Back to news

August 20, 2019 | Local, Land

Sole source armoured vehicle deal with General Dynamics costs double original estimates

DAVID PUGLIESE, OTTAWA CITIZEN

The Liberal government is buying new armoured vehicles for the Canadian Forces but the sole source deal will cost taxpayers double what was originally estimated.

Defence Minister Harjit Sajjan announced Friday that the government would buy 360 combat support Light Armoured Vehicles from General Dynamics Land Systems-Canada, with the project costing $3 billion.

The project was originally announced by the Liberal government with an estimated cost between $500 million and $1.5 billion. The plan was to award the contract in 2023 after a competition.

But with the federal election looming the deal was fast-tracked by the Liberals, joining a series of recent defence-related funding announcements. A competition was jettisoned, replaced with a sole-source deal with General Dynamics, based in London, Ont.

The deal includes a $650 million repayable loan, but the Department of National Defence said it had no details on that arrangement. It referred questions to Global Affairs Canada, which noted in an emailed statement that the federal government is “willing to provide a loan to General Dynamics Land Systems Canada to ensure the timely delivery of the Light Armoured Vehicles for our men and women in uniform. The Government of Canada is providing a loan to GDLS-C to support jobs and suppliers as GDLS-C navigates a challenging and dynamic international defence market.”
The terms of the loan would be negotiated over the coming weeks, Global Affairs Canada added.

The DND noted that the project costs include not only the vehicles but logistics support and new infrastructure to house and maintain the equipment.

General Dynamics will provide the new vehicles in eight variants. They will be used as ambulances and in other roles such as vehicle recovery, engineering, mobile repair, electronic warfare and as command posts. The current fleet of armoured support vehicles is comprised of the LAV II Bison and the M113 tracked vehicle.

The federal government said it is in the final stages of contract negotiations with General Dynamics. The contract is expected in the coming weeks.

It noted in a news release that fast-tracking the deal would allow the Department of National Defence to save costs associated with maintaining or extending the life of the current fleet.

The DND stated the contract was sole-sourced to General Dynamics as the firm builds most other armoured vehicles for the Canadian Forces and having a vehicle based on the same chassis allows for savings in maintenance and training.

The company's light armoured vehicle is the core of the Canadian Forces armoured vehicle fleet.

In addition, as the company has recently completed the conversion of the light armoured vehicle fleet to a new configuration so it has the skilled workforce in place, according to the DND. That would reduce the risk of delays in delivery of the new vehicles, stated the DND in an email. “For these reasons, we believe it would not be in the public interest to solicit bids,” it added in an email.

General Dynamics Land Systems – Canada is also building similar light armoured vehicles for Saudi Arabia in a deal worth $15 billion.

The Liberal government launched a review of that controversial contract after the murder of journalist Jamal Khashoggi inside the Saudi consulate in Turkey. Earlier this year a United Nations report determined that Saudi Arabia was responsible for the killing of Khashoggi who was a critic of that country's regime.

Saudi Arabia has also faced severe criticism for its role in the ongoing war in Yemen, with allegations it has conducted unlawful airstrikes on civilians.

A dozen organizations sent Prime Minister Justin Trudeau a letter earlier in August, questioning the status of the review and pointing out that no updates on progress have been provided. The lack of such information has brought “the sincerity of the effort into question,” according to the letter endorsed by organizations such as Oxfam Canada and Amnesty International.

Various groups have demanded the Liberals cancel the Saudi deal, which was negotiated by the previous Conservative government.

https://ottawacitizen.com/news/national/defence-watch/sole-source-armoured-vehicle-deal-with-general-dynamics-costs-double-original-estimates

On the same subject

  • Quantum-enhanced radio-frequency sensing

    October 12, 2022 | Local, C4ISR

    Quantum-enhanced radio-frequency sensing

    Innovative Solutions Canada along with the Department of National Defence are seeking a quantum-enhanced Radio-Frequency (RF) sensing technology solutions to improve target detection using radars via quantum-enhanced radar transmitters and/or radar receivers. https://ised-isde.canada.ca/site/innovative-solutions-canada/en/quantum-enhanced-radio-frequency-sensing

  • Canada: Defence Procurement Canada: Is It ‘Back To The Future' For Defence Procurement?

    January 6, 2020 | Local, Aerospace, Naval, Land, C4ISR, Security

    Canada: Defence Procurement Canada: Is It ‘Back To The Future' For Defence Procurement?

    Article by Marcia Mills and Paul Burbank Capital Perspectives Last Updated: January 3 2020 The issues surrounding defence acquisition took a backseat in the run up to the 2019 federal election. As noted by the Canadian Global Affairs Institute, this occurred despite the fact that two of the largest defence procurements in Canadian history – the Canadian Surface Combatants (warships) project and the Future Fighter Capability Program (fighter jets) – are in active procurement mode, spending is falling short of forecast and roughly 70 per cent of the approved projects under the 2017 implementation of the Strong, Secure, Engaged Defence Policy have seen schedule delays 1. Canadian defence procurement is a many-layered affair. Spread across three departments and a central agency (the Department of National Defence; Public Procurement and Services Canada; Innovation, Science and Economic Development; and Treasury Board, respectively), the need to coordinate and align this much bureaucracy is often viewed as one of the significant problems in defence procurement. The two main political parties offered very different solutions to these issues during the election, but provided few details. The Platforms The Conservatives focused on the need to "de-politicize" the procurement process, which would in turn deliver greater value for money and better resources for the Canadian military. To accomplish this, new oversight mechanisms, both in Cabinet and in the Privy Council Office, would be created. 2 Major defence procurements are already subject to oversight by the Defence Procurement Secretariat, a Deputy Ministers Governance Committee and a Ministers Working Group. It is not entirely clear how additional layers of oversight would reduce delay and improve efficiencies, unless the new mechanisms replaced all or some of the current oversight layers. The Liberal platform included a portion on defence procurement that pointed to the creation of "Defence Procurement Canada," to ensure defence projects were delivered on time and with greater transparency. The structure of Defence Procurement Canada was not explained. A bit of speculation is now in order as to what this could mean for defence procurement. The New Cabinet The Liberals formed a minority government and announced their new Cabinet on Nov. 20. While the Ministers of Defence (Harjit Sajjan) and Innovation, Science and Economic Development (Navdeep Bains) remain the same, Treasury Board has a new President and Public Services and Procurement Canada (PSPC) has a new Minister – Jean-Yves Duclos and Anita Anand, respectively. Treasury Board President Duclos moves from a smaller, specific portfolio within Employment and Social Development Canada to now preside over one of the federal government's most powerful central agencies and cabinet committees. He will have a considerable role in ensuring effective financial management and government spending. Minister Anand is a new face in Cabinet and a first-time Member of Parliament for the riding of Oakville, Ont. She is assuming responsibility for, amongst other things, the two single largest purchasing organizations in the federal government (PSPC and Shared Services Canada (SSC)). Going Forward Defence procurement in Canada follows a general ebb and flow – resources are increased during times of conflict and are reduced in times of peace. Restructuring occurs in response to these influences, as well as perceived redundancies, desired efficiencies and the odd scandal or two. Various Minsters and departments have been responsible for defence procurement and production over the past 100 years, including boards or commissions set up during times of war. A new independent department for defence procurement would result in three different departments (SSC, PSPC and the Defence Procurement Canada) managing the vast majority of federal acquisition. This approach would be similar to the stand up of the Department of Defence Production in the '50s. The DDP had a short life. Established in 1951, it was expanded to become the central purchasing organization in 1963 as an interim measure, then disbanded in 1969 with the establishment of the Department of Supply and Services. The amalgamations of various entities continued until 1993, with the creation of the Department of Public Works and Government Services (a.k.a. PSPC). PSPC operates as a central purchasing agent for the government, with exclusive authority under the Defence Production Act to acquire defence supplies for DND. If Defence Procurement Canada is to exist as a departmental corporation or agency, the government would want to launch this new entity early in its mandate so that it can lay claim to any degree of efficiency or success achieved. If so, the new entity would likely remain within PSPC, as the Minister has existing statutory authority to create a supporting departmental corporation or agency under the Defence Production Act. Creating this entity outside of PSPC's current authority would require a significant reorganization of the public service and change to the operations of government of a magnitude greater than that required to establish Shared Services Canada – this would include deciding whether to maintain or decentralize the functions of defence procurement and defence production, as well as significant statutory amendments to provide or reduce, as required, the authority of all Ministers involved. Ministerial mandate letters, which were released in mid-December, shed no additional light on the specific operational structure or corporate identity that Defence Procurement Canada is expected to take. Notable in these letters, however, is a prevailing theme: Minister Anand has the clear responsibility for bringing forward options to Cabinet, but that effort will be supported by a host of respected, senior ministers, including Minister Sajjan (National Defence), Minister Jordan (Fisheries & Oceans and the Canadian Coast Guard), and Minister Bains (Innovation, Science and Industry). As all of these Ministries are already involved in defence procurement, their continued support is not surprising. Throughout the history of defence acquisition and production in Canada, large-scale reorganization has been predicated by one of three events: war, post-war reconstruction or scandal. Absent one of these triggers, a minority government may have little appetite (or be able to drum up support from any other party) to stand up a wholly new department, or even a departmental corporation or agency within PSPC itself, on the basis of efficiency and economy alone, particularly in light of the on-going Phoenix debacle and the continued issues at Shared Services Canada. As no new Minister for Defence Procurement Canada was named in the new Cabinet nor were any Additional Ministers within PSPC named for defence or Defence Procurement Canada, it appears that, at least for now, any defence acquisition reorganization is likely to remain on the backburner. Marcia Mills is procurement counsel with the Fasken Ottawa office and has 20+ years of private and public sector experience. She provides clients with legal and strategic advice for all aspects of government procurement, as well as advice on government policies and procurement processes. Paul Burbank is an associate with the Fasken Ottawa office. He works with the Communications Law group to provide advice on telecommunications and broadcasting in Canada. Paul also works with Fasken's Government Relations and Political Law group on strategy and compliance matters. Footnotes 1 The Defence Procurement Outlook for Canada's 43rd Parliament by David Perry, The Global Exchange, 2019 Volume XVII, Issue III; Canadian Global Affairs Institute 2 Global News: With billions at risk, federal parties promise to fix defence, procurement

  • Some changes made to Canadian fighter jet requirements as new document sent to companies

    June 21, 2019 | Local, Aerospace

    Some changes made to Canadian fighter jet requirements as new document sent to companies

    DAVID PUGLIESE Procurement Canada has provided aerospace firms a new draft version of the requirements for Canada's next generation fighter jet fleet. Some changes have been made in the draft request for proposals document to deal with concerns raised by the companies, according to federal government sources. The requirements for the new Canadian fighter jet originally put emphasis on strategic attack and striking at ground targets during foreign missions, according to federal government procurement documents obtained by Postmedia. While the Liberal government had been highlighting the need to buy the jets to protect Canadian airspace and meet the country's commitments to the U.S.-Canadian North American Aerospace Defence Command, the procurement criteria provided additional weight to those aircraft that can excel at ground attack for overseas operations. That criteria was seen to favour Lockheed Martin's F-35 stealth jet, say those industry representatives allied with Lockheed's rivals in the upcoming $19 billion competition. The evaluation criteria also had less emphasis on sustainability, another plus for the F-35 which has been dogged with high maintenance bills, they added. The latest version of the requirements now eases back somewhat on the ground attack role and puts a little more emphasis on air-to-air scenarios, say sources. Some changes have also been made to provide for more points to companies who can provide a better deal on sustainment of the aircraft. Another change affects the length of time a firm has to meet its industrial benefits associated with its proposal. That has increased from 20 years to 25 years. Pat Finn, the Department of National Defence's procurement chief, has said he wants the final request for proposals for the fighter jets out to industry by mid-July. At this point four aircraft are to be considered. Those include two U.S.-built aircraft, the F-35, and the Super Hornet, and two European planes, the Eurofighter Typhoon and the Gripen. The winning bidder will build 88 jets for Canada. The new aircraft will replace the Royal Canadian Air Force's CF-18s. https://ottawacitizen.com/news/national/defence-watch/some-changes-made-to-canadian-fighter-jet-requirements-as-new-document-sent-to-companies

All news