24 septembre 2020 | Information,

AIA’s Fanning: Civil aviation’s nosedive endangers Pentagon supplies

WASHINGTON ― The Pentagon's shared supply chains with battered commercial aviation companies will suffer if Washington doesn't provide that sector with aid soon, the Aerospace Industries Association warned Wednesday.

The trade group released its recovery plan for the broad aerospace and defense sector as Congress has begun a fierce Supreme Court replacement battle, shifting attention away from passing another stimulus package to defray the impact of the coronavirus pandemic.

But AIA President and CEO Eric Fanning suggested some aviation companies have little time to wait.

“If the commercial side doesn't get some relief, you are going to see companies in the supply chain go out of business, and that will impact the defense side,” Fanning said in a teleconference with reporters. “We're going to see bankruptcies, consolidation, closures in the supply chain, and she of them are single points of failure.”

The defense subsector, declared essential at the pandemic's start, enjoys steady demand from the Pentagon, which has accelerated payments to prime contractors and directed stimulus funds toward its suppliers. However, sagging demand for commercial air travel will fuel a $100 billion revenue loss in the U.S. this year, Fanning said.

AIA's analysis concluded another 220,0000 civil aviation jobs are at risk beyond 100,000 already lost. The study and its recommendations were prepared by Avascent, Boston Consulting Group, and McKinsey & Company, combined with input from AIA member companies.

Beyond any federal aid, the civil aviation industry, the agency said, can highlight the steps it's taken to make air travel safer; increase communication between original equipment manufacturers, prime contractors, and suppliers, and support flexibility in the supply chain if private companies offer balance-sheet support and share inventory risk.

The report called for stable Defense Department funding from Congress, but also said DoD can relieve stress on the industrial base by accelerating procurements of systems and services, with a focus on suppliers with notable commercial aerospace exposure. DoD can also keep making increased payments against ongoing contracts as they reach development and production milestones.

AIA also continues to advocate for industry reimbursements for costs incurred during the COVID-19 pandemic, as authorized by Section 3610 of the CARES Act. Defense officials have said they need roughly $10 billion, and that without added funding from Congress, the Pentagon would have to dip into modernization and readiness funds.

AIA's call comes a day after key House progressives, Reps. Marc Pocan and Barbara Lee, demanded an investigation and public hearings into the use of economic stimulus funding for defense contractors, calling it a “Pentagon misuse of COVID funds.” The Pentagon, which reported its intent to Congress in May, refuted that characterization.

When asked, Fanning said it was important for the Pentagon to shore up previously identified supply chain weaknesses that the pandemic might exacerbate.

“This money was put into contracts, so the war fighter is getting something for that,” Fanning said. “But I think the important thing is the critical nature of this industrial base, not just to the nation's economy, which is the health and safety of American's citizens writ large, but also to our nation's security.”

A larger obstacle to winning further aid for the sector is that Congress has deadlocked over continued stimulus funding overall.

AIA's report proposed that the government establish an investment fund that would send government-backed capital to civil aerospace suppliers; subsidize the airlines' major maintenance, repair, and overhaul visits, and continue to payroll assistance to support employees.

Fanning told reporters that AIA found bipartisan backing for the idea of a payroll cost-share program, but there has been no legislative vehicle behind it.

“The real problem is there's no bill,” Fanning said. “Congress hasn't been able to come together with the administration and itself to get a bill in place.”

https://www.defensenews.com/congress/2020/09/23/aias-fanning-civil-aviations-nosedive-endangers-pentagon-supplies/

Sur le même sujet

  • Podcast: The Next World After This: A&D Enters the Metaverse

    20 mai 2022 | Information, Autre défense

    Podcast: The Next World After This: A&D Enters the Metaverse

    Your aerospace or defense business is about to enter a whole new world: the metaverse. A mix of the physical and digital realms, the metaverse is an unmapped—but not unknown—territory that looms beyond Industry 4.0. OEMs and Tier 1s already are entering the domain with cloud computing, virtual reality and quantum computing. Where they go, so go suppliers.

  • Trousse d’information pour les fournisseurs : Comment obtenir une attestation de sécurité

    12 février 2023 | Information, Autre défense

    Trousse d’information pour les fournisseurs : Comment obtenir une attestation de sécurité

    Cette trousse d’information fournit un accès rapide et facile aux ressources et aux outils conçus pour aider votre organisation à obtenir une attestation de sécurité avec le Programme de sécurité des contrats (PSC) de Services publics et Approvisionnement Canada. La trousse passe en revue les étapes que votre organisation et vos employés doivent suivre avant de soumissionner ou d’exécuter des travaux dans le cadre d’un contrat du gouvernement fédéral comportant des exigences de sécurité. Sous chaque étape, vous trouverez des liens vers des ressources, des guides, des vidéos et du matériel de formation en ligne. Ces ressources et outils donneront à votre organisation et à vos employés des conseils pratiques sur la manière de réaliser les activités d’enquête de sécurité, remplir les formulaires connexes, et se conformer aux exigences du PSC. Sections Étape 1 : Exigences de sécurité et types d’attestation de sécurité Comprenez quelles sont les exigences de sécurité et quel type d’attestation de sécurité votre organisation pourrait avoir besoin pour soumissionner ou exécuter des travaux dans le cadre d’un contrat du gouvernement fédéral. Étape 2 : Parrainage Découvrez comment votre organisation doit être parrainée pour faire l’objet d’une enquête de sécurité auprès du PSC. Étape 3 : Enquête de sécurité sur l’organisation Découvrez les principales étapes que votre organisation devra franchir et les principaux formulaires qu’elle devra remplir pour faire l’objet d’une enquête auprès du PSC. Étape 4 : Enquête de sécurité sur le personnel Une fois que le PSC a effectué l’enquête, apprenez comment votre organisation peut demander le niveau approprié d’enquête de sécurité sur le personnel pour les employés admissibles. Étape 5 : Sous-traitance Découvrez comment demander une enquête de sécurité pour les sous-traitants afin de vous assurer qu’ils satisfont aux exigences de sécurité d’un contrat du gouvernement fédéral. Étape 6 : Maintenir la conformité Comprenez ce que votre organisation et vos employés devront faire pour rester conformes aux exigences de sécurité d’un contrat du gouvernement fédéral. Renseignements supplémentaires Si vous avez des questions ou si vous avez besoin d’une aide personnalisée, n’hésitez pas à communiquer avec le centre de service à la clientèle du Programme de sécurité des contrats. Pour savoir où envoyer vos documents remplis, consultez comment soumettre les demandes, formulaires et autres documents pour la sécurité des contrats.   https://www.tpsgc-pwgsc.gc.ca/esc-src/ressources-resources/tif-its-fra.html

  • Bourget 2019 : IAI dévoilera le drone T-Heron

    10 juin 2019 | Information, Aérospatial

    Bourget 2019 : IAI dévoilera le drone T-Heron

    Par Justine BOQUET A l'occasion de l'édition 2019 du salon du Bourget, Israel Aerospace Industries dévoilera son nouveau drone T-Heron. Israel Aerospace Industries a annoncé le 4 juin que le salon du Bourget serait l'occasion de présenter son nouveau drone militaire, le T-Heron. Ce dernier né dans la famille Heron pourra être employé pour la conduite de missions tactiques. Il permettra de collecter et transférer des informations vers les forces au sol. Capable d'emporter une charge utile de 180 kilos, le T-Heron a été conçu afin de pouvoir être équipé de différents types de capteurs en fonction des missions opérationnelles. Afin de mettre au point ce nouvel aéronef, IAI a capitalisé sur son expérience dans le domaine des drones. Ainsi, l'industriel rappelle que la famille des drones Heron a accumulé plus de 1 700 000 heures de vol en opérations. http://www.apps-drones.com/bourget-2019-iai-devoilera-le-drone-t-heron-124297

Toutes les nouvelles