Back to news

September 27, 2023 | International, Security

In the pipeline: The impact of TSA cybersecurity directives

Continuous monitoring provides real-time visibility into anomalous activities, unauthorized access attempts and potential threats, the author argues.

https://www.c4isrnet.com/opinions/2023/09/27/in-the-pipeline-the-impact-of-tsa-cybersecurity-directives/

On the same subject

  • Secrets of Tempest’s ground-breaking radar revealed

    January 18, 2021 | International, Aerospace, C4ISR

    Secrets of Tempest’s ground-breaking radar revealed

    Tom Kington ROME — Radar engineers on the Tempest fighter program have said they expect to break data-processing records. The secret, they explain, is all about miniaturization and going digital. The sixth-generation jet — planned by the U.K., Sweden and Italy and set to enter service after 2030 — will bristle with new technology, from its weaponry and propulsion to a virtual cockpit projected inside the pilot's helmet. But the group set the bar high in October by announcing the fighter's radar would process a quantity of data equivalent to nine hours of high-definition video — or the internet traffic of a medium-sized city — every second. Few details were given to back up the claim, but now U.K.-based engineers with Italian firm Leonardo, who are working on the radar, have shared clues with Defense News. Boosting performance will mean rethinking today's electronically scanned radars, which have grids of small Transmit Receive Modules, or TRM, on the antenna, each generating an individual radar beam which can follow different targets or combine with others to create a larger beam. The TRMs in the array are formed into groups, and the signals received by each group are fed to a receiver which digitalizes the data before passing it to the radar's processor. Due to their size, the receivers must be positioned back from the aircraft's nose and accept the incoming analogue radar signal down coaxial cables, which incurs some data loss before the signal is digitalized. To remedy that, Leonardo is working on miniaturizing the receivers so they can be moved up into the nose and integrated within the antenna, cutting out the need for a coaxial cable. The data emerging from the receiver must still travel to the processor, but by now it is digital and can flow down fiber-optic cables, reducing data loss. “Miniaturized receivers can digitalize the signal within the antenna much earlier in the receive chain,” said chief engineer Tim Bungey. That's one step up from the new state-of-the-art European Common Radar System Mark 2 radar that BAE Systems and Leonardo have signed to deliver for RAF Eurofighters, which will use coaxial cables. “Digitalizing the data closer to the array means more data can be received and transmitted, the data can be more flexibly manipulated, and there is more potential for using the radar as a multi-function sensor such as for data linking and for electronic warfare,” said Bungey. There is also a second advantage to miniaturized receivers: Many more can be installed, meaning each one handles fewer TRMs. “To improve performance and flexibility within the system, a key challenge is to divide the TRMs into more groups containing fewer TRMs, handled by more receivers,” said Bungey. “By achieving that, together with supporting wider bandwidths, you can generate significantly more data, giving greater flexibility for beam steering and multi-function operation,” he added. “We are aiming to increase the number of groups of TRMs, and therefore the number of receivers, beyond what will be offered by the MK2 radar for Eurofighter,” he added. While the radar may push the envelope, Duncan McCrory, Leonardo's Tempest chief engineer, said it would be a mistake to consider it as a stand-alone component. “The MRFS will be integrated within the wider Tempest Mission System, which incorporates a full suite of electronic-warfare and defensive-aids capabilities, EO/IR targeting and situational awareness systems, and a comprehensive communications system.” he said. “The data captured by these systems will be fused to create a rich situational awareness picture for the aircrew,” he added. “This information will also be fused with data received from other aircraft and unmanned systems, with machine learning used to combine and process the overall situational awareness picture for the aircrew. This avoids information overload in the cockpit, enabling the aircrew to quickly absorb data and make decisions based on suitably processed and validated information, and rapidly respond to threats in highly contested environments,” he said. McCrory added that Leonardo demonstrated aspects of human-machine teaming recently in a trial organized with the British Army and the MoD's Defence Science and Technology Laboratory, in which a Wildcat helicopter crew tasked a semi-autonomous UAV provided by Callen-Lenz to gather imagery and feed it back to the cockpit display via datalink. “It is these human-machine teaming principles that we will be building upon for Tempest,” he said. “The MRFS will be integrated within the wider Tempest Mission System, which incorporates a full suite of electronic-warfare and defensive-aids capabilities, EO/IR targeting and situational awareness systems, and a comprehensive communications system.” he said. “The data captured by these systems will be fused to create a rich situational awareness picture for the aircrew,” he added. “This information will also be fused with data received from other aircraft and unmanned systems, with machine learning used to combine and process the overall situational awareness picture for the aircrew. This avoids information overload in the cockpit, enabling the aircrew to quickly absorb data and make decisions based on suitably processed and validated information, and rapidly respond to threats in highly contested environments,” he said. McCrory added that Leonardo demonstrated aspects of human-machine teaming recently in a trial organized with the British Army and the MoD's Defence Science and Technology Laboratory, in which a Wildcat helicopter crew tasked a semi-autonomous UAV provided by Callen-Lenz to gather imagery and feed it back to the cockpit display via datalink. “It is these human-machine teaming principles that we will be building upon for Tempest,” he said. As Tempest development proceeds, McCrory said design of the integrated mission system was proceeding in parallel with the design of the aircraft itself. “We are effectively designing the aircraft from the inside out; by this I mean we are working closely with the MoD to understand future sensing, communications and effects capability requirements, and then working with the Team Tempest partners to ensure the aircraft can accommodate and support the required avionic systems.” Leonardo is working with BAE Systems to ensure the airframe will accommodate sensors, with Rolls Royce to ensure there is sufficient powering and cooling for the systems, and with MBDA, said McCrory, “to give weapons the best available data prior to launch, and to keep them informed after they are released and receive data back from them as they progress towards the target.” https://www.c4isrnet.com/home/2021/01/15/secrets-of-tempests-ground-breaking-radar-revealed/

  • Contract Awards by US Department of Defense - February 12, 2021

    February 15, 2021 | International, Aerospace, Naval, Land, C4ISR, Security

    Contract Awards by US Department of Defense - February 12, 2021

    AIR FORCE AECOM Technical Services Inc., Los Angeles, California (FA8903-21-D-0002); APTIM Federal Services LLC, Alexandria, Virginia (FA8903-21-D-0001); Atkins Black & Veatch FSB JV, Denver, Colorado (FA8903-21-D-0003); Benham – Mead & Hunt, Oklahoma City, Oklahoma (FA8903-21-D-0005); Burns & McDonnell Inc., Kansas City, Missouri (FA8903-21-D-0006); HDR Environmental, Operations and Construction Inc. Spring Branch, Texas (FA8903-21-D-007); Jacobs Government Services Co., San Antonio, Texas (FA8903-21-D-0008); OTIE-Merrick JV, Milwaukee, Wisconsin (FA8903-21-D-0010); Michael Baker International Inc., Moon Township, Pennsylvania (FA8903-21-D-0004); Parsons Government Services Inc., Pasadena, California (FA8903-21-D-0011); Leo A Daly Co., Minneapolis, Minnesota (FA8903-21-D-0009); Pond-CDM Smith JV LP, Peachtree Corners, Georgia (FA8903-21-D-0012); Tetra Tech Inc., Marlborough, Massachusetts (FA8903-21-D-0013); TransSystems GHD JV, Berkeley, California (FA8903-21-D-0014); Wood Environment & Infrastructure Solutions Inc., Blue Bell, Pennsylvania (FA8903-21-D-015); Woolpert RS&H LLC, Dayton, Ohio (FA8903-21-D-0016); and WSP Mason Hanger JV, Washington, D.C. (FA8903-21-D-0017), have collectively been awarded a $2,000,000,000 indefinite-delivery/indefinite-quantity, multiple award task order contract for architect and engineering services. This contract supports the Air Force worldwide infrastructure design and construction missions, specifically for the Air Force Civil Engineer Center, Air Force Installation Contracting Center, Air Force Life Cycle Management Center and Army Installation Management Command directorates. Work is expected to be completed by February 2026. Fiscal 2021 operation and maintenance funds in the amount of $51,000 are being obligated at the time of award. The 772nd Enterprise Sourcing Squadron, San Antonio, Texas, is the contracting activity. SURVICE Engineering Co. LLC, Belcamp, Maryland, has been awarded an $87,800,749 indefinite-delivery/indefinite-quantity, cost-plus-fixed-fee contract for the Department of Defense (DOD) Information Analysis Center (IAC) Basic Center of Operations. This contract provides for the acquisition, storage, retrieval, synthesis, analysis and dissemination of 22 technical focus areas and scientific technical information for the DOD IAC mission. Work will be performed in Belcamp, Maryland, and is expected to be completed February 2027. This award is the result of a competitive acquisition and two offers were received. No specific funds are being obligated on the basic contract. Fiscal 2021 research, development, test and evaluation funds in the amount of $147,340 will be obligated shortly after award on a separate task order. Air Force Installation Contracting Center, Offutt Air Force Base, Nebraska, is the contracting activity (FA8075-21-D-0001). (This contract was originally announced May 19, 2020, but was not awarded until Feb. 12, 2021) Ampex Data Systems, Hayward, California, has been awarded a $9,999,999 firm-fixed price, indefinite-delivery/indefinite-quantity contract for telemetric electrical system-supplies and ancillary services. The contractor will furnish all personnel, equipment, labor, tools, materials and other items necessary to provide recorders, parts, technical engineering support, upgrades and the ability for maintenance sustainment of airborne data recorders and ground data recorders for the Air Force Test Center at Edwards Air Force Base, California; Eglin AFB, Florida; and other Department of Defense and National Aeronautics and Space Administration continental U.S. activities. Work will be performed at Edwards AFB, California, and is expected to be completed Feb. 11, 2026, and if option is exercised, Feb 11, 2031. This award is the result of a sole-source acquisition. Fiscal 2021 research, development, test and evaluation funds in the amount of $140,000 are being obligated at the time of award. Air Force Test Center, Edwards AFB, California, is the contracting activity (FA9302-21-D-0003). Acierto LLC, Farr West, Utah (FA4686-21-D-0001); Amplified Industrial Inc., Sacramento, California (FA4686-21-D-0002); Polu Kai Tidewater JV, Falls Church, Virginia (FA4686-21-D-0003); Trinity Builders LLC, Plumas Lake, California (FA4686-21-D-0004); and V Lopez Jr & Sons, Santa Maria, California (FA4686-21-D-0005), will compete for each order of a $9,200,000 firm-fixed-price, indefinite-delivery/indefinite-quantity contract for infrastructure repair requirements. Work will consist of multiple disciplines in general construction categories for the military base facilities of Beale Air Force Base, California. Bids were solicited via the government-wide point of entry via solicitation and 10 bids were received. Exact work location and funding will be determined with each order, with an estimated contract completion date of Feb. 11, 2029. Fiscal 2021 operation and maintenance funds will be used with no funds being obligated at the time of award. Air Force Installation Contracting Center, Beale Air Force Base, California, is the contracting activity. Serco Inc., Herndon, Virginia, has been awarded a $7,681,160 modification (P00002) to contract FA2517-20-C-0003 for Ground-based Electro-Optical Deep Space Surveillance system support. Work will be performed in Socorro, New Mexico; Maui, Hawaii; and Diego Garcia, British Indian Ocean Territory, and is expected to be completed April 30, 2022. Fiscal 2021 operation and maintenance funds in the full amount will be obligated the time of award. The total cumulative face value of the contract is $57,097,418. The 21st Contracting Squadron, Peterson Air Force Base, Colorado, is the contracting activity. ARMY Moderna US, Cambridge, Massachusetts, was awarded a $1,650,000,000 modification (P00004) to contract W911QY-20-C-0100 for an additional 100 million doses of SARS-CoV-2 mRNA-1273 Moderna vaccine. Work will be performed in Cambridge, Massachusetts, with an estimated completion date of July 31, 2021. Fiscal 2021 research, development, test and evaluation (Army) funds in the amount of $1,650,000,000 were obligated at the time of the award. U.S. Army Contracting Command, Aberdeen Proving Ground, Maryland, is the contracting activity. (Awarded Feb. 11, 2021) General Dynamics Ordnance and Tactical Systems, Garland, Texas, was awarded an $111,853,284 firm-fixed-price contract for MK80 series general purpose tritonal bomb components. Bids were solicited via the internet with one received. Work will be performed in Garland, Texas, with an estimated completion date of Dec. 30, 2022. Fiscal 2019 and 2020 aircraft procurement (Army) funds in the amount of $111,853,284 were obligated at the time of the award. U.S. Army Contracting Command, Rock Island Arsenal, Illinois, is the contracting activity (W52P1J-21-F-0104). Armtec Countermeasures Co., Coachella, California, was awarded a $24,953,504 firm-fixed-price contract for Flare Aircraft Countermeasure M206 and Flare Aircraft Countermeasure MJU-7A/B. Bids were solicited via the internet with three received. Work will be performed in Camden, Arkansas, with an estimated completion date of Dec. 31, 2026. Fiscal 2019 and 2020 aircraft procurement appropriations funds in the amount of $24,953,504 were obligated at the time of the award. U.S. Army Contracting Command, Rock Island Arsenal, Illinois, is the contracting activity (W52P1J-21-F-0101). NAVY Northrop Grumman Systems Corp., Linthicum, Maryland, is awarded a $236,941,008 modification for the firm-fixed-price portion of previously awarded contract M67854-19-C-0043. The total cumulative face value of the contract is $686,355,923. This modification provides for the exercise of three option contract line items to procure eight Ground/Air Task Oriented Radar Gallium Nitride full rate production systems with associated travel and one lot of the initial provisioning package (spares) in support of Program Executive Officer Land Systems, Quantico, Virginia. Work will be performed in Linthicum, Maryland, and is expected to be complete by Feb. 28, 2024. Fiscal 2021 procurement (Marine Corps) funds in the amount of $236,941,008 will be obligated at the time of award and will not expire at the end of the current fiscal year. The contract modification was not competitively procured. The base contract was not competitively procured pursuant to Federal Acquisition Regulation 6.302-1 and 10 U.S. Code § 2304(c)(1). The Marine Corps Systems Command, Quantico, Virginia, is the contracting activity (M67854-19-C-0043). Association of Consultants and Engineers,* Leonardtown, Maryland, is awarded a maximum amount $30,000,000 indefinite-delivery/indefinite-quantity contract for multi-media environmental compliance services, with an emphasis on storm water, wastewater and drinking water for the Naval Facilities Engineering Systems Command (NAVFAC), Washington, D.C., area of operations (AO) and U.S. territories. All work on this contract will be performed in the Washington, D.C., AO and U.S. territories. The term of the contract is not to exceed 66 months with an expected completion date of August 2026. Fiscal 2021 operation and maintenance (Navy) (OM,N) contract funds in the amount of $10,000 for guaranteed minimum are obligated at time of award and will expire at the end of the current fiscal year. Future task orders will be primarily funded by OM,N. This contract was competitively procured via the beta.SAM.gov website with eight proposals received. NAVFAC Washington, Washington, D.C., is the contracting activity (N40080-21-D-0013). Cianbro Corp., Pittsfield, Maine, is awarded a $20,850,000 firm-fixed-price contract modification for dredging requirements to support multi-mission Dry Dock #1 extension located at the Portsmouth Naval Shipyard. After award of this modification, the total cumulative contract value will be $197,615,254. Work will be performed in Kittery, Maine, and is expected to be completed by March 2022. Fiscal 2021 military construction (Navy) contract funds in the amount of $20,850,000 are obligated on this award and will not expire at the end of the current fiscal year. The Naval Facilities Engineering Systems Command, Mid-Atlantic, Norfolk, Virginia, is the contracting activity (N40085-20-C-8500). EPS Corp., Tinton Falls, New Jersey, is awarded a $10,017,166 cost-plus-fixed-fee and firm-fixed price modification to previously awarded indefinite delivery/indefinite quantity contract N00174-17-D-0026 to exercise an option for technical expertise in the development and testing of underwater weapons and underwater weapons systems components. Work will be performed in Tinton Falls, New Jersey (95%); and Cagliari, Italy (5%), and is expected to be completed by February 2022. No additional funds are being obligated at the time of this action. The Naval Surface Warfare Center, Indian Head Division, Indian Head, Maryland, is the contracting activity. L3 Harris Technologies Inc. Anaheim, California, is awarded an $8,203,414 cost-plus-fixed-fee contract modification (P00038) for options under previously awarded and announced contract N00030-18-C-0001. The work will provide services and support for Flight Test Instrumentation (FTI) systems. Work will be performed in Anaheim, California (60 %); Cape Canaveral, Florida (25 %); and Washington, D.C. (15%), with an expected completion date of Oct. 12, 2022. Fiscal 2021 operation and maintenance (Navy) funds in the amount of $3,021,941 will be obligated at time of this award and will expire at the end of the current fiscal year. Fiscal 2021 other procurement (Navy) funds in the amount of $2,423,298; fiscal 2021 weapons (Navy) funds in the amount of $1,814,175; and fiscal 2021 United Kingdom funds in the amount of $944,000, are being obligated at time of this award and will not expire at the end of the fiscal year. This contract modification is being awarded to the contractor on a sole-source basis under 10 U.S. Code 2304(c)(1) and was previously synopsized on the Federal Business Opportunities (now beta.SAM.gov) website. Strategic Systems Programs, Washington, D.C., is the contracting activity. DEFENSE ADVANCED RESEARCH PROJECTS AGENCY General Atomics Aeronautical Systems Inc. Poway, California, was awarded a $9,037,064 cost-plus-fixed-fee contract for the Longshot Phase One. This contract provides for the research, development, and demonstration of the Longshot. Work will be performed in Poway, California (71%); Orlando Florida (14%); Buffalo, New York (7%); Kirkland, Washington (5%); and Pontiac, Michigan (3%), with an estimated completion date of February 2022. Research and development funds in the amount of $2,141,687 are being obligated at the time of award. This contract is a limited sources competitive acquisition in accordance with the original broad agency announcement, HR0011-20-S-0037. The Defense Advanced Research Projects Agency, Arlington, Virginia, is the contracting activity (HR0011-21-C-0023). DEFENSE LOGISTICS AGENCY Dominion Energy South Carolina Inc., Cayce, South Carolina, has been awarded a $10,758,408 modification (P00009) to 50‐year contract SP0600‐18‐C‐8326, with no option periods for the ownership, operation and maintenance of the natural gas distribution utility systems at Fort Jackson, South Carolina. This is a fixed‐price with economic‐price‐adjustment contract. Location of performance is South Carolina, with a Nov. 18, 2069, performance completion date. Using military service is Army. Type of appropriation is fiscal 2019 through 2070 Army operation and maintenance funds. The contracting activity is the Defense Logistics Agency, Energy, Fort Jackson, South Carolina. Lovell Government Services LLC, Pensacola, Florida, has been awarded a maximum $9,653,838 fixed-price with economic-price-adjustment, indefinite-delivery/indefinite-quantity contract for medical and surgical supplies. This was a competitive acquisition with 41 responses received. This is a five-year contract with no options. Location of performance is Florida, with a Feb. 11, 2026, ordering period end date. Using customers are Army, Navy, Air Force, Marine Corps and federal civilian agencies. Type of appropriation is fiscal 2021 through 2026 defense working capital funds. The contracting activity is the Defense Logistics Agency, Troop Support, Philadelphia, Pennsylvania (SPE2DE-21-D-0013). *Small business https://www.defense.gov/Newsroom/Contracts/Contract/Article/2503055/source/GovDelivery/

  • US Army seeking APS technology for Bradley vehicles

    December 14, 2018 | International, Land, C4ISR

    US Army seeking APS technology for Bradley vehicles

    Ashley Roque, Washington, DC - Jane's Defence Weekly Once again the US army is looking for new active protection systems (APSs) to equip on its family of M2 Bradley infantry fighting vehicles. Whether this is a positive or negative for IMI Systems' Iron Fist remains unclear. On 11 December, the service issued a draft request for proposal in the form of a "market survey" for APSs with a technology readiness level (TRL) 6. "This APS shall have been proven and characterised on the Bradley Family of Vehicles [FOV]," the service wrote in a short notice. "This will be accomplished through the procurement of a B-Kit, consisting of the system and countermeasures." Industry has until 18 December to respond. Recently, the service has been evaluating three APSs: Rafael's Trophy on the Abrams main battle tank (MBT), IMI Systems' Iron Fist on the M2 Bradley, and Artis' Iron Curtain on the Stryker infantry combat vehicle. In June Leonardo DRS (Rafael's US-based partner) was awarded USD193 million to integrate the capability on Abrams MBTs. Artis' Iron Curtain system, however, was cut due to a lack of maturity. IMI Systems' Iron Fist is now uncertain, and the company and an army spokeswoman did not immediately respond to Jane's request for information. Colonel Glenn Dean, project manager for Stryker Brigade Combat Team and APS acquisition, told reporters in August that IMI's Iron Fist technology was still participating in Phase I live-fire and automotive characterisation testing due to an eight-month delay caused by funding gaps, inclement weather, and integration challenges. At the time, he noted that the findings would be turned over to the Army Requirements Oversight Council in the first quarter of fiscal year 2019 for a decision on how to proceed. He also explained that the M2 Bradley is a "very difficult platform to install on". https://www.janes.com/article/85180/us-army-seeking-aps-technology-for-bradley-vehicles

All news