6 mai 2024 | International, Terrestre

US, UAE, and Saudi forces begin Exercise Native Fury 2024

US military, alongside multi-domain forces from United Arab Emirates (UAE) and Saudi Arabia, has launched Exercise Native Fury 2024 (NF24).

https://www.army-technology.com/news/us-uae-saudi-native-fury/

Sur le même sujet

  • US Navy commissions its last Block III Virginia submarine

    14 avril 2020 | International, Naval

    US Navy commissions its last Block III Virginia submarine

    By: David B. Larter WASHINGTON — The last of the U.S. Navy's eight Block III Virginia-class submarines has joined the fleet, according to a Navy news release. The attack submarine Delaware didn't have its formal commissioning ceremony because of the ongoing coronavirus outbreak, but it will nonetheless start getting ready to enter the deployment rotation. The Block III replaced 12 vertical launch tubes for Tomahawk Land Attack Missiles with two larger 87-inch diameter tubes able to fire larger payloads, each housing six TLAMs. The first Block IV, the attack submarine Vermont, is slated to be commissioned later this month. The Block IV subs primarily add reliability features to the boat that should increase its life span. The Block V, which was awarded last year, adds acoustics upgrades. Eight of the boats will have the Virginia Payload Module. The VPM is designed to triple the Tomahawk cruise missile capacity of the Virginia-class subs, a move designed to offset the pending retirement of the Ohio-class guided-missile subs, which have a 154-Tomahawk capacity. Each Virginia Payload Module sub will have a 40-Tomahawk loadout. https://www.defensenews.com/naval/2020/04/09/the-us-navy-commissions-the-last-block-iii-virginia-submarine/

  • Florence Parly dévoile la stratégie spatiale française de défense

    25 juillet 2019 | International, Aérospatial

    Florence Parly dévoile la stratégie spatiale française de défense

    La France va investir 700 millions d'euros supplémentaires dans le spatial militaire d'ici à 2025, pour renforcer ses moyens de surveillance et se doter de capacités d'auto-défense dans l'espace. Une somme qui s'ajoute aux 3,6 milliards d'euros déjà prévus pour le spatial de défense dans la Loi de programmation militaire française 2019-2025. « Aujourd'hui, nos alliés et nos adversaires militarisent l'espace. Et alors que le temps de la résilience se fait de plus en plus court, nous devons agir. Nous devons être prêts. » Jeudi 25 juillet, Florence Parly, ministre des Armées, s'est rendue au Commandement de défense aérienne et des opérations aériennes (CDAOA), situé sur la Base aérienne 942 de Lyon Mont-Verdun afin de présenter les grandes orientations militaires françaises dans le domaine spatial. Véritable enjeu, l'espace est devenu un lieu de confrontation de plus en plus militarisé. Indispensables au bon déroulement des opérations militaires, nos satellites et leur sauvegarde constituent un impératif stratégique. C'est pourquoi Florence Parly a annoncé que la France allait investir 700 millions d'euros supplémentaires dans le spatial militaire d'ici à 2025, pour renforcer ses moyens de surveillance et se doter de capacités d'auto-défense dans l'espace. Une somme qui s'ajoute aux 3,6 milliards d'euros déjà prévus pour le spatial de défense dans la Loi de programmation militaire française (LPM) 2019-2025. La stratégie spatiale dévoilée par la ministre des Armées se décline selon trois axes : organisationnel, juridique et capacitaire. Montée en puissance progressive du commandement de l'espace Ainsi, comme l'avait annoncé Emmanuel Macron le 13 juillet, un grand commandement de l'espace verra le jour le 1er septembre à Toulouse. Il sera placé sous l'autorité de l'armée de l'Air qui deviendra l'armée de l'Air et de l'espace. Son rôle : fédérer et coordonner tous les moyens consacrés au domaine spatial de défense. « A terme, il doit conduire l'ensemble de nos opérations spatiales, sous les ordres du chef d'état-major des armées et en lien avec le CPCO à l'instar de l'ensemble de nos opérations », a précisé Florence Parly. Doté d'une équipe de 220 personnes, ce commandement de l'espace montera progressivement en puissance sur la durée de la loi de programmation militaire, d'ici à 2025. Pour mettre en place sa stratégie spatiale, la ministre souhaite une évolution des textes régissant l'utilisation de l'espace pour intégrer la spécificité des opérations spatiales militaires. « J'ai décidé que le ministère des Armées assumerait la fonction d'opérateur spatial »explique-t-elle. « Si nous souhaitons être en mesure de mener de véritables opérations spatiales militaires, il nous faut développer une autonomie d'action. » Enfin, Florence Parly a annoncé vouloir perfectionner les capacités de défense spatiale, par le biais d'un nouveau programme d'armement nommé « Maîtrise de l'Espace ». Celui-ci intègrera deux volets : la surveillance et la défense active. Actuellement, la France est une des rares nations à disposer de ses propres capacités de surveillance de l'espace, gr'ce aux radars Graves et Satam ainsi qu'aux télescopes du CNRS et d'Ariane Group. « Demain, nous ferons appel à des moyens et des services plus sophistiqués encore », a souligné la ministre. « Le successeur de Graves devra être conçu pour déceler des satellites de la taille d'une boîte de chaussures à une distance de 1 500 kilomètres. » Afin de mieux protéger nos satellites, des actions seront menées, comme l'intégration de caméras de surveillance aux satellites de communication Syracuse pour leur autoprotection ou encore l'acquisition de nano-satellites patrouilleurs à partir de 2023. Gr'ce à ces futures capacités de surveillance, une défense active pourra être mise en place. La ministre prévient qu'il ne s'agit que d'autodéfense et non d'une stratégie offensive : « Si nos satellites sont menacés, nous envisagerons d'éblouir ceux de nos adversaires. Nous nous réservons le moment et les moyens de la riposte : cela pourra impliquer l'emploi de lasers de puissance déployés depuis nos satellites ou depuis nos nano-satellites patrouilleurs », a-t-elle précisé. https://www.defense.gouv.fr/actualites/articles/florence-parly-devoile-la-strategie-spatiale-francaise-de-defense

  • A hazy future: Amid a competition to build British frigates, a UK shipyard hits hard times

    7 août 2019 | International, Naval

    A hazy future: Amid a competition to build British frigates, a UK shipyard hits hard times

    By: Andrew Chuter LONDON — The Northern Irish shipyard that built the Titanic ceased business Aug. 5, and its part in a bid to build a new class of the general-purpose frigate for the British Royal Navy appears to have sunk with it. Harland and Wolff was the lead U.K. yard in a proposal by German-based warship company Atlas Elektronik to build five Type 31e frigates for the Royal Navy. But the Belfast shipyard of Harland and Wolff went into administration after a 158-year history, which included production of the Titanic and ended with its parent company insolvent and running out of offshore renewable-energy work that had become the mainstay of its business. Industry executives, who spoke on condition of anonymity, said that unless Atlas has a plan B, the bid has likely been scuttled by the Belfast yard slipping into administration and thus putting the jobs of 125 on-site workers at risk. Atlas Elektronik UK did not return calls regarding its bid. British warships must be locally built, but designs can be foreign. Atlas Elektronik UK is offering parent company ThyssenKrupp Marine Systems' Meko A200 frigate to Britain. Currently, Atlas Elektronik and its U.K. partners Harland and Wolff and Ferguson Marine Engineering of Scotland are vying for the deal against rival proposals led by BAE Systemsand Babcock International. An announcement by the Ministry of Defence on a winning bidder for the program worth more than £1.25 billion (U.S. $1.52 billion) could come next month. The procurement competition was aimed at breaking the local maritime monopoly of BAE Systems. Sharing work across the shipbuilding sector via the Type 31e was part of a national shipbuilding strategy published by the British government in 2017. A strategy review was completed this year by its author, John Parker, but the findings have not been published by the MoD. New Defence Procurement Minister Anne-Marie Trevelyn, the fourth such minister in three years, will likely give Parker's findings a close review. Trevelyn has no previous ministerial experience, but she is known in maritime circles for her membership of Parliament's all-party group on shipbuilding and ship repair, which recently published a report advocating for the domestic production of a new fleet of logistics support ships. However, it's unclear how long the government, and hence the new ministerial team at the MoD, will survive given the political uncertainty here around Britain's exit from the European Union and murmurings of a general election. Buy British? The logistic vessels, known here as fleet solid support ships, are not considered military vessels by the British government; this is so the government can procure them more cheaply overseas. A competition is underway with a U.K. team led by BAE Systems bidding against overseas rivals. But the tide may be turning, as there's parliamentary pressure that two or three large supply ships be built locally. The industry executives who spoke to Defense News said that although the upcoming DSEI defense show had been touted as a possible venue for some kind of an announcement, the timing was — like most other defense issues — clouded by political uncertainties, including the appointment of a new defense secretary and defense procurement minister as part of the government reshuffle by the new prime minister, Boris Johnson. An MoD spokesman said the department wouldn't provide a running commentary on the Type 31e competition or Harland and Wolff's part in it. However, the spokesman did suggest an announcement could take place after DSEI. “It would be inappropriate to comment on Harland and Wolff's involvement in the Type 31e program, whilst this is subject to an ongoing competition," the spokesman said. “The competitive design phase is proceeding to schedule. The outcome of the competition for the design and build of the ships will be announced by December 2019.” All three bidders have been in a competitive design phase ahead of submitting their proposals in late June. The MoD previously ran a competition for the Type 31e (the "e" stands for export), but it halted the procurement effort when all of the bidders failed to submit fully compliant bids. The Royal Navy wants the first of the five Type 31e frigates handed over during 2023 to start replace aging Type 23 frigates in its fleet. Some analysts and industry executives think that's a tall order. The government originally demanded a price tag of no more than £250 million per frigate, although earlier this year, industry executives said the budget restriction had been abandoned, as the MoD agreed to supply more equipment and systems at its own expense. Atlas Elektronik isn't the only company with Harland and Wolff on its team. Babcock International also listed the Northern Irish yard in its proposal. But Babcock has various options, including using its site at Rosyth in Scotland, where the second of two aircraft carriers being assembled for the Royal Navy is now virtually complete. “Our solution for the T31(e) requirement includes a flexible U.K. build approach that can accommodate the use of a range of delivery sites,” a Babcock spokesman said. BAE's plan is to build it's Leander-class warships at the Cammell Laird yard near Liverpool while its own yards on the River Clyde in Scotland focus on completing the design and build of eight Type 26 anti-submarine warfare frigates destined for the Royal Navy. Three have been ordered so far. Steve Turner, the assistant general secretary for manufacturing at the Unite union, said there are strategic defense interests why the Belfast yard should be saved. “The shipyard works with BAE on the Dreadnought [nuclear] submarine program, has an important part to play in the building of the Royal Navy's new Type 31e and is central to the U.K. consortium's bid to build the Navy's fleet solid support ships,” Turner noted. “All this proud workforce needs is a temporary boost from government and a commitment from U.K. ministers that they will back U.K. shipbuilding by block building the new fleet solid support ships in yards across the UK." Harland and Wolff is not the only potential Type 31e supplier in a tough spot. Ferguson Marine, which has a yard on the River Clyde and has been part of the Atlas and Babcock proposals, is experiencing significant cost and time overruns building two ferries. Nationalization by the Scottish government is one option under consideration for the financially fragile company. https://www.defensenews.com/naval/2019/08/06/a-hazy-future-amid-a-competition-to-build-british-frigates-a-uk-shipyard-hits-hard-times/

Toutes les nouvelles