30 décembre 2024 | International, Terrestre

Challenger 3 MBT prototypes 3 and 4 ready for British Army trials

Despite a planned spend of £1.3bn, the Challenger 3 MBTs will only be full operational for a decade before being retired.

https://www.army-technology.com/news/challenger-3-mbt-prototypes-3-and-4-ready-for-british-army-trials/

Sur le même sujet

  • F-35 engine upgrade money could run out in months if budget not passed

    13 décembre 2023 | International, Terrestre, Sécurité

    F-35 engine upgrade money could run out in months if budget not passed

    The Pentagon has also paused negotiations on a performance-based logistics contract for the F-35 after cost and performance estimates underwhelmed.

  • Finland warns fighter contenders to keep their budget-busting offers real

    6 novembre 2019 | International, Aérospatial

    Finland warns fighter contenders to keep their budget-busting offers real

    By: Gerard O'Dwyer HELSINKI — Finland has issued a formal notification to industry candidates in its multibillion-dollar fighter program, urging them to keep their proposals within the prescribed budget constraints. “We do not envisage that we will see withdrawals because of the revised request for quotations. We expect no change there,” said Lauri Puranen, who directs the Finnish Air Forces' HX-fighter program. He said the move was meant simply to stress the need for all of the five international contenders to respect the program's €10 billion, or $11.1 billion, limit. Defense officials here have conceded that all five bidders, including Saab (Gripen), Dassault Rafale, the pan-European Eurofighter Typhoon, Boeing (F/A-18 Super Hornet), Lockheed Martin (F-35) have struggled with the project's rigid budgetary ceiling. "The budget set for the HX project has been an issue for all bidders and candidate aircraft,“ said Maj. Gen. Kari Renko, the deputy chief of the Finnish Defense Force's Logistics Command. Finland's recently-elected, conservative-left coalition government has shown no willingness or flexibility to deviate from the billion budget cap. The defense ministry has been instructed to look for a fighter replacement solution within the budgetary range of €7 billion to €10 billion, or $7.7 billion to $11.1 billion. Whatever flexibility exists in the HX project will impact the number of fighter aircraft purchased and weapons selected as part of the total acquisition program to replace the air force's Boeing F/A-18C/D Hornets. The last of the service's Hornets are expected to be retired by 2030. The defense ministry is seeking responses to the reviews request for quotations to be submitted by the end of January 2020. This will be followed by a request for final offers during the second half of 2020, a process that will commence after stage-two negotiations. The Finnish government plans to reach a decision on the HX fighter platform in 2021. The decision will cover the acquisition of a new aircraft, weapons, sensors, training, and spare parts. Bidders are expected to use their responses to the revised solicitation to clarify the industrial-cooperation elements of their respective offers. Finland is looking for a solution that will benefit the country's defense industry, and where parts and systems connected to the eventual contract will be produced under collaborative partnership contracts and joint venture agreements in Finland. https://www.defensenews.com/global/europe/2019/11/05/finland-warns-fighter-contenders-to-keep-their-budget-busting-offers-real/

  • Les ministres de la défense de l'Allemagne et de la France visitent Airbus Defence and Space à Manching

    18 septembre 2020 | International, Aérospatial

    Les ministres de la défense de l'Allemagne et de la France visitent Airbus Defence and Space à Manching

    Jeudi 17 septembre, Florence Parly, ministre des Armées, et Annegret Kramp-Karrenbauer, ministre allemande de la Défense, ont posé la première pierre du futur escadron de transport tactique franco-allemand sur la base aérienne d'Evreux, avant de se rendre à Manching, en Bavière, pour visiter le site d'Airbus Defence and Space. A l'occasion de cette visite, les deux ministres ont exprimé le soutien de leurs nations aux principaux programmes de défense européens, tels que le développement d'un drone européen, l'Euro MALE, et le système de combat aérien du futur (SCAF). «La visite des ministres française et allemande de la défense à Manching est un signal clair de l'importance d'une industrie de défense forte et compétente pour l'Europe», a déclaré Guillaume Faury, CEO d'Airbus, «Manching est le centre de compétence et le champion national pour toutes les plates-formes militaires allemandes à voilure fixe et revêt donc une importance stratégique pour notre client local. Ici, nous façonnons également l'avenir de l'aviation militaire avec des programmes multinationaux tels que l'EuroDrone et le SCAF, et nous sommes très reconnaissants d'avoir pu présenter cela aujourd'hui aux décideurs».Ensemble de la presse du 18 septembre

Toutes les nouvelles