the company after the crisis ebbs — a worrying prospect on a continent where Airbus has factories in four countries and is one of the region's industrial leaders.
Already 3,000 Airbus workers in France are on temporary unemployment and the number is expected to grow. In addition, 3,200 workers in the U.K. are on furlough and negotiations are under way to put thousands of German workers on short work plans.
A recent letter by Faury warning workers that the company is “bleeding cash” was a shock to many. But Frederic Romain of French union CFTC said “the situation requires transparency. It allows workers to open their eyes” to what's ahead.
“Fears? We have a lot of them. For the moment we don't have a clear vision of what awaits us," Romain said.
Airbus reported a 15 percent drop in revenues to €10.6 billion in the first quarter.
Looking longer term, Faury insisted that Airbus remains committed to reducing airplane emissions but said it's “less urgent” than before the coronavirus crisis because the company has more pressing problems to solve. “For practical cash reasons," Airbus has stopped or suspended some projects aimed at “decarbonizing” its production, he said.
https://www.defensenews.com/industry/2020/04/29/airbus-reports-515m-in-first-quarter-losses/
28 juillet 2022 | International, Naval
TDSI, filiale de Thales, vient de finaliser l’acquisition d’AAC, la société commune partagée avec Leonardo DRS.
23 avril 2020 | International, Naval
By: Tom Kington ROME — Italy shipbuilder Fincantieri has reopened its facilities after more than a month of closure due to coronavirus. The state controlled firm shut down on March 16 after talks with unions as the virus swept through Italy — the first Western country to be hit hard. Since then, Italy's death toll has been overtaken by the U.S., but remains the most exposed country in Europe, with more than 25,000 deaths and 187,000 total infections. As the contagion rate slows however, the government is targeting May 4 as the date to relax rigid lockdown rules for the public. Fincantieri was given the go ahead to restart production on Monday — at a reduced pace. At the firm's Riva Trigoso yard in the Liguria region, where 1,800 were employed before lockdown building Italy's final FREMM frigate and PPA vessels for the Italian navy, just 350 will initially return to work, a spokesman said. Of that number, 150 will be Fincantieri staff, while the remainder are maintenance, cleaning and security contractors. A similar policy is being followed at Fincantieri's Muggiano yard, also in Liguria, where 2,600 are normally employed, and where just 200 staff and 200 contractors have returned to continue work for Italy on a logistics vessel, the Vulcano and a new LHD, the Trieste; as well as a corvette for Qatar. “We hope to be back to full personnel numbers by the end of May or the start of June,” said the spokesman. In the meantime, safety precautions will be taken, including staggered entrances to the yards for staff, obligatory masks and gloves at work, temperature checks at entrances to spot fever sufferers and in-house medical staff. Each staff member will be given a packet of 20 masks per week so they can change them multiple times during each day. “We are planning buses to get staff to work so they don't have to use public transport,” said the spokesman. Similar measures will be taken at Fincantieri's other yards in Italy, which build cruise ships. During the shutdown, the firm's 8,900 staff were kept at home through use of vacation time, furloughs and home working. By contrast, Italian state defense group Leonardo did not close during the lockdown, although many staff worked from home when possible. A deal was struck with unions to introduce social distancing and cleaning at facilities in Italy, and no staff were furloughed, a spokeswoman said. Separately, the Italian government has reconfirmed Leonardo CEO Alessandro Profumo in his role after his mandate ended. The government did however appoint a new chairman, Luciano Carta, who moves from his post as director of Italy's foreign intelligence service. He replaces Gianni De Gennaro, who was head of the government department overseeing Italy's foreign and domestic intelligence services between he joined Leonardo in 2013. https://www.defensenews.com/coronavirus/2020/04/22/fincantieri-reopens-shipyards-in-italy
24 avril 2020 | International, Terrestre
While some prototype deliveries and field tests are being delayed, Army leaders said, there's enough slack in the schedule that combat units will still get the new tech on time. By SYDNEY J. FREEDBERG JR.on April 23, 2020 at 2:40 PM WASHINGTON: The Army and its contractors are coping with the COVID-19 pandemic so well that the service expects no delay in the fielding of future weapons, the Army Secretary and his two top modernization officials told reporters today. The “rigorous” review of acquisition programs for the 2022 budget request is also still on schedule, Sec. Ryan McCarthy said. “It's just amazing how quickly they've adapted, kept their workforce engaged, and are protecting cost, schedule, and performance on these weapons systems,” said McCarthy, recently returned from a visit to BAE and General Dynamics facilities in Detroit. “Also I'm very proud of Dr. Jette's and Gen. Murray's performance during this crisis, working on things like progress payments for manufacturers, trying to help them get access to small business loans, the managing of second- and third-tier suppliers.” “Right now, all the companies that were closed for any period of time are reopened,” said Assistant Secretary Bruce Jette, the service's civilian acquisition chief. One BAE worker was infected, resulting in a week-long shutdown of a combat vehicle assembly line – you can't weld armor plate over your telephone, Jette noted – but the company has now restarted production with new precautions in place. The company and the union have agreed to give up their traditional week-long shutdown for summer vacation to catch up. The Boeing CH-47 helicopter plant in Philadelphia also shut down for 10 days, Jette reported, but they're back up and running as well. He's most worried about smaller subcontractors, where a single COVID-19 case can force the entire workforce to be quarantined for 14 days, so he's tracking that closely. “I keep track on a daily basis of 63 pages of supply chain [data],” Jette said. “Our industry partners have been really good about opening their books all the way down to their sub-suppliers and keeping us well-informed — they contractually don't have to do that but they have.” Some deliveries of prototypes have been delayed, said Gen. John “Mike” Murray, chief of Army Futures Command. But, so far, those delays are measured in weeks and there's sufficient slack in schedules to catch up later this year, he said, which means programs will proceed to production and fielding on time. What's particularly tricky for the Army is that, after decades of dumping “good ideas” on soldiers only to find they didn't actually work, it's now systematically letting soldiers try out prototypes hands-on. These soldier touchpoints require troops to work together in the field, often side-by-side with contractors who record their feedback and make some fixes on the spot. That's difficult given pandemic precautions – but not impossible. Other types of testing allow a little more social distance, and work from engineering design to budget reviews can take place entirely online. Gen. Murray gave a rundown of key programs: The next flight test of Lockheed Martin's Precision Strike Missile (PrSM) will take place as scheduled on April 30th, Gen. Murray said. “I'm very confident,” he declared, to the point he's already planned his flight to go observe. On the other hand, the third big soldier touchpoint test for the IVAS targeting goggles, scheduled for this summer, has been delayed to the fall. That's not just because of social distancing, Murray said, but also because a Microsoft subcontractor ran into COVID-19 problems (they'll be back in operation this week). Because this would have been the first test of a fully militarized and ruggedized “form factor” of IVAS, which began life as a modified Microsoft HoloLens, it's too important to cut corners, he said. The program will be able to make up the lost time and deliver the final production version to troops on schedule, he said. There's been a six week delay in delivery of the three competiting prototypes for Next Generation Squad Weapon, meant to replace the M249 SAW. Once the weapons arrive, however, the Army will now get them into soldiers' hands in just two weeks, a month faster than originally planned, making up for most of that lost time. Field-testing of one contender for the new FTUAS drone is already underway at Fort Riley, as we've previously reported. Testing of another drone design at Fort Campbell is “a little bit delayed,” Murray said, but should start by the end of the month. The Limited User Test of the IBCS missile defense network has been postponed (again, as we've reported). But the equipment remains in place at White Sands Missile Range in New Mexico, Murray said, software updates continue, and the soldiers who spent months training to operate it will be back to do the test “this summer or early fall.” (The Army also previously announced it would postpone field tests of promising new Robotic Combat Vehicles). “In general,” Jette said, “we don't see any FUEs changing”: That's military jargon for “First Unit Equipped,” the crucial moment when enough of a weapon has been built to equip a significant combat unit. “We are tracking each program,” Jette said, not just the service's top priorities “but all of our over 600 programs, [and] none of them are at risk” of a delay so severe they can't recover. https://breakingdefense.com/2020/04/covid-19-wont-slow-new-army-weapons-mccarthy-murray-jette/