11 janvier 2019 | International, Aérospatial

UK Defence Secretary sets sights on next century of British air power

Defence Secretary Gavin Williamson sets sights on next century of British air power as major fighter jet milestones are reached

Defence Secretary Gavin Williamson has today revealed that Britain's combat air power has reached new heights whilst speaking in a brand-new hangar displaying one-hundred years of fighter jets.

Speaking at RAF Marham, the Defence Secretary announced the UK now has nine F-35 Lightning jets ready to be deployed on operations around the world.

The F-35 Lightnings will form the backbone of the UK's combat air fleet alongside the Typhoon jets, which the Defence Secretary also announced have now been fitted with a state-of-the-art complex weapons suite to vastly increase its capability.

Under ‘Project Centurion', worth £425m over the past three years, the Typhoon now has deep strike cruise missile Storm Shadow, air-to-air missile Meteor and the precision attack missile Brimstone at their disposal.

It means the jets have boosted capabilities to intercept airborne missiles and strike ground based targets, seamlessly taking over from the Tornado's attack role as it nears retirement.

Completed on-time and to budget, the upgrades transform the fleet into a world-leading multi-role combat air platform for decades to come.

Military engineers and personnel have worked together with hundreds of UK workers from British defence firms including BAE Systems, MBDA and Leonardo to reach the milestone.

The Defence Secretary made the announcement in front of four different aircraft, in a brand-new maintenance hangar at RAF Marham, which he opened today along with a state-of-the-art new training centre.

These facilities, along with resurfaced runways and new landing pads to accommodate the jet's ability to land vertically, are a key part of the £550m being invested in the Norfolk base.

Defence Secretary Gavin Williamson said:

As we bid farewell to the RAF's first century, we are setting our sights on the next 100 years. Our nation is moving into a new era outside the EU, and our huge achievements in air capability make our commitment to a role on the world stage clear to both our allies and our enemies.

The incredible F-35 jets are ready for operations, a transformed Typhoon has the power to dominate the skies into the 2040s and we continue to look even further into an ambitious future. The RAF has long shown Britain at its great and global best, and today it lifts our nation to even greater heights.

The year ahead will see the F-35 Lightning pilots and ground crew continue learning how to operate and maintain the jets in the new centre, which features state-of-the-art simulators, classrooms, and physical aircraft mock-ups.

The facility provides a real-life training environment replicating the challenges that both pilots and crew will face in supporting and operating the F-35 Lightning.

Pilots from 617 Squadron, who are already based at RAF Marham, will practice flying the next generation aircraft from four full mission simulators.

Having the F-35s ready for operations on time is a huge landmark in what is the biggest defence project in history, which the UK has been a leading partner in for almost 25 years.

Around 150 UK personnel had been working with the jets in the US before the first batch of aircraft came to the UK last summer.

Not only does the programme offer the UK a game-changing military capability, but with British industry manufacturing 15% of a global orderbook of over 3,000 jets, it supports around 25,000 UK jobs and is projected to be worth around £35bn to the national economy.

The Defence Secretary made the announcement in front of four aircraft, which represent the past and future of British fighter jets.

They included the Tornado, which has been in-service since 1979, making its combat debut in the 1991 Gulf War, and which will be retired later this year.

Its unique capabilities have now been transferred to the Typhoon.

In addition to the Typhoon and F-35, the Tempest concept fighter jet model was also on show.

The model, which represents an example of what the UK's future capability might look like, was unveiled last Summer at Farnborough International Air Show, when the Defence Secretary launched the nation's Combat Air Strategy to ensure the UK remains a world-leader in the sector for years to come.

The aim is then for a next-generation capability to have initial operational capability by 2035.

Chief of the Air Staff Air Chief Marshal Sir Stephen Hillier said:

I am proud to confirm that the RAF's Combat Air capability has taken yet another significant step towards the realisation of our Next Generation Air Force. With its cutting-edge stealth technology, our F-35s are now ready to deploy on operations and, alongside our combat-proven Typhoon, offer a step-change in our ability to employ air power around the world.

Furthermore, the successful integration of Stormshadow, Brimstone and Meteor on Typhoon completes and enhances the transition of world-class capabilities from Tornado and allows a stalwart of the RAF's Combat Air inventory to retire from service.

The successful attainment of these milestones and the potential offered by Project TEMPEST will continue to assure the RAF's ability to protect the nation, defend the United Kingdom's interests and support the national prosperity agenda now and well into the future.

The RAF has already trialled its Typhoon and F-35 Forces' interoperability.

In a series of operational trials, the evidence clearly demonstrates the effectiveness of both platforms when operating alongside one another.

With its larger payload and increased agility and range, the Typhoon will operate in concert with the stealthy F-35 and its next-generation sensors, making the RAF one of the few air forces with the ability to exploit the synergy of 4th and 5th generation combat aircraft and delivering the UK a potent force equipped to counter evolving threats in the global environment.

The UK is a world-leader in the combat air sector, which supports over 18,000 highly skilled jobs with a mix of skills and technologies unique in Europe.

The sector delivers a turnover in excess of £6bn a year and has made up over 80% of defence exports from the UK over the last ten years.

https://www.gov.uk/government/news/defence-secretary-sets-sights-on-next-century-of-british-air-power

Sur le même sujet

  • HENSOLDT and 21strategies collaborate on next-generation artificial intelligence for defence systems

    26 janvier 2023 | International, C4ISR

    HENSOLDT and 21strategies collaborate on next-generation artificial intelligence for defence systems

    The aim is to jointly drive the development of next-generation artificial intelligence (AI) for defence systems

  • Romania selects F-35 to upgrade air force fleet

    12 avril 2023 | International, Aérospatial

    Romania selects F-35 to upgrade air force fleet

    The country could become the third Eastern European ally, after Poland and the Czech Republic, to operate the fifth-generation aircraft.

  • Nearly All the F-35 Jet Engines Ordered Last Year Arrived Late

    4 mars 2020 | International, Aérospatial

    Nearly All the F-35 Jet Engines Ordered Last Year Arrived Late

    By Anthony Capaccio Nearly all the engines ordered for the next-generation F-35 jet were delivered late last year as the Pratt & Whitney unit of United Technologies Corp. struggled to solve nagging difficulties with parts and suppliers, according to the Pentagon. About 85% of the engines for the stealthy fighter were delivered late in 2019, the Defense Department's F-35 program office reported, adding that Pratt & Whitney did manage to deliver more engines than required. The tardiness figure was in line with data from 2018, but up from 48% and 58% in 2016 and 2017, respectively. “In general, the monthly schedule performance continues to be impacted by issues with parts and suppliers which the program office is monitoring closely,” the program office said in statement Tuesday. Pratt & Whitney “continues to perform reviews” within its expansive production chain and “has made some progress but more progress is needed to meet the monthly schedule,” it added. Engine delivery issues are just one problem that has plagued the jet's manufacturing ahead of a key decision expected in the next year on whether to move ahead into full-rate production on the $428 billion F-35 program. The fighter has also been flagged for breaking down too often, carrying a 25mm gun that doesn't shoot accurately and having shortages in its supply chain for spare parts from tire assemblies to seats. Some of the problems have since been fixed. Nevertheless, the jet is a key part of a broader weapons modernization effort meant to bolster not just the U.S. military but those of key allies from Poland to Japan. As the sole provider of F-35 engines, Pratt & Whitney and its subcontractors are in line to collect as much as $66 billion of the total jet contract. Congress has approved about $27 billion to date for F-35 engines. But the eventual decision on full-rate production means Pratt & Whitney needs to show it can ramp up production effectively. Overall, 128 of 150 engines delivered last year arrived late, eight arrived on time and 14 came in ahead of schedule, according to the F-35 program office. Of 93 engines in the 11th low-rate production contract bloc, 90 arrived an average of 41 days late. In a statement, the company emphasized that it “exceeded its annual F-35 engine delivery commitment” for 2019. “This represents a 60% year-over-year increase in deliveries. We remain laser-focused on working closely” with the program office and “our supply base to achieving on-time delivery in 2020.” Pratt & Whitney remains under a high-level “Corrective Action Request” that the Defense Contract Management Agency issued in December 2018, citing “poor delivery performance.” The agency said it's evaluating the company's corrective actions and may rescind the CAR by month's end. The company has made improvements in four areas, including deploying “focus teams” to subcontractors for ensuring adequate “critical hardware” and qualifying additional suppliers, DCMA said. Asked if the company was ready for accelerated full-rate engine production, the agency said “as the P&W suppliers demonstrate success in meeting their contract delivery rate the probability of P&W meeting their full-rate production level increases. https://www.bloomberg.com/news/articles/2020-03-03/nearly-all-the-f-35-jet-engines-ordered-last-year-arrived-late

Toutes les nouvelles