Back to news

April 25, 2019 | Local, Aerospace

Charlie Bouchard steps down from Lockheed Martin Canada’s top job

DAVID PUGLIESE, OTTAWA CITIZEN

Charles Bouchard announced his decision Wednesday to retire as Chief Executive, Lockheed Martin Canada effective April 30. Bouchard, a retired lieutenant general, served in the role for nearly six years. He had a 37-year career in the Royal Canadian Air Force.

“I have thoroughly enjoyed serving Lockheed Martin Canada and Lockheed Martin Corporation and while the time has come for me to retire, I will remain an ardent supporter and advocate of the work Lockheed Martin does to deliver the best equipment to today's modern warfighter, the F-35 being a primary example,” Bouchard said in a statement.

Lorraine Ben will serve as Interim Chief Executive.

https://ottawacitizen.com/news/national/defence-watch/charlie-bouchard-steps-down-from-lockheed-martin-canadas-top-job

On the same subject

  • This new tool lets brigades ‘see’ their electronic warfare footprint

    December 12, 2024 | Local, Land

    This new tool lets brigades ‘see’ their electronic warfare footprint

    A handful of operational U.S. Army brigades now have a tool to “see” how they and enemy forces look in the otherwise invisible electromagnetic spectrum.

  • Air Canada and AAR Conclude $500M CAD Agreement for Airframe Maintenance in Québec, Canada

    September 19, 2017 | Local, Aerospace

    Air Canada and AAR Conclude $500M CAD Agreement for Airframe Maintenance in Québec, Canada

    AAR CORP and Air Canada announced that they have signed a 10-year agreement to provide airframe maintenance for the airline's Airbus narrow-body fleet of A319, A320 and A321 aircraft, as well as a new five-year agreement for Air Canada's Embraer E190 fleet AAR will perform the work at its Maintenance, Repair and Overhaul (MRO) facility at Trois-Rivières Airport in Québec, previously known as Premier Aviation. https://www.otcmarkets.com/stock/ACDVF/news?id=170182

  • Frigate design decision challenged in Federal Court, putting $60B program in limbo

    November 23, 2018 | Local, Naval

    Frigate design decision challenged in Federal Court, putting $60B program in limbo

    Murray Brewster · CBC News Winning bid 'incapable of meeting three critical mandatory requirements,' says Alion Canada One of the losing bidders in the competition to design the navy's next generation of warships has asked the Federal Court to overturn the recent decision to award the contract to a group of companies led by Lockheed Martin Canada. Alion Science and Technology Corp. and its subsidiary, Alion Canada, asked for a judicial review on Friday — a challenge that could mean more delays to the $60 billion program. The company had pitched the Dutch-designed De Zeven Provinciën Air Defence and Command (LCF) frigate as their solution for the Canadian navy. It's asking the court to set aside an Oct. 19 decision to select Lockheed Martin Canada the preferred bidder and to prevent the federal government from entering into negotiations with the company, which has offered up the BAE Systems-designed Type 26 frigate. In their court filing, Alion officials argue that the winning bid was "incapable of meeting three critical mandatory requirements" of the design tender. Notably, they say the Type 26 cannot meet the mandatory speed requirements set out by the navy and that both Public Services and Procurement Canada and Irving Shipbuilding, the yard overseeing the construction, should have rejected the bid outright. Alion said it "submitted a fully-compliant and conforming bid at enormous expense" and argued it "has been denied the fair treatment (it was) owed." The court application also points out that the design tender was amended 88 times during the 22 months it was under consideration and that the changes "effectively diluted the [warship] requirements" and allowed the government and Irving to select "an unproven design platform." Rising cost estimates Over two years ago, the Liberal government said it wanted to select a "mature design" for the new frigates, rather than designing a warship from scratch. Former public works minister Judy Foote said it would be a faster, cheaper solution. Unlike its two competitors, the Type 26 has yet to enter service with the Royal Navy and competitors have privately knocked it as "paper ship." Navantia, a Spanish-based company, was the other failed bidder. It headed a team that included Saab and CEA Technologies and proposed the F-105 frigate design, a ship in service with the Spanish navy. The Liberal government plans to build 15 new warships and hoped to get construction underway in the early 2020s. The program, which has been beset with delays and rising cost estimates, is intended to replace the navy's aging Halifax-class frigates, the backbone of the nation's maritime fighting force. Federal procurement officials had hoped to nail down a complete design contract with Lockheed Martin by the winter. The court challenge now puts that timeline in doubt. It also has enormous implications for Irving, which has been concerned about a slowdown in warship production between the current Arctic Offshore Patrol Ship program and the frigate replacements, which are formally titled 'Canadian Surface Combatants'. No one at Public Works or Lockheed Martin was immediately available for comment on Wednesday. https://www.cbc.ca/news/politics/frigate-design-decision-challenged-in-federal-court-putting-60b-program-in-limbo-1.4915501

All news