28 juillet 2023 | International, Terrestre

TEXTRON Systems Team Lynx OMFV manufacturer moves ahead to program Phase 3 and 4

Slidell, Louisiana, July 26, 2023 – Textron Systems Corporation, a Textron Inc. (NYSE:TXT) company, announced today that the company will move ahead into Phases 3 and 4 of the U.S....

https://www.epicos.com/article/769427/textron-systems-team-lynx-omfv-manufacturer-moves-ahead-program-phase-3-and-4

Sur le même sujet

  • US Navy secretary sees no need to rush next-gen destroyer program

    12 décembre 2022 | International, Naval

    US Navy secretary sees no need to rush next-gen destroyer program

    The industrial base is behind on destroyer deliveries, but SECNAV wants to continue the line "for a long period of time" instead of rushing to start DDG(X)

  • FLIR Awarded $92.9 Million Contract for Logistics Support to U.S. Army Product Manager Force Protection Systems

    18 décembre 2019 | International, Terrestre, C4ISR

    FLIR Awarded $92.9 Million Contract for Logistics Support to U.S. Army Product Manager Force Protection Systems

    Arlington, Va., December 16, 2019 ― FLIR Systems, Inc. (NASDAQ: FLIR) announced that it has been awarded a five-year, firm-fixed-price Indefinite Delivery, Indefinitely Quantity (IDIQ) contract by the U.S. Army Contracting Command, Aberdeen Proving Ground, Maryland. The IDIQ vehicle has a ceiling value of $92.9 million, with an initial order of $5.2 million. The award is for repair, refurbishment, and logistics support of electro-optical (EO) and infrared (IR) sensors used by the Army's Product Manager Force Protection Systems programs, including Base Expeditionary Targeting Surveillance System-Combined (BETSS-C), Combat Outpost Surveillance Force Protection System, and Foreign Military Sales. BETSS-C entails a combination of cameras and surveillance equipment mounted on deployable towers and used to monitor wide areas around important military locations and bases. FLIR has been part of the BETSS-C effort since 2004 when it was called RAID, providing long-range EO/IR sensors at the heart of the system. Today, the company supplies high-definition sensors for BETSS-C as well as radars capable of detecting vehicles, people, or other moving objects at range. FLIR has delivered more than a thousand EO/IR sensors to the U.S. Army as part of the BETSS-C program. This latest IDIQ maintains the service partnership and related revenues FLIR has accrued with the Army, while augmenting the company's ability to meet their needs. “BETSS-C is a critical piece of technology that supports the safety of U.S. forces and its allies at locations around the world,” said David Ray, president of FLIR Systems' Government and Defense business unit. “We value this opportunity to support the Army and optimize the capabilities of this vital surveillance system.” The contract covers a five-year period of performance starting in the fourth quarter of 2019. Work will be performed at FLIR's Wilsonville, Oregon site and international repair facilities. About FLIR Systems, Inc. Founded in 1978, FLIR Systems is a world-leading industrial technology company focused on intelligent sensing solutions for defense, industrial, and commercial applications. FLIR Systems' vision is to be “The World's Sixth Sense,” creating technologies to help professionals make more informed decisions that save lives and livelihoods. For more information, please visit www.flir.com and follow @flir. Forward Looking Statements The statements in this release by David Ray and the other statements in this release about the contract and order described above are forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995. Such statements are based on current expectations, estimates, and projections about FLIR's business based, in part, on assumptions made by management. These statements are not guarantees of future performance and involve risks and uncertainties that are difficult to predict. Therefore, actual outcomes and results may differ materially from what is expressed or forecasted in such forward-looking statements due to numerous factors, including the following: the ability to manufacture and deliver the systems referenced in this release, changes in pricing of FLIR's products, changing demand for FLIR's products, product mix, the impact of competitive products and pricing, constraints on supplies of critical components, excess or shortage of production capacity, the ability of FLIR to manufacture and ship products in a timely manner, FLIR's continuing compliance with U.S. export control laws and regulations, and other risks discussed from time to time in FLIR's Securities and Exchange Commission filings and reports. In addition, such statements could be affected by general industry and market conditions and growth rates, and general domestic and international economic conditions. Such forward-looking statements speak only as of the date on which they are made and FLIR does not undertake any obligation to update any forward-looking statement to reflect events or circumstances after the date of this release, or for changes made to this document by wire services or Internet service providers. View source version on FLIR Systems: https://www.flir.com/news-center/military/flir-awarded-$92.9-million-contract-for-logistics-support-to-u.s.-army-product-manager-force-protection-systems/

  • DOD: Space Force, F-15EX ‘In Peril’ Under CR

    8 novembre 2019 | International, Aérospatial

    DOD: Space Force, F-15EX ‘In Peril’ Under CR

    By Lee Hudson The Pentagon has issued a laundry list of items that are “most in peril” during a potential six-month continuing resolution (CR) that includes the UH-60M helicopter, aircraft carrier maintenance, establishing a Space Force and new-start programs like F-15EX. Congress voted to pass a stopgap CR to keep the federal government funded through Nov. 21. Passing a CR buys Democrats and Republicans more time to reach consensus on fiscal 2020 appropriations bills, which are being held up for defense because of disagreement on funding a border wall. Operating under a CR only allows the Pentagon to operate at prior-year funding levels and the services cannot begin work on new-start programs. “We would like to see Congress find ways in the CR to fund those,” Chief Pentagon Spokesman Jonathan Hoffman told reporters Nov. 7 during a briefing. “The bottom line is that a CR, top to bottom, is debilitating. Whether it's readiness, we lose buying power, we lose predictability with our contracting, we lose the ability to train.” A six-month CR lasting through the first half of fiscal 2020 (ending March 31, 2020) would slash munitions procurement by 1,000 Joint Direct Attack Munition tailkits, 99 Sidewinder Air-to-Air Missiles and 665 Small Diameter Bomb IIs, which will constrain industrial production capabilities and delay inventory buildup. The Pentagon says delaying F-15EX production forces the Air Force to operate and sustain the aging F-15C fleet longer than planned, which would incur extensive maintenance actions. Operating under a six-month CR puts at risk Sikorsky UH-60M Black Hawk production of 15 aircraft valued at $247 million. A year-long CR would upset the current strategy for the Precision Strike Missile and increases risk to contract the Future Attack Reconnaissance Aircraft competition. Operating under a longer CR in fiscal year 2020 will curtail 14 ship availabilities, cancel ship underway training, shut down non-deployed carrier airwing and expeditionary squadrons and restrict fleet flying for training and deployments, Navy spokesman Lt. Tim Pietrack told Aerospace DAILY. The budget uncertainty will detrimentally affect the midlife refueling of the USS John C. Stennis (CVN 74), which requires funding for advance planning and long lead-time material purchases to begin the maintenance period in January 2021. “Failure to fund the CVN 74 [refueling and complex overhaul] will cause a month-for-month slip, increase costs, and delay the return of CVN 74 to the fleet,” Pietrack said. The CR also would impact the production rate of 22 F-5s, three MQ-9s, five F-35Cs and one KC-130J. Operating under budget uncertainty also blocks the Navy from increasing the production rate for the Tomahawk, Amraam, Rolling Airframe Missile, Joint Air to Ground Munition, Long-Range Anti-Ship Missile, Littoral Combat Ship (LCS) Over-The-Horizon missile, Evolved Sea Sparrow Missile, Mk. 48 torpedo and LCS module weapons. “Based on required progress payments, the CVN 80/CVN 81 Carrier Replacement Program will not have sufficient funding to make a required payment on May 1, 2020,” Pietrack said. “This could result in required renegotiation of the contract and higher end costs for both CVN 80 and CVN 81.” https://aviationweek.com/defense/dod-space-force-f-15ex-peril-under-cr

Toutes les nouvelles