10 octobre 2023 | International, Aérospatial

Shield AI unveils V-Bat Teams drone swarm tech, with eye to Replicator

Shield AI aims to double the size of its V-Bat drone teaming capabilities each year, from four now to eight next year and beyond.

https://www.defensenews.com/unmanned/2023/10/10/shield-ai-unveils-v-bat-teams-drone-swarm-tech-with-eye-to-replicator/

Sur le même sujet

  • Contract Awards by US Department of Defense - February 26, 2019

    1 mars 2019 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité, Autre défense

    Contract Awards by US Department of Defense - February 26, 2019

    NAVY Lockheed Martin Space, Littleton, Colorado, is awarded a maximum amount $846,030,000 un-priced letter contract modification PH0001 to a previously awarded and announced un-priced letter contract (N00030-19-C-0025) for the design, development, build and integration of large diameter rocket motors, associated missile body flight articles, and related support equipment for Navy Intermediate Range Conventional Prompt Strike Weapon System flight test demonstrations. Work will be performed at Littleton, Colorado, with an expected completion date of Jan. 1, 2024. Fiscal 2018 research, development, test, and evaluation funds in the amount of $20,000,000 are obligated on this award, which will expire at the end of the current fiscal year. Fiscal 2019 research, development, test, and evaluation funds in the amount of $67,000,000 are being obligated on this award, which will not expire at the end of the current fiscal year. Strategic Systems Programs, Washington, District of Columbia, is the contracting activity. Raytheon Co., Tucson, Arizona, is awarded $25,229,389 for firm-fixed-price modification P00033 to a previously awarded contract (N00019-17-C-0034). This modification provides for the procurement of Tomahawk Block IV All-Up-Round spares to support the recertification of Tomahawk Missiles. Work will be performed in El Segundo, California (27.57 percent); Walled Lake, Michigan (15 percent); Tucson, Arizona (14.47 percent); Washington, Pennsylvania (11.66 percent); Hollister, California (4.25 percent); Midland, Ontario, Canada (4.18 percent); Glenrothes Fife, United Kingdom (3.2 percent); Vergennes, Vermont (2.9 percent); Orchard Park, New York (2.56 percent); Berryville, Arkansas (1.86 percent); South El Monte, California (1.46 percent); Merrimack, New Hampshire (1.28 percent); Fairfield, California (1.08 percent); Huntsville, Alabama (1.05 percent); and various locations within the continental U.S. (7.48 percent), and is expected to be completed in October 2020. Fiscal 2017, 2018 and 2019 weapons procurement (Navy) funds in the amount of $25,229,389 will be obligated at the time of award, $4,186,657 of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. Johnson Control Navy Systems, York, Pennsylvania, was awarded an $18,819,845 firm-fixed-priced, indefinite-delivery/indefinite quantity contract, for up to 32 air conditioning plant conversion kit and auxiliary components to support Naval Surface Warfare Center Philadelphia Division. Work will be performed in York, Pennsylvania. The contract will have a three year ordering period and work is expected to be complete by February 2022. Fiscal 2019 other procurement (Navy) funding in the amount of $1,995,356 will be obligated at time of award and will not expire at the end of the current fiscal year. This contract was not competitively procured in accordance with 10 U.S. Code. 2304(c)(1) - only one responsible source and no other supplies or services will satisfy agency requirements. The Naval Surface Warfare Center, Philadelphia Division, Philadelphia, Pennsylvania, is the contracting activity (N64498-19-D-4008). (Awarded Feb. 22, 2019) ARMY Jacobs Engineering Group Inc., Dallas, Texas, was awarded a $40,000,000 firm-fixed-price contract for architect and engineer services to support the Air Force Materiel Command Headquarters buildings at Wright-Patterson Air Force Base, Ohio. Bids were solicited via the internet with six received. Work locations and funding will be determined with each order, with an estimated completion date of Feb. 25, 2024. U.S. Army Corps of Engineers, Louisville, Kentucky, is the contracting activity (W912QR-19-D-0013). QED Systems LLC,* Aberdeen Proving Ground, Maryland, was awarded a $9,688,969 modification (P00036) to contract W15P7T-14-C-C012 for program management, engineering, logistics, business, administrative, operations, and security services. Work will be performed in Aberdeen Proving Ground, Maryland, with an estimated completion date of Aug. 26, 2019. Fiscal 2019 operations and maintenance Army funds in the amount of $9,688,969 were obligated at the time of the award. U.S. Army Contracting Command, Aberdeen Proving Ground, Maryland, is the contracting activity. AIR FORCE Cherokee Nation Technologies, Tulsa, Oklahoma, has been awarded a $39,461,205 firm-fixed-price contract for advisory and assistance services (A&AS) for programmatic, environmental cleanup, project execution and financial support. This contract provides base realignment and closure programs and requires a full range of A&AS and deliverables in the areas of management and professional services; studies, analyses, and evaluations; and engineering and specialized technical expertise. Work will be performed at several locations in the U.S. and is expected to be complete by April 6, 2023. This award is the result of a competitive acquisition and three offers were received. Fiscal 2019 operations and maintenance funds in the amount of $9,525,678 are being obligated at the time of award. Air Force Installation Contracting Agency, Joint Base San Antonio, Texas, is the contracting activity (FA8903-19-F-0001). RiverTech, LLC,* Colorado Springs, Colorado, has been awarded a $34,513,979 firm-fixed-price contract for command and control technical support. This contract provides for the operational, technical, and analytical expertise for the planning and execution of training and test events, conducting Live-Virtual-Constructive and Distributed Mission Operations activities, providing operational support, providing non-kinetic operations training and tactics development support, and conducting operational testing of command and control, intelligence, surveillance and reconnaissance systems. Work will be performed at Kirtland Air Force Base, New Mexico; and Nellis AFB, Nevada, and is expected to be complete by March 25, 2024. This award is the result of a competitive acquisition and three offers were received. Fiscal 2019 operations and maintenance funds in the amount of $3,520,157 are being obligated at the time of award. Air Combat Command Acquisition Management & Integration Center, Hurlburt Field, Florida, is the contracting activity (FA4890-19-C-A005). Sonalysts Inc., Waterford, Connecticut, has been awarded a $17,316,322 cost-plus-fixed-fee modification (P0002) to previously awarded contract FA8806-19-C-0002. This modification provides for the development of the training system supporting GPS Next Generation Operational Control System under the management of the Space Training Acquisition Office. Work will be performed in Waterford, Connecticut, and is expected to be complete by April 25, 2022. Fiscal 2019 research and development funds in the amount of $6,000,000 are being obligated at the time of award. Space and Missile Systems Center, Los Angeles Air Force Base, California, is the contracting activity. DEFENSE LOGISTICS AGENCY De Rossi & Son Company, Inc., Vineland, New Jersey, has been awarded a maximum $11,351,934 modification (P00012) exercising the fourth one-year option period of a one-year base contract (SPE1C1-15-D-1033) with four one-year option periods for men's Army coats. This is a firm-fixed-price contract. Location of performance is New Jersey, with a March 3, 2020, performance completion date. Using military service is Army. Type of appropriation is fiscal 2019 through 2020 defense working capital funds. The contracting activity is the Defense Logistics Agency Troop Support, Philadelphia, Pennsylvania. U.S. TRANSPORTATION COMMAND Cargo Transport System Co., Safat,, Kuwait, has been awarded a contract modification (P00007) on contract HTC711-17-D-R021 in the amount of $10,000,000. This modification provides continued stevedoring and related terminal servicesto the 595th Transportation Brigade. This includes vessel loading, vessel discharge, receipt of cargo, disposition of cargo, stuffing/unstuffing of cargo, intra-terminal transfer of cargo, inland transportation of cargo, customs clearance, yard management and management expertise. Work will be performed in ports of Kuwait. The period of performance is from March 9, 2019, to Sept. 8, 2019. Fiscal 2019 Transportation Working Capital Funds were obligated at award. This modification brings the total cumulative face value of the contract to $27,709,945 from $17,709,944.97. U.S. Transportation Command, Directorate of Acquisition, Scott Air Force Base, Illinois, is the contracting activity. (Awarded Feb. 25, 2019) * Small Business https://dod.defense.gov/News/Contracts/Contract-View/Article/1768604/

  • This is who Congress wants in charge of new hypersonic-tracking sensors

    11 décembre 2019 | International, Aérospatial, C4ISR

    This is who Congress wants in charge of new hypersonic-tracking sensors

    By: Nathan Strout Congress wants the Missile Defense Agency to take the lead on developing a space-based sensor layer capable of tracking hypersonic weapons, despite a number of objections made by the Trump administration earlier this year. The administration claimed in a Sept. 4 letter that selecting a lead agency for the sensor layer this early “would limit DoD's ability to establish the most cost-effective missile defense architecture for the nation,” but the conference committee apparently brushed those concerns aside to place the project squarely in the hands of the MDA in their report on the annual National Defense Authorization Act, released Dec. 9. The Hypersonic and Ballistic Tracking Space Sensor would be a new addition to the nation's missile defense architecture, supplementing the current Space-based Infrared System and the future Next Generation Overhead Persistent Infrared system in detecting and tracking ballistic weapons from space. Unlike those two systems, however, HBTSS is specifically designed to detect and track hypersonic weapons as well. Compared to traditional ballistic missiles, hypersonic weapons are faster, maneuverable and dimmer when viewed from space. Both SBIRS and Next Gen OPIR were designed for ballistic missile threats and are ill suited for tracking the dimmer, faster targets presented by hypersonics. HBTSS meets that challenge in two main ways. First, unlike the two previous systems operating in geosynchronous orbit, HBTSS will be located in low-Earth orbit — far closer to the action. Being that much closer allows them to overcome the dimness of hypersonic threats in order to effectively track them. Secondly, the HBTSS sensors are meant to pass information from satellite to satellite, allowing uninterrupted tracking even as the hypersonic weapons move quickly out of view of any one satellite. The fate of the sensor layer has been up in the air for much of the year. The MDA didn't include the effort in its fiscal year 2020 budget, but listed it among their unfunded priorities in a report to Congress, asking for $108 million for the project. Authorization for that funding was included in both the House and Senate versions of the legislation, and unsurprisingly has been included in the conference report. To date, HBTSS has been a combined effort split between multiple organizations — primarily the MDA, the Space Development Agency and the Defense Advanced Research Projects Agency. While the MDA is in charge of the actual payload, DARPA's Project Blackjack has served as a prototype effort for the design of the new sensor layer. Meanwhile, the SDA was established earlier this year to build a new multilayered space architecture in low-Earth orbit, of which HBTSS would comprise one layer. The dividing issue between the two legislative bodies was whether to put the MDA firmly in charge of the operation or continue to let it develop between the MDA and the Space Development Agency, an organization stood up earlier this year to create a new space architecture comprised of hundreds of small satellites providing a variety of capabilities in low-Earth orbit. While the Senate wanted to have the MDA take the lead on development and deployment of HBTSS, the House supported a coordinated approach with responsibility shared between the MDA, the SDA and the Air Force. “This is one of the interesting boundary cases that is going to keep coming up between what do you give to the space service and what do you keep in the other agencies and services,” said Todd Harrison, director of defense budget analysis at the Center for Strategic and International Studies. “In this case, the MDA had already been working on the payload, and so I think there was a lot of angst in taking the MDA's work on that and giving it to another organization where it might lose some momentum.” The conference report comes down on the Senate side of the equation, directing the secretary of defense to assign primary responsibility for the development and deployment of HBTSS with the MDA. The legislation would also require the secretary to submit a plan for how the agency will work with the SDA and the Air Force to develop and integrate the payload. https://www.c4isrnet.com/battlefield-tech/space/2019/12/10/this-is-who-congress-wants-in-charge-of-new-hypersonic-tracking-sensors

  • Lockheed: F-35A Cost To Drop Below $80 Million Per Fighter In 2023

    30 janvier 2019 | International, Aérospatial

    Lockheed: F-35A Cost To Drop Below $80 Million Per Fighter In 2023

    By: Ben Werner Lockheed Martin is committed to producing the F-35A Lightning II Joint Strike Fighter for $80 million each by next year and further reducing the overall program costs as part of the next production contract negotiations with the Department of Defense, the company said on Tuesday In 2022, Lockheed Martin officials expect to negotiate the next multiyear F-35 contract with the Joint Program Office. The goal is to use the steady cash flow from a multiyear contract to drive down further the production costs once the contract kicks in. As part of a pitch for multiyear contract, Lockheed Martin officials say such a deal will lower the F-35A price to less than $80 million per fighter, Marillyn Hewson, chief executive of Lockheed Martin, told analysts during a conference call today discussing the company's 2018 year-end results and expectations for 2019. “That's our target, to continue to drive the unit cost down,” Hewson said. “And we won't stop there, we will always be looking at ways that we can take the cost down in the program as it continues to mature and grows.” Currently, the F-35A, the standard take-off and landing variant primarily used by the U.S. Air Force and foreign partners, has a price tag of $89.2 million. The F-35B short takeoff/vertical landing variant used by the Marine Corps and some foreign partners currently cost $115.5 million each, and the F-35C carrier variant used by the Navy cost $107.7 million per fighter, according to Lockheed Martin. As production increases, the price per F-35 is expected to decrease due to efficiencies in the production process and the ability to lock in lower prices for large quantities of raw materials and components. Lockheed Martin plans to deliver 131 fighters this year, compared to the 91 F-35 fighters delivered in 2018. Within two years, company officials expect to deliver more than 161 fighters per year. However, with F-35 production is closing in on what's considered the full capacity for the program of record, Hewson said the company could build more. Increasing the production rate would require coordination with the JPO, the supply chain and international customers, but Hewson said the company could handle increased demand. Germany, Switzerland and Finland are currently considering buying the F-35, Hewson said. Already the U.S. and 12 other countries are either part of the program of record or committed to purchasing F-35 fighters, according to Lockheed Martin. “We could certainly go to a higher rate if the demand were such that we needed to do that,” Hewson said. Other segments of Lockheed Martin's weapons systems portfolio are also expected to perform well in 2019. The company's Missiles and Fire Control business are expected to record a profit of between $1.3 billion and $1.4 billion in the year. The Rotary and Mission Systems business is expected to record a profit of about $1.3 billion for the year, Bruce Tanner, Lockheed Martin's chief financial officer, said during the call. After the call, the U.S. Department of State's Defense Security Cooperation Agency announced it approved the sale of two Aegis Weapon Systems, two Multi-Mission Signal Processors and two Command and Control Processor refreshes to Japan. Lockheed Martin's Rotary and Mission Systems division is the prime contractor for the Aegis Weapon System and Multi-Mission Signal Processor portion of the $2.1-billion total buy. Japan selected Lockheed Martin in July to outfit its Aegis Ashore system but needed State Department approval before finalizing the deal. In September, the Japanese Maritime Self-Defense Force successfully tested its sea-based Aegis ballistic missile defense capability with the U.S. Missile Defense Agency. Japan currently has four Aegis-equipped destroyers and is in the process of building two more. The following is the State Department notice it approved a proposed Aegis Weapon System sale to Japan. AEGIS Weapon Systems Transmittal No: 19-08 WASHINGTON, January 29, 2019 – The State Department has made a determination approving a possible Foreign Military Sale to Japan of two (2) AEGIS Weapon Systems (AWS), two (2) Multi-Mission Signal Processors (MMSP) and two (2) Command and Control Processor (C2P) Refreshes and related equipment for an estimated cost of $2.150 billion. The Defense Security Cooperation Agency delivered the required certification notifying Congress of this possible sale today. The Government of Japan has requested to buy two (2) AEGIS Weapon Systems (AWS), two (2) Multi-Mission Signal Processors (MMSP) and two (2) Command and Control Processor (C2P) Refreshes. Also included is radio navigation equipment, naval ordnance, two (2) Identification Friend or Foe (IFF) Systems, Global Command and Control System-Maritime (GCCS-M) hardware, and two (2) Inertial Navigation Systems (INS), U.S. Government and contractor representatives' technical, engineering and logistics support services, installation support material, training, construction services for six (6) vertical launch system launcher module enclosures, communications equipment and associated spares, classified and unclassified publications and software, and other related elements of logistical and program support. The total estimated program cost is $2.150 billion. This proposed sale will contribute to the foreign policy and national security of the United States by improving the security of a major ally that is a force for political stability and economic progress in the Asia-Pacific region. It is vital to U.S. national interests to assist Japan in developing and maintaining a strong and effective self-defense capability. This proposed sale will provide the Government of Japan with an enhanced capability against increasingly sophisticated ballistic missile threats and create an expanded, layered defense of its homeland. Japan, which already has the AEGIS in its inventory, will have no difficulty absorbing this system into its armed forces. The proposed sale of this equipment and support does not alter the basic military balance in the region. The prime contractor for the Aegis Weapon System and Multi-Mission Signal Processors will be Lockheed Martin Rotary and Mission Systems, Washington, DC. The Command and Control Processor Refresh will be provided by General Dynamics, Falls Church, VA. There are no known offset agreements proposed in connection with this potential sale. Implementation of this proposed sale will require annual trips to Japan involving U.S. Government and contractor representatives for technical reviews, support, and oversight for approximately eight years. There will be no adverse impact on U.S. defense readiness as a result of this proposed sale. This notice of a potential sale is required by law and does not mean the sale has been concluded. All questions regarding this proposed Foreign Military Sale should be directed to the State Department's Bureau of Political Military Affairs, Office of Congressional and Public Affairs, pm-cpa@state.gov. https://news.usni.org/2019/01/29/40708

Toutes les nouvelles