7 avril 2020 | International, Aérospatial, Terrestre, C4ISR

Think Tank Creates Informal Forum For Japan NGF Talks

Japan's Next Generation Fighter (NGF) acquisition program is the focus of a new informal channel set up by a Washington think tank for Japanese, U.S., British and Australian officials to discuss requirements and expectations.

The Center for Strategic and International Studies (CSIS) held the first meeting in January with 25-30 people. It included government officials, business executives, and think tanks from all four countries, said Patrick Buchan, director of the center's U.S. Alliances Project.

Organized as a “Track 1.5” level working group in the language of diplomacy, it represents a middle ground between formal, government-to-government talks and back-channel diplomacy, Buchan said. It is a format that allows government officials to discuss issues privately, with Chatham House rules imposed to avoid public attribution, Buchan says.

The chair of the working group is CSIS Vice President for Asia Michael Green. He organized it to help avoid the miscommunications and disappointments of the FS-X program, which led in the late-1980s and early 1990s to Japan's underperforming F-2 fleet, Buchan says.

The FS-X collaboration was designed amidst escalating trade tensions in the late 1980s between Japan and the U.S., two otherwise strong Pacific allies. Likewise, the Trump administration's demand for a 400% increase in Japanese payments to the U.S. to subsidize the costs of the U.S. military presence has also created friction within the alliance.

The difference between the two eras is that China's military modernization efforts over the past three decades has raised the stakes for the outcome of the NGF development process, Buchan says. Neither side can afford a result that leads to a combat system that falls short of Japan's expectations for capability.

Understanding the difficulty of directly engaging Japanese government officials, CSIS conceived of the working group to offer Tokyo an informal channel for discussing the desired capabilities and industrial collaboration for the NGF, Buchan says. In the first meeting, Green posed 12 multiple-choice questions to the group. Each member secretly answered by clicking a button on an individual controller.

CSIS plans to release the full list of questions and answers from the first working group later this spring, along with an analysis. One example provided by Buchan was a question about technical compatibility for the NGF. Other than the U.S., the group was asked which country in the Indo-Pacific region should the NGF be compatible with. The possible answers included Australia, India and South Korea. Eighty-three percent of the respondents said the NGF should be compatible with Australia's air force, Buchan says.

https://aviationweek.com/defense-space/aircraft-propulsion/think-tank-creates-informal-forum-japan-ngf-talks

Sur le même sujet

  • Coronavirus Hampering Defense Contractor Operations, Reader Survey Finds

    19 mai 2020 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité

    Coronavirus Hampering Defense Contractor Operations, Reader Survey Finds

    t's harder to win business amid a pandemic, said one-third of industry respondents in a Defense One reader survey. Federal contractors and private-sector workers say the coronavirus pandemic is hurting business and their ability to compete for government work, a new survey of Defense One readers has found. More than 75 percent said COVID-19 had a moderate, major, or extreme impact on their company's day-to-day operations. About 22 percent said the virus had a minimal impact; 2 percent, no impact. Nearly 60 percent of the respondents said coronavirus has forced them to slow or pause production. Nearly 40 percent said their business has seen disruptions to its cash flow. Defense One commissioned the survey, which was conducted by Government Business Council, a division of Defense One's parent company, Government Executive Media Group. The survey was conducted May 8-14 and received 677 responses, yielding a 5 percent margin of error. Of those, 313 self-identified as a government contractor or private sector employee. Related: 62% Disapprove of Trump's Coronavirus Response, Reader Survey Finds In March, the Pentagon began paying its contractors more money up front so these large firms could send more money to the smaller companies that make up their vast and diverse supply chains. Collectively, companies have sent or pledged to send billions of dollars to their suppliers in a quicker fashion. Still, Ellen Lord, defense undersecretary for acquisition and sustainment, said last month that she was expecting a three-month slowdown in weapons deliveries as companies faced shutdowns and modified their processes and procedures to comply with social distancing and other guidelines. About 30 percent of contractors and private sector workers said their business has experienced supply-chain disruptions. While more than one-third of respondents said social distancing has hurt their company's ability to compete for government contracts, more than half said social distancing has made no difference in their company's ability to win contracts and 12 percent said restrictions have helped their company's competitive advantage. More than 17 percent said their business has had to lay off employees; 18 percent said their companies have furloughed workers. One-quarter of respondents said lack of access to senior officials and decision makers and the inability to attend networking events has affected their business. With conferences, trade shows and other in-person events on hold indefinitely, trade associations and event organizers have looked for virtual ways to replicate not only speaker presentations, but the sideline discussions and other types of networking that many consider essential to doing business in the defense sector. “Your ability to pull somebody off the stage coming off a panel, the ability to ask a question in the question-and-answer period in this environment, is a little bit challenging,” Hawk Carlisle, a retired Air Force general who is CEO of National Defense Industrial Association, said in an interview late last month. “It is having an effect and I do believe the longer this goes on it will continue to have an effect.” This week, NDIA, which represents 1,700 large and small companies and has 70,000 individual members, became the first to transform a large conference and trade show into a fully virtual conference. Typically, its SOFIC event is held in Tampa, near the U.S. Special Operations Command headquarters. This year, the speeches and panel discussions were broadcast online. What's more, the organization facilitated meetings between companies and government officials. NDIA, which usually hosts dozens of events around the country each year, is considering new ways to hold its gatherings, including hosting hybrid events, with some people in attendance and others attending virtually, Carlisle said. https://www.defenseone.com/business/2020/05/coronavirus-hampering-defense-contractor-operations-reader-survey-finds

  • Adopt a treaty for semiconductor export control

    7 février 2024 | International, Terrestre, C4ISR

    Adopt a treaty for semiconductor export control

    Opinion: The absence of a robust global semiconductor export control regime leaves the United States vulnerable in the technological race.

  • Daily Memo: Powering Down

    22 avril 2020 | International, Aérospatial

    Daily Memo: Powering Down

    Guy Norris As the airframers go, so goes the aircraft engine industry. After spending most of the past decade accelerating production to keep pace with unprecedented airliner delivery rates the engine makers have spent the past month in reverse thrust. But as production lines slow, and in some cases come to a full stop, the grim guessing game about the industry's post-COVID-19 pandemic future can begin. For every engine company, anchored midway between their own supply chains and Airbus, Boeing and Embraer in particular, all scenarios paint a bleak picture and the potential impact of the virus-triggered crisis is alarming on at least three key levels. Near term, all must weather the storm and rapidly shrink capacity by 40% or even more to match the new realities of the slower airframe production rates now expected for the next couple of years. Second, having long since focused the core of their business models on the aftermarket, they must adjust to significantly lower revenues from a near term reduction in demand for maintenance, repair and overhaul (MRO) services. Third, with nearly all their resources dedicated to survival, reduced revenues and spending trimmed, development of new engines and propulsion technology is expected to slow significantly—at least in the near term. However, all the manufacturers know that in the mid-to-longer term the environmental pressures on performance will return and so will the relentless demand for lower emissions and greater innovation. Already committed programs will therefore continue, albeit potentially stretched over longer test and development schedules. From a volume perspective, GE Aviation and Safran's CFM joint venture is expected to see the greatest change. Having delivered 1,736 LEAP-1s and 391 CFM56-5/7s in 2019, output from the combined French and U.S. operations will decline significantly in 2020 in lockstep with urgent reductions in production at Airbus and Boeing. CFM, which was previously on track towards a planned annual production rate of more than 2,000 LEAP-1s by the end of 2020, cannot comment on numbers while its parent companies remain in a dark period prior to earnings calls at the end of April, but is expected to slash this target by around half. GE Aviation, which was already expecting a leaner 2020 before the COVID-19 pandemic because of delays to the GE9X-powered Boeing 777-9 and slow-downs to the GE90-115/GEnx-1 powered 777-200LR/300ER and 787 programs, is eyeing the even more troubling impact of the crisis on its aftermarket business. Although around a quarter of GE Aviation's revenues come from its military and other businesses, just 30% comes from commercial engine sales. A much larger portion of its revenue—approximately 45%—comes from MRO services. While some programs, like the CFM56 for the P-8 maritime patrol aircraft as well as military fighter engine efforts, will continue much as before, the company has already taken drastic action to stem losses by furloughing half of its engine manufacturing workers for four weeks. This move, taken in early April, followed an announcement in late March that it was reducing its workforce by 10% (around 2,500 employees), in direct response to the collapse of its MRO workload which the company estimates will be down by around 50% through mid-year at least. However, given the exodus of around two-thirds of the world's airline fleets into storage (almost 17,000 aircraft), the short to medium outlook for engine MRO would be described as dire at best. Compounding the issue for many of the OEMs is that the higher value aftermarket engines powering the widebody fleet, particularly the older generation Airbus and Boeing models, now look increasingly unlikely to ever return to service—at least in their existing guise. For Rolls-Royce, this problem is particularly acute as the UK engine maker focused increasingly on the widebody market over the past decade, widening its exposure to reliance on the support revenue from aftermarket work on older fleets of 747 and 777s as well as older A330s. With full-time premature retirement a possibility, including the previously unthinkable sunsetting of relatively young Trent 900-powered A380s as well as the rapid decline of the RB211-535 powered 757 and Trent 500-powered A340-600 fleets, the company can no longer bank on the expected rebound in deferred maintenance coming out of the crisis. Rolls has also rushed to mitigate losses by enacting measures aimed at saving at least £750 million ($937 million) in cash this year. These include a 10% salary cut for the global workforce and canceling dividend payments. Further moves are expected as the company adjusts to rate reductions announced by Airbus involving the Trent-powered A330no and A350-900/1000, as well as yet-to-be announced rate cuts for the Trent 1000-powered 787 which will shortly be revealed in detail by Boeing. Pratt & Whitney, now part of Raytheon Technologies, is similarly impacted across the board with production of the PW1000G geared turbofan reduced for the A220/A320neo families and commercial revenues hit by falling aftermarket revenues for the PW2000/PW4000 and V2500. Measures such as 10% pay cuts through year-end, as well as furloughs, are being introduced while research and development spending is being frozen. Deliveries of military engines, in particular the F135 for the F-35 fighter and PW4000 for the KC-45A tanker remain unaffected. The early retirements of the PW4000, as well as some CF6-powered fleets, is also significantly impacting revenues for German engine maker MTU. https://aviationweek.com/air-transport/aircraft-propulsion/daily-memo-powering-down

Toutes les nouvelles