13 septembre 2023 | Local, Aérospatial

Report cites human factors in CC-150 collision in Guam - Skies Mag

Human factors may have been the cause of an accident between a CC-150 Polaris and a French Air Force A400M at the end of Exercise Mobility Guardian.

https://skiesmag.com/news/report-cites-human-factors-cc-150-polaris-collision-guam/

Sur le même sujet

  • MDA Selected to Design, Manufacture Advanced Navigation Antennas for Airbus Defence and Space

    11 septembre 2019 | Local, Aérospatial

    MDA Selected to Design, Manufacture Advanced Navigation Antennas for Airbus Defence and Space

    September 11, 2019 12:00 AM Eastern Daylight Time MONTREAL--(BUSINESS WIRE)--MDA, a Maxar company (NYSE:MAXR) (TSX:MAXR), today announced that it will design and manufacture advanced space-based L-band navigation antennas as part of a hosted payload on the MEASAT-3d satellite, which is currently being built by Airbus. The MDA-built navigation antennas will be integrated on a hosted payload for South Korean KTSAT that will support the Korea Augmentation Satellite System (KASS). Scheduled for launch in 2021, the KASS navigation payload will deliver L-band regional civil navigation services over South Korea to enhance aviation safety and airplane navigation capability through improved accuracy, reliability and availability of GPS positioning signals. MDA and its parent company Maxar have successfully hosted more than 10 payloads on the company's highly flexible 1300-class satellite platform since 2001, covering a wide variety of essential customer missions. In 2012, the company delivered a powerful multi-mission satellite for SES, which included an L-band payload for the European Geostationary Navigation Overlay Service (EGNOS). “We appreciate the confidence that Airbus has in MDA's innovative satellite technologies, having worked on over 30 programs,” said Mike Greenley, group president of MDA. “We look forward to continuing our close, collaborative relationship with Airbus on this contract.” About Maxar Technologies As a global leader of advanced space technology solutions, Maxar is at the nexus of the new space economy, developing and sustaining the infrastructure and delivering the information, services, systems that unlock the promise of space for commercial and government markets. The operations of DigitalGlobe, SSL and Radiant Solutions were unified under the Maxar brand in February; MDA continues to operate as an independent business unit within the Maxar organization. As a trusted partner with 5,900 employees in over 30 global locations, Maxar provides vertically integrated capabilities and expertise including satellites, Earth imagery, robotics, geospatial data and analytics to help customers anticipate and address their most complex mission-critical challenges with confidence. Every day, billions of people rely on Maxar to communicate, share information and data, and deliver insights that Build a Better World. Maxar trades on the New York Stock Exchange and Toronto Stock Exchange as MAXR. For more information, visit www.maxar.com. About MDA MDA is an internationally recognized leader in space robotics, space sensors, satellite payloads, antennas and subsystems, surveillance and intelligence systems, defense and maritime systems, and geospatial radar imagery. MDA's extensive space expertise and heritage translates into mission-critical defence and commercial applications that include multi-platform command, control and surveillance systems, aeronautical information systems, land administration systems and terrestrial robotics. MDA is also a leading supplier of actionable mission-critical information and insights derived from multiple data sources. Founded in 1969, MDA is recognized as one of Canada's most successful technology ventures with locations in Richmond, Ottawa, Brampton, Montreal, Halifax and the United Kingdom. For more information, visit www.mdacorporation.com. Forward-Looking Statements Certain statements and other information included in this release constitute "forward-looking information" or "forward-looking statements" (collectively, "forward-looking statements") under applicable securities laws. Statements including words such as "may," "will," "could," "should," "would," "plan," "potential," "intend," "anticipate," "believe," "estimate" or "expect" and other words, terms and phrases of similar meaning are often intended to identify forward-looking statements, although not all forward-looking statements contain these identifying words. Forward-looking statements involve estimates, expectations, projections, goals, forecasts, assumptions, risks and uncertainties, as well as other statements referring to or including forward-looking information included in this presentation. Forward-looking statements are subject to various risks and uncertainties which could cause actual results to differ materially from the anticipated results or expectations expressed in this presentation. As a result, although management of the Company believes that the expectations and assumptions on which such forward-looking statements are based are reasonable, undue reliance should not be placed on the forward-looking statements because the Company can give no assurance that they will prove to be correct. The risks that could cause actual results to differ materially from current expectations include, but are not limited to, the risk factors and other disclosures about the Company and its business included in the Company's continuous disclosure materials filed from time to time with U.S. securities and Canadian regulatory authorities, which are available online under the Company's EDGAR profile at www.sec.gov, under the Company's SEDAR profile at www.sedar.com or on the Company's website at www.maxar.com. The forward-looking statements contained in this release are expressly qualified in their entirety by the foregoing cautionary statements. All such forward-looking statements are based upon data available as of the date of this presentation or other specified date and speak only as of such date. The Company disclaims any intention or obligation to update or revise any forward-looking statements in this presentation as a result of new information or future events, except as may be required under applicable securities legislation. Contacts MDA Media Contact Leslie Swartman, 1-613-736-6917 leslie.swartman@mdacorporation.com Maxar Investor Relations Jason Gursky, 1-303-684-2207 jason.gursky@maxar.com https://www.businesswire.com/news/home/20190910006157/en/

  • Unprecedented level of secrecy surrounds costs and work on $80B warship project

    25 janvier 2024 | Local, Naval

    Unprecedented level of secrecy surrounds costs and work on $80B warship project

    Liberal government has invoked a shroud of secrecy around a controversial warship project estimated now to cost around $80 billion.

  • Erratic flight path: Canada’s fighter procurement plan

    4 octobre 2019 | Local, Aérospatial

    Erratic flight path: Canada’s fighter procurement plan

    by Alan Stephenson The path towards procuring a replacement fighter for the CF-188 Hornet has been one with many twists and turns due to political gamesmanship and strategic business marketing, causing much public misunderstanding. This short article aims to put a few things into perspective as the competitors complete their analysis and response to the government's request for proposal (RFP) issued July 23, 2019, for the Future Fighter Capability Project (FFCP). Eligible suppliers Of the original five qualifying suppliers, only the Boeing F/A-18 Super Hornet Block III, Lockheed Martin F-35A Lightning II, and Saab Gripen E fighters remain in the competition. The Dassault Rafale and Airbus Eurofighter Typhoon were both pulled from consideration, with company officials citing “that NORAD [North American Aerospace Defense Command] security requirements continue to place too significant of a cost on platforms whose manufacture and repair chains sit outside the United States-Canada 2-EYES community.” Given that the Canadian government identified the first two principal roles of the Canadian Armed Forces as ensuring Canadian sovereignty and the defence of North America, the requirement to be fully functional and integral within NORAD is mandatory. The reality today is that fighters are not simply weapons platforms, but flying computers that also function as airborne sensors that are designed to be integrated into command and control computer networks. Thus, the challenge for non-American manufacturers is to overcome both sensitive commercial and U.S. national security concerns when they are required to integrate and support U.S. information-sharing equipment in their platforms. A second reason given for Airbus's departure was the eleventh-hour modification to the RFP that relaxed the expected industrial technological benefits (ITB) obligations. To attract more than three suppliers and ensure a competition, the government originally stuck to its standing ITB policy of “requiring the winning supplier to make investments in Canada equal to the value of the contract.” However, this effectively eliminated the F-35 due to the Joint Strike Fighter (JSF) Program agreement – signed by Canada – that forbade such a demand. To provide latitude to all bidders, the final RFP was modified into a two-phased proposal to allow non-American companies to address 2/5-EYES challenges up front, while also applying rated criteria for economic offset potential of stated ITB requirements, to keep the F-35 within the bidding process. Additionally, five per cent was shifted from cost to economic criteria to compensate for changes in the original draft ITB policy. The proposals will now be assessed on 60 per cent technical merit, 20 per cent cost and 20 per cent economic benefits. Current bidders In recent years, the Saab Group expanded globally by offering industrial partnerships that combined local production and capital-heavy ventures with national customer partners. Saab's approach with the Gripen E bid in Canada follows this successful formula of maximizing national economic benefits with an economical product; however, Saab also faces the challenges that Airbus determined to be too difficult to overcome. Additionally, the Gripen E is still in development; its first production flight occurred on Aug. 26, 2019, meaning issues of proven performance and systems maturation need to be factored in during bid evaluation. According to the firm, this first fighter will be used as a test aircraft in a joint Swedish/Brazilian test program, the only two customers for the Gripen E to date. Given that the Eurofighter bid was sponsored by the U.K. government, a member of the 5-EYES community that decided it could not meet the information-sharing requirements, Saab will need to be innovative and cost-conscious in its proposal if it is to surmount this mission-critical criteria. As for the Super Hornet, Boeing promised to invest $18 billion in ITBs under the failed 2017 purchase agreement for 18 fighters, and it is anticipated that the company will follow its established approach to investing in Canada as per previous ITB commitments. Concern over the so-called Boeing Clause, “to allow only companies that it deems ‘trusted partners' to bid on major capital programs,” has faded away and Boeing is confident that it can mount a competitive bid, particularly now that the U.S. Navy's (USN) commitment to future purchases will keep the production line open until 2033. By incorporating leading-edge technology into the Block III to meet adversarial advances, Boeing has ensured the Super Hornet will meet Canadian requirements. Although still in development as well, a major question for government decision-makers has to do with sustainability. At present, only the USN and Kuwait will operate the Super Hornet Block III, while Australia has plans to upgrade their Block II version. As Australia expects to retire its fleet in the early 2040s and the USN in 2045, the challenge for Boeing will be in meeting the stated lifecycle expectancy of Canada's future fighter in a cost-effective manner. Since 2015, the much-maligned F-35 has proven itself in combat and counts Australia, Belgium, Denmark, Israel, Italy, Japan, the Netherlands, Norway, Poland, South Korea, the United Kingdom, and the three U.S. services as customers. As the only fifth generation fighter, it contains technological advances that are designed into the aircraft and cannot be replicated in fourth generation platforms. The overall architectural concept regards the F-35 as more than just a weapons platform, but also as a forward sensor that is fully integrated into the developing multi-domain command and control system. Initial airframe costs have been significantly reduced and early sustainment issues are being resolved; however, the F-35 remains the most costly platform to own and operate at the moment. With a projected lifetime production run of over 4,000 fighters, lifecycle support is guaranteed, and Canadian industry stands to gain substantially from Canada's early investment in the co-operative JSF Program. However, according to reports, manufacturers will lose points in the ITB element formula scoring system if they do not make a 100 per cent commitment to the contract value, which Lockheed-Martin is prohibited from doing by JSF contractual agreement. Arctic Interestingly, all remaining competitors can lay claim to being Arctic platforms. Canada has already proven the F/A-18's credentials in the high North, the U.S. will base two combat F-35 squadrons in Alaska, and Sweden has developed the Gripen with Arctic operations in mind. The issue of one versus two engines has never been a significant issue for Arctic operations except in Canada. Originally, two engines was one of the many discriminators used in choosing the F/A-18 over the F-16 in 1979. Recently, the Standing Committee on National Defence's shaping of the narrative in 2016 to promote the sole-source purchase of the Super Hornet reintroduced the idea that operations in the Arctic demanded two engines. As with commercial aviation where transatlantic flight once required four-engine passenger planes, the advancements in engine technology have led to standard two-engine models today. Engine reliability is not a concern with any of the competing fighters. However, operations in Canada's Arctic are unique and risky in an inhospitable region that is 11 times the size of Sweden. Other discriminators, such as continuous communications and tracking, become equally or more important to survival. Stealth One of the unfortunate aspects of American F-35 global marketing efforts with respect to the FFCP is the issue of stealth technology. Although the idea of penetrating, first strike operations sells well in the U.S., stealth is a much maligned and misappropriated concept in Canada. Stealth technology is all about maximizing self-protection and increasing survivability by disrupting the ‘kill-chain' through low observability. This concept is no different from the tactical advantages that I used while flying the CF-104 in Germany during the Cold War. The Starfighter had a one-square-metre cross-section nose-on, making the adversary's initial radar detection difficult and target acquisition and identification questionable, delaying force commitment to the target. This complicated the decision and order to attack the target, and finally upon weapons release, the low radar cross-section shrunk the available radar weapons envelope needed for destruction of the fighter. The CF-104's speed significantly exacerbated the adversary's kill-chain difficulties. The CF-188 Hornet I flew later required a Defensive Electronic Countermeasures suite that masked the larger aircraft radar cross-section, and electronically intervened and complicated a more advanced kill-chain. The advent of artificial intelligence (AI) will significantly decrease ambiguity and decision-making time in the near future. Whether built into the design or strapped on later, some form of self-protection is required to protect the pilot and the fighter asset that will either be defending Canadian territory or operate in foreign contested airspace when the government commits its fighter force. The question is one of application and the cost effectiveness of self-protection measures used by each platform and how they are expressed in the bid proposal. Costs Costing is a nebulous exercise outside evaluation of the final bids due to the many variables. Although airframe costs are most often thrown around, the government must consider the airframe, operating, infrastructure, sustainment and other related costs as a package, balanced against the capability being purchased. A good example of the intricacies involves the way the fighter fleet is bought. The Super Hornet must be purchased through the U.S. Foreign Military Sales (FMS) process, where the U.S. government acts as the broker. Generally, a 30 per cent mark-up is charged for research and development (R&D) and administrative fees. In the case of the F-35, as a JSF partner, these costs are reduced for Canada through common funding. The costs for R&D have already been shared by the membership pool, and partners pay the same price for the weapons system as the U.S. services. Future upgrades become additional FMS expenses for the Super Hornet, whereas upgrade developments are shared by JSF members. Each of the competitors is being asked to provide 88 fighter aircraft within the $19 billion funding envelope and the old adage of “you get what you pay for” is very applicable. Each of these platforms brings a different level of current and future combat capability that needs to be judiciously weighed. If the fighter is to reach the government's goal of flying until 2060, each needs to be flexible and adaptative to evolving technology. More significantly, 70 per cent of lifecycle costs are in sustainment and therefore the fighter chosen must be cost-effectively supported for the next 40 years. The next leg In the lead-up to the RFP, it has been evident that national security factors have been competing with economic benefit interests. With the election this fall, the next government (whatever form this takes) will no doubt want to review the project and put its own stamp of approval on the process that it has inherited. Hopefully this will not further delay the decision on the replacement of the CF-188 fleet and the Royal Canadian Air Force will finally be able to move ahead with the best fighter aircraft Canadians can provide to the women and men who are putting their lives in harm's way. https://www.skiesmag.com/features/erratic-flight-path-canadas-fighter-procurement-plan

Toutes les nouvelles