May 13, 2022 | Local, Aerospace, Land
Canada taking ‘comprehensive look’ at joining U.S. ballistic missile defense
Anita Anand: “We are leaving no stone unturned in this major review of continental defense.”
January 30, 2019 | Local, Aerospace
Montreal, 28 January 2019 – Airports Council International (ACI) World has today published an Advisory Bulletin to help airports address the risks posed by drone-related disruption to aircraft operations.
ACI World believes that, while regulators and police will likely be the authority in addressing both enforcement and the preparation of anti-drone measures, all industry stakeholders must work with the relevant agencies to take action to protect the safety of aircraft operations.
The recent disruption caused by the reported drone sightings at London Gatwick Airport – and recent temporary cessation of some operations at London Heathrow Airport and Newark Liberty International Airport following reported sightings of a drone – are the most widely-publicised of a series of incidents which have created debate about the best approach to preparing for – and dealing with – drone-related issues.
ACI's latest Advisory Bulletin proposes that airports lead the discussion and work closely with national authorities and local law enforcement agencies to develop a risk-based approach to dealing with the risks of drone incursions. This approach should take into account the impact on aircraft operations and available mitigation measures including anti-drone actions.
“The recent drone-related disruption at airports in Europe, and their potential impact on airport safety and operations, have raised significant questions for airport operators around the world on their preparedness to handle situations like this,” ACI World Director General Angela Gittens said.
“The highest authority for enforcement activities and initiating anti-drone measures will clearly be the relevant national authority, such as the Civil Aviation Authority in the case of the UK, and local law enforcement agencies.
“It is incumbent on all industry stakeholders, however, to take action to protect the safety of aircraft operations in coordination with these agencies. Airport operators should be aware of national laws and regulations pertaining to drones, with an understanding that these may reside outside of civil aviation.”
The Advisory Bulletin lays out actions that an airport could take to lead the discussion with governments, regulators and law enforcement agencies to strengthen anti-drone measures and mitigations; they include:
ACI World has requested that members share their experience and lessons learnt on anti-drone measures and drone related incidents so that relevant practices can be adopted across the industry.
Notes for editors
May 13, 2022 | Local, Aerospace, Land
Anita Anand: “We are leaving no stone unturned in this major review of continental defense.”
October 18, 2018 | Local, Naval
OTTAWA — Canada's most expensive military project is entering a critical new phase as the government is on the verge of picking its top design for the country's $60-billion fleet of new warships. Defence insiders say the government wants to select a design by the end of the month from among three options submitted by several of the largest defence and shipbuilding companies in the world. After that the government and Halifax-based Irving Shipbuilding, which will actually build the 15 new warships, will sit down with the selected bidder to hammer out the final cost and other details. The stakes will be high for both sides, with hundreds of millions of dollars in play. There will also be pressure to make up for lost time on a project already running behind schedule even though whatever decisions are taken could have ramifications on the navy — and taxpayers — for decades to come. "That's part of the tension between moving quickly and making the right choice," said defence analyst David Perry of the Canadian Global Affairs Institute. The new warships will replace the navy's 12 frigates and three destroyers, the latter of which have already been retired. They will be used for most of this century. Launched in late 2016, the design competition has been the subject of rampant lobbying and complaints by defence industry players, with numerous revisions to the original request for bids and several deadline extensions. That was despite defence officials and Irving having previously warned that time is of the essence when it comes to starting construction, and that they want to shave 18 to 24 months off the project. There have also been questions about Irving's role in the competition, and anger from some companies that British firm BAE was allowed to enter its Type 26 vessel despite the ship having never been built. BAE and U.S.-based defence giant Lockheed Martin partnered together to propose the Type 26 for the design competition, which is up against separate proposals from Dutch firm Alion and Spanish shipbuilder Navantia. A joint French-Italian design was disqualified because Paris-based Naval Group and Italian firm Fincantieri, who promised to build the warships faster and for less than anyone else, did not follow the established process for submitting proposals. One of the big questions heading into the negotiations will be how much the selected design needs to be changed to reflect the navy's needs and how much the navy will have to shift its requirements because changing the design will take more time and money. Irving has warned that it could be forced to lay off hundreds of employees because of a production gap if work on the warships isn't ready to start by the time it finishes building the navy's new Arctic patrol ships in 2021 or 2022. Government negotiators are also facing a battle over the amount of intellectual property that the top bidder will be required to hand over, which Ottawa wants so it can operate and maintain the vessels on its own after they are built. Companies had originally been told that the winner would be required to turn over the full blueprints, but after significant resistance, the two sides agreed that the matter would be negotiated before a contract is awarded. The government however warned that if the winning ship designer drives too hard a bargain on the intellectual property front they face the risk of officials pulling the plug on talks and moving on to the next company. Perry said that while there are many challenges ahead before a deal for a design is signed — and before any of the new warships actually get into the water — this is a critical step forward. "You can't dance until you pick a dance partner," he said. — Follow @leeberthiaume on Twitter. Lee Berthiaume, The Canadian Press https://www.thechronicleherald.ca/news/canada/feds-aiming-to-select-preferred-design-for-60b-warships-by-end-of-month-250594/
September 24, 2018 | Local, Aerospace
DAVID PUGLIESE, OTTAWA CITIZEN The sign-off from the Americans for the 25-jet purchase was needed because the aircraft were built in the U.S. with U.S. technology. The U.S. government has approved Canada's purchase of used F-18 fighter jets from Australia, paving the way for the deal to be completed by the end of the year. The sign-off from the Americans was needed because the aircraft were built in the U.S. with U.S. technology. Dan Le Bouthillier of the Department of National Defence said Friday negotiations with Australia over the sale of the 25 used fighter jets is on-going. “Should all negotiations and approvals move forward as planned, aircraft would start arriving in Canada in 2019, and the project remains on track to achieve this milestone,” he said. “The delivery plan, including mode of delivery, will be finalized once negotiations are complete and the aircraft being purchased are selected.” In June, Postmedia reported that Canada had boosted the number of used Australian fighter jets it is purchasing to 25 from 18 but that the deal still hinged on approval from the U.S. government. Although U.S.-Canada relations have hit a slump, with President Donald Trump vowing to punish Canadians because of ongoing trade disputes, DND officials hope the situation won't affect approvals for the fighter jet sale to proceed. The Liberal government originally announced it would buy 18 used Australian F-18 jets to augment the Royal Canadian Air Force's CF-18s until new aircraft can be purchased in the coming years. But it has added seven more used Australian F-18 aircraft to the deal. Those extra aircraft will be stripped down for parts or used for testing. The exact cost of purchasing the 25 aircraft, along with weapons and other equipment, is not yet known, Procurement Minister Carla Qualtrough pointed out earlier this year. The Liberal government has set aside up to $500 million for the project. Earlier this year, Pat Finn, the Department of National Defence's assistant deputy minister of materiel, said the government has received what's called a letter of cost proposal on the impending sale. “The Australians have now gone to the U.S. State Department for the transfer under ITAR,” Finn explained to MPs on the Commons defence committee at the time. Finn indicated the DND wants to have the deal in place by the end of this year. “The idea of firming this up in the fall of 2018 was for the start of delivery of the two first aircraft to be next summer, and then quickly beyond it,” he added. The federal government has confirmed the Australian aircraft will be operating alongside the RCAF's other CF-18s at Bagotville, Que., and Cold Lake, Alta. “The aircraft will be employed at 3 Wing Bagotville and 4 Wing Cold Lake,” a government official noted. “DND is currently reviewing infrastructure requirements to accommodate the additional aircraft. Any modifications are expected to be minimal as the supplemental jets are of similar age and design to the CF-18.” The Liberal government had planned to buy 18 new Super Hornet fighter jets from U.S. aerospace giant Boeing. But last year Boeing complained to the U.S. Commerce Department that Canadian subsidies for Quebec-based Bombardier allowed it to sell its C-series civilian passenger aircraft in the U.S. at cut-rate prices. As a result, the Trump administration brought in a tariff of almost 300 per cent against the Bombardier aircraft sold in the U.S. In retaliation, Canada cancelled the deal to buy the Super Hornets. That project would have cost more than US$5 billion. https://theprovince.com/news/politics/u-s-approves-canadas-purchase-of-used-australia-fighter-jets-deal-to-be-completed-by-end-of-year/wcm/f39380f7-98e9-45a2-8a7b-525c3eda6901