Back to news

March 22, 2023 | International, Other Defence

How the war in Ukraine is driving growth in Arkansas

The city of Camden is hoping to expand as defense contractors there ramp up production to supply arms to Ukraine and replenish American stockpiles.

https://www.defensenews.com/industry/2023/03/21/how-the-war-in-ukraine-is-driving-growth-in-arkansas/

On the same subject

  • Contract Awards by US Department of Defense - December 14, 2020

    December 17, 2020 | International, Aerospace, Naval, Land, C4ISR, Security

    Contract Awards by US Department of Defense - December 14, 2020

    AIR FORCE Northrop Grumman Systems Corp., Clearfield, Utah, has been awarded a $185,700,000 indefinite-delivery/indefinite-quantity contract for the A-10 Aircraft Structural Integrity Program (ASIP) Legacy VII. This contract provides for sustaining engineering services of A-10 aircraft. Work will be performed in Clearfield, Utah, and is expected to be completed by Dec. 13, 2030. This award is the result of a sole-source acquisition. Fiscal 2021 operation and maintenance funds in the amount of $6,480,694 are being obligated at the time of award. The Air Force Life Cycle Management Center, Hill Air Force Base, Utah, is the contracting activity (FA8202-21-D-0001). Northrop Grumman Systems Corp., Linthicum Heights, Maryland, has been awarded a $163,650,543 requirements contract for the supply chain management of the APY-1/2 surveillance radar systems used on Airborne Warning and Control Systems aircraft. The contract provides for repairs, sustaining spares and engineering services relating to the APY-1/2 systems. Work will be performed in Linthicum Heights, Maryland, and is expected to be completed Sept. 9, 2028. This award is the result of a sole-source acquisition. Fiscal 2021 defense working capital funds are being used and no funds are being obligated at the time of the award. The Air Force Sustainment Center, Robins Air Force Base, Georgia, is the contracting activity (FA8524-21-D-0006). The Boeing Co., St. Louis, Missouri, has been awarded a $79,569,583 firm-fixed-price contract for F-15 Eagle Passive Active Warning and Survivability System low rate initial production. Work will be performed in San Antonio, Texas, and is expected to be completed by Dec. 31, 2026. This award is the result of a sole-source acquisition. Fiscal 2020 production funds in the full amount are being obligated at the time of award. The Air Force Life Cycle Management Center, Wright-Patterson Air Force Base, Ohio, is the contracting activity (FA8634-21-C-2702). Northrop Grumman Systems Corp., McLean, Virginia, has been awarded a $13,464,704 requirements contract for the repairs, sustaining spares and engineering services relating to the Aircraft Alerting Communication Electromagnetic Pulse system. Work will be performed in Albuquerque, New Mexico, and is expected to be completed by Sept. 9, 2028. This award is the result of a sole-source acquisition. Fiscal 2021 defense working capital funds will be used with no funds being obligated at the time of award. The Air Force Sustainment Center, Robins Air Force Base, Georgia, is the contracting activity (FA8524-21-D-0001). DEFENSE LOGISTICS AGENCY Science Applications International Corp., Fairfield, New Jersey, has been awarded a maximum $90,000,000 firm-fixed-price contract for facilities maintenance, repair and operations items. This was a sole-source acquisition using justification 10 U.S. Code 2304 (c)(1), as stated in Federal Acquisition Regulation 6.302-1. This is a one-year bridge contract with no option periods. Locations of performance are New Jersey, Hawaii, Guam and the Kwajalein Atoll, with a Dec. 14, 2021, performance completion date. Using military services are Army, Navy, Air Force, Marine Corps and Coast Guard. Type of appropriation is fiscal 2021 through 2022 defense working capital funds. The contracting activity is the Defense Logistics Agency Troop Support, Philadelphia, Pennsylvania (SPE8E3-21-D-0004). NAVY Raytheon Missiles and Defense, Tewksbury, Massachusetts, was awarded a $59,414,933 firm-fixed-price, cost-plus-incentive-fee, cost-plus-fixed-fee, and cost modification to previously awarded contract N00024-17-C-5145 to exercise options for DDG 1000 ship class integrated logistics support, engineering services and procurement of M5 call servers. The total ship activation (TSA) contract includes mission system activation and hull mechanical and electrical activation efforts to include waterfront integration, activation and test of Zumwalt class mission systems and mission system equipment at the system and subsystem levels; development and conduct of the Zumwalt class TSA test program; personnel, program management, planning, training and other efforts required to effectively support the execution of the Zumwalt class TSA; development and review of design drawings, technical data packages, installation control drawings and change documentation in support of Zumwalt class TSA; and development and implementation of government-approved proposed changes and the implementation of Zumwalt class cybersecurity/information assurance requirements. Work will be performed in San Diego, California (42%); Portsmouth, Rhode Island (27%); Tewksbury, Massachusetts (22%); Bath, Maine (7%); Ft. Wayne, Indiana (1%); and Marlboro, Massachusetts (1%), and is expected to be completed by December 2021. Fiscal 2020 shipbuilding and conversion (Navy); fiscal 2021 research, development, test and evaluation (Navy); and fiscal 2021 other procurement (Navy), funding in the amount of 5,489,262 will be obligated at time of award and will not expire at the end of the current fiscal year. This contract was procured under the statutory authority of 10 U.S. Code 2304(c)(1); only one responsible source and no other supplies or services will satisfy agency requirements. The Naval Sea Systems Command, Washington, D.C., is the contracting activity. (Awarded Dec. 11, 2020) BAE Systems, Information and Electronic Systems Integration Inc., Greenlawn, New York, is awarded an $18,003,287 firm-fixed-price, indefinite-delivery/indefinite-quantity contract. This contract provides for the production, test and delivery of up to five Mode 5 capable AN/APX-117A(V) systems; one Mode 5 capable AN/APX-118A(V) system; 308 Mode 5 capable AN/APX-123A(V) common identification friend or foe digital transponder systems; 289 Mode 5 kits; and associated shop replaceable assemblies and repairs incident to modification in support of fixed and rotary winged aircraft for the Navy, Army and non-Department of Defense participants. Work will be performed in Greenlawn, New York (85%); and Austin, Texas (15%), and is expected to be completed in December 2026. No funds will be obligated at time of award. Funds will be obligated on individual orders as they are issued. This contract was not competitively procured pursuant to Federal Acquisition Regulation 6.302-1. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity (N00019-21-D-0008). Raytheon Missiles and Defense, Tucson, Arizona, is awarded a $17,765,396 cost-plus-fixed-fee modification to previously awarded contract N00024-16-C-5433 to exercise options in support Evolved SeaSparrow missile design agent, in-service support and technical engineering support services. Work will be performed in Tucson, Arizona (91%); Hengelo Ov, Netherlands (2%); Raufoss, Norway (2%); Ottobrunn, Germany (1%); Richmond, Australia (1%); and various locations with less than 1% each (3%), and is expected to be completed by June 2021. This contract combines purchases for the U.S. government and other country funds (NATO consortium members, non-Foreign Military Sales (FMS) (99%); and the government of Japan (1%) under the FMS program. Fiscal 2021 other country funds in the amount of $9,772,474 (55%); 2021 weapons procurement (Navy) funds in the amount of $5,127,125 (29%); 2020 weapons procurement (Navy) funds in the amount of $2,354,250 (13%); 2021 research, development, testing and evaluation (Navy) funds in the amount of $399,547 (2%); and FMS (Japan) funds in the amount of $112,000 (1%) will be obligated at time of award and will not expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, D.C., is the contracting activity. GBD JV,* Aberdeen, Maryland, is being awarded a $13,000,000 firm-fixed-price modification to increase the maximum dollar value of an indefinite-delivery/indefinite-quantity contract for new paving, paving repair and/or replacement of various types of paving within Naval Facilities Engineering Command (NAVFAC) Washington area of responsibility (AOR). The work to be performed provides for new paving, paving repair and/or replacement of various types of paving such as roadways, airfields, sidewalks, curbs, gutters, etc. Other incidental types of work, including but not limited to, demolition, site preparations and site drainage are also included in the scope of work. Paving and associated work may be ordered for industrial, commercial and residential locations indicated with each task order. After award of this modification, the total cumulative contract value will be $63,000,000. Work will be performed in the NAVFAC Washington AOR, including but not limited to, Maryland (40%); Virginia (40%); and Washington, D.C. (20%). The term of the contract is not to exceed 48 months with an expected completion date of April 2021. No funds will be obligated at time of award and funds will be obligated on individual task orders as they are issued. Future task orders will be primarily funded by military construction (Navy); operation and maintenance (O&M) (Navy); O&M (Marine Corps); and Navy working capital funds. NAVFAC Washington, Washington, D.C., is the contracting activity (N40080-17-D-0033). Forward Slope Inc., San Diego, California, is being awarded an $11,323,595 modification P00008 to previously awarded requirements-type contract N66001-18-D-0117 to provide command, control, communications, intelligence, surveillance and reconnaissance (C4ISR) planning and design services in support of shore installation projects. This one-year modification increases the overall value of the existing contract to $34,867,630. The period of performance is from Jan. 11, 2021, through Jan. 10, 2022. Work will be performed at the contractor's facilities in San Diego, California (50%); and Hawaii (50%). Contract funds will not expire at the end of the fiscal year. No funds will be obligated at the time of award. Fiscal 2021 operation and maintenance (Navy) funds will be obligated as individual task orders are issued. This contract was originally competitively procured via request for proposal N66001-17-R-0002 published on the beta.SAM.gov website. Eight offers were received and one was selected for award. The Naval Information Warfare Center Pacific, San Diego, California, is the contracting activity (N66001-18-D-0117). ARMY InSap Services Inc., Marlton, New Jersey, was awarded a $24,507,978 modification (BA0250) to contract W91QUZ-11-D-0017 for enterprise application services support to the Army's Logistics Modernization Program. Work will be performed in Marlton, New Jersey, with an estimated completion date of Dec. 14, 2020. Fiscal 2020 civil consolidated working funds in the amount of $10,394,401 were obligated at the time of the award. The U.S. Army Contracting Command, Rock Island Arsenal, Illinois, is the contracting activity. Oakland Consulting Group, Lanham, Maryland, was awarded a $12,407,852 modification (BA0236) to contract W91QUZ-11-D-0018 for enterprise application services support to the Army's Logistics Modernization Program. Work will be performed in Lanham, Maryland, with an estimated completion date of March 31, 2021. Fiscal 2020 civil consolidated working funds in the amount of $4,359,142 were obligated at the time of the award. The U.S. Army Contracting Command, Rock Island Arsenal, Illinois, is the contracting activity. Avion Solutions Inc., Huntsville, Alabama, was awarded an $8,820,564 modification (000337) to contract W31P4Q-18-A-0047 for logistics support for the Unmanned Aircraft Systems project manager's office. Work will be performed in Huntsville, Alabama, with an estimated completion date of Aug. 31, 2021. Fiscal 2021 operation and maintenance (Army) funds in the amount of $8,820,564 were obligated at the time of the award. The U.S. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity. *Small business https://www.defense.gov/Newsroom/Contracts/Contract/Article/2446305/source/GovDelivery/

  • Did F-35 Testing for Extreme Weather Conditions Fall Short?

    June 21, 2019 | International, Aerospace

    Did F-35 Testing for Extreme Weather Conditions Fall Short?

    By Oriana Pawlyk SALON DU BOURGET, PARIS -- More than 400 F-35 Joint Strike Fighters are operating from 17 bases worldwide. From the near-Arctic region of Ørland, Norway, to a recent deployment in the Middle East, the fifth-generation jet is expanding its reach. But a recent news report shows that weather conditions have some effect on the Pentagon's stealthy fifth-gen fighter, raising concerns about its performance in extreme climate locations. In a recent Defense News report series, the outlet obtained documents showing that cold weather triggered a battery sensor in an F-35 Lightning II in Alaska. While the battery was not affected, the weather "overwhelm[ed] the battery heater blanket" that protects it, prompting the sensor to issue a warning and causing the pilot to abort his mission and land immediately, Defense News said. "We have already developed an update to the software and the battery's heater control system to resolve this issue, and this updated software is available for users today to load on their aircraft in the event they will be conducting extreme cold weather operations," Greg Ulmer, vice president of Lockheed's F-35 aircraft production business, said in an interview with Military.com at the Paris Air Show, adding the update will be in new planes by 2021. The U.S. military anticipated taking the Lockheed Martin-made F-35 around the world, with partners and allies flying the plane in both hot and cold regions, including some that are changing. "The [F-22 Raptor] and plenty of other aircraft have flown out [to Alaska] just fine for decades," Rebecca Grant of IRIS Independent Research told Defense News. Grant is a former director of the Mitchell Institute for Airpower Studies at the Air Force Association. "The F-35 should have had all that sorted out in the climatic lab." Ulmer, however, said all necessary steps were taken in lab testing, and the issue identified was a normal part of the design and development process. "You do the best you can relative to the engineering, understanding of the environment, to design the part. And then you actually perform, and [you realize] your model was off a little bit, so you have to tweak the design ... to account for it," Ulmer said. An F-35A from Hill Air Force Base, Utah, was on static display here during the show. "We're confident in the F-35s performance in all weather conditions," he said. The battery issue was first discovered during extreme cold weather testing at -30 degrees and below at Eielson Air Force Base, Alaska, in February 2018, he added. Ulmer explained there are various tests points done before the plane heads to the McKinley Lab at Eglin Air Force Base, Florida, for robust experiments. The lab is responsible for high-range weather testing of military and commercial aircraft, munitions and weapons. The lab's refrigeration chamber can go as low as -70 degrees, lab chief Dwayne Bell told Military.com during a visit to the facility in 2017. He said at the time that the F-35 program had been one of the most expensive programs tested in the lab to date. There's a wide range of testing costs, but they average roughly $25,000 a day, he said. It cost about $7 million to test the Marine Corps' B-model from the Patuxent River Integrated Test Force, Maryland, over a six-month period, Bell said. The Lightning II was put through major weather testing -- the lab can do everything but lightning strikes and tornadoes -- such as wind, solar radiation, fog, humidity, rain intrusion/ingestion, freezing rain, icing cloud, icing build-up, vortex icing and snow. It handled temperatures ranging from 120 degrees Fahrenheit to -40 degrees, officials said in 2017. But even testing at McKinley is limiting, Ulmer said. "What doesn't happen is that they don't stay there a long time, so once we released [Block] 3F [software] capability, now the operational fleet can actually" test new extremes, he said, referring to both speed and temperature changes. Defense News also found that supersonic speeds caused "bubbling and blistering" on the JSF's low-observable stealth coating, and that hot environments impeded sufficient engine thrust to vertically land the Marine variant. "So they take it" to new environments "and they expose it more than flight test exposed the airplane. I'm an old flight test guy. You expect to learn in the operational environment more than you do in the [developmental test] environment because you don't necessarily fly the airplane [in that environment] all the time," Ulmer said. "So we learned a little bit, and you refine the design, and you solve it," he said, adding that the design and maintenance tweaks are ongoing. "The probability of the issue reoccuring on aircraft in the operational fleet is very low and with minimal impact to safety of flight or operational performance." Thirteen Category 1 deficiencies were found and reported by operators, according to the for-official-use-only documents Defense News obtained. Cat 1 is a label for problems that would directly impact safety or the mission. Those ranged from coating fixes; pressure anomalies in the cockpit that gave pilots ear and sinus pain; and washed-out imagery in the helmet-mounted display, among others. The Air Force, Navy and Marine Corps each fly a variant of the aircraft designed for different scenarios, from landing on conventional runways on land, to catching arresting cables on aircraft carriers, to landing like a helicopter on amphibious assault ships. Responding to the Defense News article series, Lockheed Martin said each deficiency "is well understood, already resolved or on a near-term path to resolution." "We've worked collaboratively with our customers, and we are fully confident in the F-35's performance and the solutions in place to address each of the items identified," the company said in a statement June 12. Growing pains with new planes and weapons programs are common. But the F-35 program has been under scrutiny since its inception, mainly for cost-effectiveness and functionality. A new estimate suggests that operating and supporting fighters for the next 60-plus years will cost the government $1.196 trillion. The older F-22 Raptor has had similar issues, especially with its stealth coating, which officials have said is more cumbersome to fix than the F-35, which was built with a more functional and durable coating in mind. "The [low-observable] system has significantly improved on the F-35 when compared to the F-22," Ulmer said Tuesday. "That's all lessons learned from F-22, applied to F-35." https://www.military.com/daily-news/2019/06/20/did-f-35-testing-extreme-weather-conditions-fall-short.html

  • U.S. Air Force’s Newest Fighter Completes First Exercise

    May 27, 2021 | International, Aerospace

    U.S. Air Force’s Newest Fighter Completes First Exercise

    Participation in Northern Edge in Alaska provided the combined F-15EX Eagle II test team with a chance to wring out the new fighter in a major exercise.

All news