Back to news

July 26, 2022 | International, Aerospace

Airbus a testé son avion de transport A400M comme bombardier d'eau

Airbus a effectué des tests pour transformer l'avion de transport militaire A400M en bombardier d'eau à l'aide de citernes amovibles.

https://www.journaldemontreal.com/2022/07/26/airbus-a-teste-son-avion-de-transport-a400m-comme-bombardier-deau

On the same subject

  • Contract Awards by US Department of Defense - November 04, 2019

    November 5, 2019 | International, Aerospace, Naval, Land, C4ISR, Security

    Contract Awards by US Department of Defense - November 04, 2019

    DEFENSE LOGISTICS AGENCY Brothers Produce Inc.,* Friendswood, Texas, has been awarded a maximum $202,500,000 firm-fixed-price with economic-price-adjustment, indefinite-delivery/indefinite-quantity contract for fresh fruits and vegetables. This was a competitive acquisition with one response received. This is a 60-month contract with no option periods. Location of performance is Texas, with a Nov. 3, 2024, performance completion date. Using customers are Department of Agriculture schools. Type of appropriation is fiscal 2020 through 2024 defense working capital funds. The contracting activity is the Defense Logistics Agency Troop Support, Philadelphia, Pennsylvania (SPE300-20-D-S736). Hesco Bastion Inc., North Charleston, South Carolina, has been awarded a maximum $24,000,000 firm-fixed-price, indefinite-delivery/indefinite-quantity contract for the Expeditionary Barrier System. This is a 10-month, 300-day bridge contract. Locations of performance are South Carolina and the United Kingdom with a Sept. 1, 2020, performance completion date. Using military services are Army, Navy, Air Force and Marine Corps. Type of appropriation is fiscal 2020 defense working capital funds. The contracting activity is the Defense Logistics Agency Troop Support, Philadelphia, Pennsylvania (SPE8E6-20-D-0001). Frank Gargiulo & Son Inc.,* Hillside, New Jersey, has been awarded a maximum $16,483,500 firm-fixed-price with economic-price-adjustment, indefinite-delivery/indefinite-quantity contract for fresh fruits and vegetables. This was a competitive acquisition with one response received. This is a 54-month contract with no option periods. Locations of performance are New Jersey and New York, with a May 3, 2024, performance completion date. Using customers are Department of Agriculture schools. Type of appropriation is fiscal 2020 through 2024 defense working capital funds. The contracting activity is the Defense Logistics Agency Troop Support, Philadelphia, Pennsylvania (SPE300-20-D-S737). NAVY Bell-Boeing Joint Project Office, Amarillo, Texas, is awarded a $146,039,547 modification (P00025) to a previously awarded cost-plus-fixed-fee, fixed-price-incentive-firm-target and firm-fixed-price contract (N00019-17-C-0015). This modification exercises the option to upgrade nine MV-22 aircraft from the Block B to the Block C configuration, as well as planned maintenance intervals for eight MV-22 aircraft, in support of the Common Configuration-Readiness and Modernization (CC-RAM) program. Work will be performed in Ridley Park, Pennsylvania (91%); and Fort Worth, Texas (9%), and is expected to be completed in March 2022. Fiscal 2018 and 2020 aircraft procurement (Navy - AP, N); and fiscal 2020 operation and maintenance (Navy – OM, N) funds in the amount of $146,039,547 will be obligated at time of award, $6,049,632 of which will expire at the end of the current fiscal year (Funding: fiscal 2018 AP, N $5,654,683; fiscal 2020 AP, N $139,989,915; and fiscal 2020 OM, N $394,949). The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. Lockheed Martin Space, Titusville, Florida, is awarded a $40,304,886 cost-plus-incentive-fee and cost-plus-fixed-fee modification (P00002) to exercise options under a previously awarded contract (N00030-19-C-0100) for TRIDENT II (D5) missile production and deployed systems support. Work will be performed in Denver, Colorado (28%); Sunnyvale, California (25.2%); Biddeford, Maine (14.7%); Cape Canaveral, Florida (12.5%); Clearwater, Florida (9.8%); Oak Ridge, Tennessee (4.4%); Scottsdale, Arizona (2.2%); and other various locations (less than 1% each, 3.2% total). Work is expected to be completed Sept. 30, 2024. Fiscal 2020 weapons procurement (Navy) funds in the amount of $32,016,540; and fiscal 2020 other procurement (Navy) funds for $8,288,346 are being obligated on this award, none of which will expire at the end of the current fiscal year. This contract was awarded to the contractor on a sole source basis under 10 U.S. Code 2304(c)(1) and was previously synopsized on the Federal Business Opportunities website. Strategic Systems Programs, Washington, District of Columbia, is the contracting activity. The Boeing Co., St. Louis, Missouri, is awarded a $34,230,269 firm-fixed-price delivery order (N00019-20-F-0331) against a previously issued basic ordering agreement (N00019-16-G-0001). This order provides for the non-recurring engineering, logistics product data, 28 Group A-1 retrofit kits, 28 Group A-2 retrofit kits, and 28 Group B retrofit kits for incorporation of the Distributed Targeting Processor-Network into the F/A-18 aircraft for the Navy and the Government of Australia. Work will be performed in St. Louis, Missouri (99%); China Lake, California (0.5%); and Whidbey Island, Washington (0.5%), and is expected to be completed in June 2022. Fiscal 2019 aircraft procurement (Navy) funds in the amount of $33,816,097; and Foreign Military Sales funds in the amount of $414,172 will be obligated at time of award, none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. Lockheed Martin Corp., Orlando, Florida, is awarded a $20,700,000 firm-fixed price contract for the design, fabrication, procurement, delivery, installation, integration, configuration, technical documentation, test, modernization and concurrency of the Littoral Combat Ship Freedom Variant Integrated Tactical Trainer devices installed at Naval Station Mayport, Florida; and Naval Station San Diego, California. Work will be performed in Orlando, Florida (51%); Moorestown, New Jersey (35%); Baltimore, Maryland (8%); Clearwater, Florida (3%); and Marion, Massachusetts (3%), and is expected to be completed in March 2022. Fiscal 2019 other procurement (Navy) funds in the amount of $20,700,000 will be obligated at time of award, none of which will expire at the end of the current fiscal year. This contract was not competitively procured pursuant to U.S. Code 2304(c)(1). The Naval Air Warfare Center Training Systems Division, Orlando, Florida, is the contracting activity (N61340-20-C-0003). Sikorsky Aircraft Corp., Stratford, Connecticut, is awarded a $20,324,973 modification (P00272) to a previously awarded cost-plus-incentive-fee contract (N00019-06-C-0081) to provide System Demonstration Test Article Aircraft (SDTA) to support various test requirements under the System Development and Demonstration (SDD) program. The purpose of this contract modification is to definitize the costs associated with the instrumentation and transition of the aircraft between SDD and SDTA. Work will be performed in Stratford, Connecticut, and is expected to be completed in February 2021. No funding is included in this contract modification; this requirement will be incrementally funded. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. ARMY High Desert Support Services, Alexandria, Virginia, was awarded a $30,000,000 modification (P00019) to contract W9124B-18-C-0004 for installation support services. Work will be performed in Fort Irwin, California, with an estimated completion date of Oct. 31, 2020. Fiscal 2020 operation and maintenance, Army funds in the amount of $2,968,096 were obligated at the time of the award. U.S. Army Mission Installation Contracting Command, Fort Irwin, California, is the contracting activity. (Awarded Oct. 31, 2019) *Small Business https://www.defense.gov/Newsroom/Contracts/Contract/Article/2008047/source/GovDelivery/

  • Voici le tableau de bord “portable et virtuel” qui équipera un avion de chasse nouvelle génération

    October 9, 2018 | International, Aerospace

    Voici le tableau de bord “portable et virtuel” qui équipera un avion de chasse nouvelle génération

    par Yohan Demeure Abandonner les instruments traditionnels actuellement utilisés pour piloter, et adopter une planche virtuelle qui fera office de tableau de bord. Voici le concept qui équipera un avion de chasse nouvelle génération. Adieu boutons, cadrans, manettes, etc. Place au virtuel dans les futurs avions de chasse ! Il s'agit d'un projet développé par BAE Systems, une société britannique œuvrant dans les secteurs de la défense et de l'aérospatial. Selon un communiquépublié le 21 septembre 2018, il est question d'un tableau de bord vierge, sur lequel sera projetée l'intégralité des informations de vol depuis le casque du pilote, une sorte de cockpit portable (wearable cockpit). Le but est ici de permettre au pilote de ne plus l'cher le manche des mains en cours de vol, et d'éviter à ce dernier de se perdre dans une multitude d'informations. Le tableau de bord virtuel est équipé d'une intelligence artificielle et d'un système de détection du regard. Il est destiné à être reconfigurable à souhait, adaptable au contexte du moment, mais également évolutif (voir schéma ci-dessous). «Le point le plus important sera de déterminer l'objectif du pilote, et d'utiliser des systèmes intelligents pour assurer la performance des t'ches et réduire la charge de travail du pilote. Nous voulons faire cela de manière à ne pas toujours demander la permission, car cela deviendrait rapidement très pénible, mais il est essentiel que le pilote sache clairement quelle est la t'che exécutée par le système intelligent », a déclaré Jean Page, responsable technique du projet. Il s'agit ici clairement de vaincre ce que l'on appelle la tunnélisation de l'attention(ou tunnélisation attentionnelle). C'est le fait que le pilote se focalise à 100 % sur un éventuel problème en cours de vol, ignorant les alertes des paramètres de vol. Cela peut même aller jusqu'aux manœuvres de pilotage les plus élémentaires, qui conduisent à la perte de contrôle puis à l'accident. Selon BAE Systems, ce nouveau dispositif actuellement en développement est destiné à équiper le futur avion de chasse Eurofighter Tempest, qui vise à remplacer l'Eurofighter Typhoon dès 2025. Il s'agit d'un avion développé par le consortium Eurofighter GmbH (Royaume-Uni, Italie, Allemagne et Espagne). Sources : New Atlas – Futura Sciences https://sciencepost.fr/2018/10/voici-le-tableau-de-bord-portable-et-virtuel-qui-equipera-un-avion-de-chasse-nouvelle-generation/

  • Airbus seeks to break Emirates jet order impasse | Reuters

    November 15, 2023 | International, Aerospace

    Airbus seeks to break Emirates jet order impasse | Reuters

    Airbus sought a compromise to try to unblock dozens of A350 orders from Dubai's Emirates late on Wednesday, buoyed by a deal for 11 of the most popular version of the jet with Ethiopian Airlines, industry sources said.

All news