Filtrer les résultats :

Tous les secteurs

Toutes les catégories

    2140 nouvelles

    Vous pouvez affiner les résultats en utilisant les filtres ci-dessus.

  • Contracts for April 20, 2021

    21 avril 2021 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité

    Contracts for April 20, 2021

    Today

  • Federal budget resurrects 'economic harm' warning as fighter jet contract nears | CBC News

    21 avril 2021 | Local, Aérospatial, Naval, Terrestre, C4ISR, Sécurité

    Federal budget resurrects 'economic harm' warning as fighter jet contract nears | CBC News

    Defence contractors, perhaps one in particular, were served notice in Monday's budget that the Liberal government will penalize companies that try to do the country economic harm. The policy was a feature of a nasty trade dispute between Ottawa and U.S.-based Boeing over three years ago. Its resurrection comes as Boeing is one of the bidders for the replacement of the RCAF's fighters.

  • Parsons gets first new CEO in 13 years

    21 avril 2021 | International, Terrestre

    Parsons gets first new CEO in 13 years

    Carey Smith will replace Chuck Harrington as CEO come July 1.

  • Rheinmetall and Northrop Grumman agree to strategic partnership for precision-guided enhanced range artillery ammunition

    21 avril 2021 | International, Terrestre

    Rheinmetall and Northrop Grumman agree to strategic partnership for precision-guided enhanced range artillery ammunition

    Rheinmetall’s South African subsidiary Rheinmetall Denel Munition and Northrop Grumman signed a 10-year strategic partnership agreement to this effect in February 2021

  • DoD SBIR/STTR Pre-Release: DoD SBIR BAA 21.2, DoD STTR BAA 21.B, Air Force CSO X21.2, Air Force CSO X21.B

    21 avril 2021 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité

    DoD SBIR/STTR Pre-Release: DoD SBIR BAA 21.2, DoD STTR BAA 21.B, Air Force CSO X21.2, Air Force CSO X21.B

          The DoD Small Business and Technology Partnerships Office announces the pre-release of the following Broad Agency Announcements (BAAs) and Commercial Solutions Openings (CSOs): •    DoD Small Business Innovation Research (SBIR) BAA 21.2 •    DoD Small Business Technology Transfer (STTR) BAA 21.B •    Air Force CSO X21.2 •    Air Force CSO X21.B IMPORTANT DATES: •    April 21, 2021: Pre-release begins •    May 19, 2021: BAA opens, begin submitting proposals in DSIP •    June 3, 2021: Topic Q&A closes to new questions at 12:00 p.m. ET •    June 17, 2021: BAA closes, full proposals must be submitted in DSIP no later than 12:00 p.m. ET The instructions and topics for these BAAs and CSOs are available on DSIP at https://www.dodsbirsttr.mil/submissions/login and at https://rt.cto.mil/rtl-small-business-resources/sbir-sttr/.            Updated DoD SBIR/STTR Program & Proposal Requirements The following requirements are in place for all SBIR and STTR proposal submissions. Details on these requirements can be found in section 5.0 of the 21.2 SBIR and 21.B STTR BAAs and relevant attachments can be found in both BAAs and CSOs. 1. Foreign Ownership Disclosure Requirement •    Any offeror submitting a proposal under these BAAs and CSOs will be required to disclose via self-report any foreign ownership or control. Proposers must review Attachment 2: Foreign Ownership or Control Disclosure to determine applicability. Offerors shall also require any proposed subcontractors included in their proposal under this BAA to disclose via self-report any foreign ownership or control. If applicable, an authorized firm representative must complete the Foreign Ownership or Control Disclosure (attached to both 21.2 SBIR and 21.B STTR BAAs). The completed and signed disclosure must be uploaded to Volume 5 of the proposal submission. 2. Contractor Certification Regarding Provision of Prohibited Video Surveillance and Telecommunications Services and Equipment •    DoD must comply with Section 889(a)(1)(B) of the National Defense Authorization Act (NDAA) for Fiscal Year 2019; therefore, all proposals must include certifications in Federal Acquisition Regulation clauses 52.204-24, 52.204-25, and 52.204-26, executed by the proposer’s authorized company representative. The Federal Acquisition Regulation clauses may be found as attachments to both 21.2 SBIR and 21.B STTR BAAs and will be available to download during proposal submission and uploaded to Volume 5: Supporting Documents. 3. Company Commercialization Report (Volume 4)  •    The Company Commercialization Report (CCR) will be required for all proposal submissions. Proposers must complete the CCR by logging into their account at https://www.sbir.gov/, downloading a PDF copy of the CCR, and uploading the PDF to the DSIP proposal submission. •    WARNING: Uploading a new Company Commercialization Report (CCR) under the Firm Information section of DSIP or clicking “Save” or “Submit” in Volume 4 of one proposal submission is considered a change for ALL proposals under any open BAAs or CSOs. If a proposing firm has previously certified and submitted any Phase I or Direct to Phase II proposals under any BAA or CSO that is still open, those proposals will be automatically reopened. Proposing firms will have to recertify and resubmit such proposals. If a proposing firm does not recertify or resubmit such proposals, they will not be considered fully submitted and will not be evaluated. 4. Fraud, Waste and Abuse Training (Volume 6) •    The Fraud, Waste and Abuse (FWA) training is required for all proposal submissions. This training can be accessed in the Volume 6 section of the DSIP proposal submission. The training material must be thoroughly reviewed once per year. Plan ahead and leave ample time to complete the training based on the proposal submission deadline. In addition to the proposal requirements above, the BAAs and CSOs have been updated to reflect applicable Federal Acquisition Regulation (FAR) and/or Defense Federal Acquisition Regulation Supplement (DFARS) clauses that will be included in SBIR and STTR contracts. Proposers are encouraged to thoroughly review the BAAs/CSOs to remain apprised of programmatic and contractual changes.            Topic Q&A   Topic Q&A is now available on the Topics and Topic Q&A page in DSIP. Proposers may submit technical questions through the Topic Q&A page at https://www.dodsbirsttr.mil/submissions/login. During pre-release, proposers can contact TPOCs directly or submit questions via Topic Q&A. Once DoD begins accepting proposals on May 19, 2021, no further direct contact between proposers and topic authors is allowed. All questions and answers are posted electronically for general viewing. Topic Q&A will close to new questions on June 3, 2021 at 12:00 p.m. ET, but will remain active to view questions and answers related to the topics until the BAA close. Questions submitted through the Topic Q&A are limited to technical information related to improving the understanding of a topic’s requirements. Any other questions, such as those asking for advice or guidance on solution approach, or administrative questions, such as SBIR or STTR program eligibility, technical proposal/cost proposal structure and page count, budget and duration limitations, or proposal due date WILL NOT receive a response. Refer to the Component-specific instructions given at the beginning of that Component's topics for help with an administrative question. Proposers are advised to monitor Topic Q&A during the BAA period for questions and answers and frequently monitor DSIP for updates and amendments to the topics.            Learning & Support Visit the Learning & Support section for Job Aids and Help Videos to guide you through submitting and viewing questions and answers in the Topic Q&A, preparing and submitting your proposal in DSIP, and more: https://www.dodsbirsttr.mil/submissions/learning-support/training-materials                     Questions Email the DSIP Help Desk at DoDSBIRSupport@reisystems.com for assistance with using DSIP. Questions regarding DSIP can be emailed to the DSIP Help Desk and will be addressed in the order received, during normal operating hours (Monday through Friday, 9:00 a.m. to 5:00 p.m. ET). General questions pertaining to a particular DoD Component and the Component-specific BAA instructions should be submitted in accordance with the instructions given at the beginning of that Component's topics. Thank you for your interest in the DoD SBIR/STTR Program. DoD SBIR/STTR Support Team         

  • US Army picks 5 innovators to help increase its howitzer firing rate

    20 avril 2021 | International, Terrestre

    US Army picks 5 innovators to help increase its howitzer firing rate

    The Army has picked five innovative small businesses to help improve the rate of fire in artillery systems as it continues to work on an internally funded and developed autoloader for its future Extended Range Cannon Artillery system.

  • Contracts for April 19, 2021

    20 avril 2021 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité

    Contracts for April 19, 2021

    Today

  • L3Harris Technologies and American Rheinmetall Vehicles team to pursue U.S. Army’s New Fighting Vehicle

    19 avril 2021 | International, Terrestre

    L3Harris Technologies and American Rheinmetall Vehicles team to pursue U.S. Army’s New Fighting Vehicle

    The agreement combines L3Harris’ open system design and equipment manufacturing leadership with the maturity and modularity of American Rheinmetall Vehicles’ Lynx next-generation fighting vehicle for an OMFV offering that is...

  • Opinion: The Latest Challenge For Defense Primes | Aviation Week Network

    19 avril 2021 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité

    Opinion: The Latest Challenge For Defense Primes | Aviation Week Network

    The “fleet” of defense competitors has been growing in recent years, and new entrants may have different tactics, resources and goals.

Partagé par les membres

  • Partager une nouvelle avec la communauté

    C'est très simple, il suffit de copier/coller le lien dans le champ ci-dessous.

Abonnez-vous à l'infolettre

pour ne manquer aucune nouvelle de l'industrie

Vous pourrez personnaliser vos abonnements dans le courriel de confirmation.