25 septembre 2018 | International, Aérospatial, Naval, Terrestre, C4ISR

South Korean military to upgrade ‘friend or foe’ ID capability

By:

SEOUL — Thousands of South Korean jet fighters, helicopters, warships and missile systems will be fitted with sophisticated identifications technologies by the mid-2020s under a major weapons upgrade program, according to the military and defense companies.

For the $2.2 billion deal to switch the decades-old Mode-4 Identification Friend or Foe, or IFF, system to the latest Mode-5, South Korea's arms procurement agency has started issuing a request for proposals.

“The number of equipment eligible for the Mode-5 upgrade account approximately 2,000 related to 70 weapons systems,” according to a spokesman for the Defense Acquisition Program Administration. “The request for proposals will continued to be issued separately by the types of weapons systems over the coming weeks.”

The upgrade program is in line with the transfer of IFF systems to the Mode-5 version by the U.S military, as the South Korean military conducts key operations with U.S. forces on the Korean Peninsula under the authority of the Combined Forces Command.

By 2020, all NATO nations are required to introduce the Mode-5 systems, using advanced cryptographic techniques to secure their systems against electronic deception by adversaries.

“This is a huge program as for the numbers and budget, and is strategically important to upgrading the battlefield capability of the South Korean military and its joint operations with allied forces,” said Kim Dae-young, a military analyst at the Korea Research Institute for National Strategy.

“The new encrypted system will allow South Korean and its allied troops to work safely together, reducing the risk of friendly fire incidents, and it will also offer commanders a better view of the battlefield,” Kim added.

IFF works by sending coded signals, with equipment on friendly planes and ships able to receive and instantly decode the encrypted challenge message, then send the appropriate response to identify themselves.

Three South Korean defense manufacturers are competing for the IFF upgrade contract by teaming up with foreign IFF developers. They are Hanwha Systems, teaming up with U.S. company Raytheon and Hensoldt of Germany; LIG Nex1, with Italy's Leonardo and Thales of France; and Korea Aerospace Industries, joining hands with BAE Systems of the United Kingdom.

Unlike the installation of the Mode-4, the technologies of which belong to foreign IFF makers, domestic companies are involved in the Mode-5 systems development and will locally produce the equipment for cost-effectiveness and sustainable integrated logistics support, according to Defense Acquisition Program Administration officials.

Hanwha Systems, a leading defense electronics company formerly known as Samsung Thales, claims it has the advantage of having know-how related to IFF integration and design.

“Our company was in charge of almost all Mode-4 upgrade programs in cooperation with foreign partners,” said Yoon Seok-joon, a consultant with Hanwha Systems' avionics business team. “Through the experience, we have much better knowledge of IFF design and functions than other local competitors. This is a clear advantage.”

LIG Nex1, a precision missile developer, formed a task force in 2016 for Mode-5 upgrade work to seek related technology for localization.

As a result, the company successfully localized a Mode-5 system for its KP-SAM Shin-Gung (or Chiron) shoulder-launched surface-to-air missiles with the help of Thales, which is contracted to provide Mode-5 technologies for ground weapons systems.

“Based on the successful development of a Mode-5 device for Shin-Gung, we're now able to independently develop Mode-5 equipment for other weapons systems, such as Hybrid Biho air defense system; Chunma short-range surface-to-air missile; and TPS-830K low-altitude radar,” said Park Jung-ho, program manager of LIG Nex1's Mode-5 upgrade team.

To help facilitate the certification of its Mode-5 systems by the U.S. Defense Department, LIG Nex1 recently signed an agreement with the U.S. defense system certification contractor KBR.

Korea Aerospace Industries is expected to win contracts for Mode-5 devices to be fitted on advanced aircraft, including F-15K fighters, T-50 trainer jets and Surion utility helicopters. KAI develops the Surion platform.

“We own thousands of platforms around the world with this product, so we have lots of experiences in the U.S. and other countries as well as with this IFF piece of equipment,” said Rob Peer, president of BAE Systems in Korea. “It's advanced technology with low weight, low power and cost effective. All of those things make it very effective.”

Peer stressed that he feels BAE Systems' Mode-5 is the best fit for the systems of the F-35 fighter jet, which South Korea is to deploy in the coming years.

https://www.defensenews.com/global/asia-pacific/2018/09/24/south-korean-military-to-upgrade-friend-or-foe-id-capability

Sur le même sujet

  • Biden taps Melissa Dalton for Air Force’s No. 2 civilian post

    21 septembre 2023 | International, Aérospatial

    Biden taps Melissa Dalton for Air Force’s No. 2 civilian post

    She would replace Gina Ortiz Jones, who left the leadership post in March.

  • Patchwork Hackers Target Bhutan with Advanced Brute Ratel C4 Tool

    24 juillet 2024 | International, C4ISR, Sécurité

    Patchwork Hackers Target Bhutan with Advanced Brute Ratel C4 Tool

    Patchwork hackers target Bhutan with Brute Ratel C4 and PGoShell. New tactics include impersonation and red teaming software in sophisticated cyber es

  • Construction of first permanent US F-35 campus in Europe begins at Lakenheath

    16 juillet 2019 | International, Aérospatial

    Construction of first permanent US F-35 campus in Europe begins at Lakenheath

    By CHRISTOPHER DENNIS RAF LAKENHEATH, England — A $205 million construction project to prepare RAF Lakenheath for the arrival of two squadrons of U.S. Air Force F-35A Lightning II fighter jets in 2021 officially got underway Monday. The commander of U.S. Air Forces in Europe - U.S. Air Forces Africa, Gen. Jeffrey Harrigian, and other dignitaries plunged shovels into dirt at what will become the first permanent site for U.S. F-35s in Europe. U.K. firms Kier and VolkerFitzpatrick will build a flight simulator facility, maintenance unit, hangars and storage units at the site, in time for the arrival of 48 F-35s in November 2021. The Royal Air Force currently has nine F-35s at RAF Marham, about 25 miles north of Lakenheath. “This will be a great opportunity to reinforce together how we will train, execute and operate on a daily basis, and allow us to deepen what is a critically important relationship,” Harrigian said at the groundbreaking. The project is the first in a broad program to support Air Force operations in the U.K. A further $1 billion is expected to be invested in the program over the next seven to 10 years, said the Defense Infrastructure Organization, which last year awarded the contract for the F-35 campus. “The project team is in good shape — we are on schedule for completion in 2021,” Kier's managing director of aviation and defense James Hindes was quoted as saying by The Construction Index, an industry website. The completed campus will host around 1,200 U.S. airmen. Currently, more than 9,100 U.S. servicemembers are based in the U.K, according to Pentagon data. Recent problems with engine delivery of the F-35A are not expected to delay the arrival of America's newest fighter jet at Lakenheath, a 48th Fighter Wing spokeswoman said Monday. Of the 81 engines that were delivered in 2018, 86% were late, according to a Government Accountability Office report in April. That was up from 48% that were not delivered on time the previous year, when fewer engines were delivered. The delays were due in part to an increase in the “average number of quality issues per engine”— 941 in 2018 against 777 a year earlier, the GAO report said. United Technologies' Pratt and Whitney unit, the only company to make the engines, is under a corrective action request from the Defense Contract Management Agency for “poor delivery performance,” according to a July report by Bloomberg News. https://www.stripes.com/news/construction-of-first-permanent-us-f-35-campus-in-europe-begins-at-lakenheath-1.590422

Toutes les nouvelles