5 août 2024 | International, Aérospatial

QinetiQ Group : €284 million Aerial Training Services contract award

The 10-year contract is worth €284 million with an option for an additional two-year extension.

https://www.epicos.com/article/857250/qinetiq-group-eu284-million-aerial-training-services-contract-award

Sur le même sujet

  • Contract Awards by US Department of Defense - November 12, 2019

    13 novembre 2019 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité

    Contract Awards by US Department of Defense - November 12, 2019

    NAVY Clark Construction Group LLC, Bethesda, Maryland, is awarded a $570,337,000 firm-fixed-price contract for the construction of the Walter Reed National Military Medical Center addition/alteration at Naval Support Activity Bethesda. This work consists of constructing a new addition for inpatient and outpatient medical care, renovation of two existing hospital buildings, and demolition of six existing hospital buildings. The contract is incrementally funded with the first increment of $120,000,000 being allocated at the time of award. The second increment will be funded in fiscal 2021 at $150,000,000. The third increment will be funded in fiscal 2022 at $150,000,000. The fourth increment will be funded in fiscal 2023 at $150,337,000. Work will be performed in Bethesda, Maryland, and is expected to be completed by March 2026. Fiscal 2018 military construction, (Defense-wide) contract funds are obligated on this award and will not expire at the end of the current fiscal year. This contract was competitively procured via the Navy Electronic Commerce Online website with one proposal received. The Naval Facilities Engineering Command, Washington, Washington, District of Columbia, is the contracting activity (N40080-20-C-0001). Edifice LLC, doing business as Edifice Solutions,* Beltsville, Maryland, is awarded a firm-fixed-price task order N40085-20-F-4066 at $9,572,167 under a small business design-build/design-bid-build general construction multiple award construction contract for the design-build for four new magazines at Naval Air Station Oceana, Dam Neck Annex. The work to be performed provides for construction of four new oval-arch, earth-covered magazines to replace seven obsolete magazines and demolition of the seven obsolete magazines. Construction of the magazines will require work within jurisdictional forested wetlands as well as the 100-year flood plan. Work will be performed in Virginia Beach, Virginia, and is expected to be completed by May 2021. Fiscal 2019 military construction (Navy) contract funds for $9,572,167 are obligated on this award and will not expire at the end of the current fiscal year. Five proposals were received for this task order. The Naval Facilities Engineering Command, Mid-Atlantic, Norfolk, Virginia, is the contracting activity (N40085-18-D-1125). AIR FORCE L-3 Communications Integrated Systems, Greenville, Texas, has been awarded a not-to-exceed $24,500,078 cost-plus-fixed-fee undefinitized contract action for procurement of Group B material and the Ground System Integration Lab. Work will be performed in Greenville, Texas, and is expected to be completed by March 2024. This contract involves 100% foreign military sales. This award is the result of a sole-source acquisition. Foreign Military Sales funds in the amount of $14,006,934 are being obligated at the time of award. The 645th Aeronautical Systems Group, Wright-Patterson Air Force Base, Ohio, is the contracting activity (FA8620-19-F-4872 P00005). ARMY RLB Contracting Inc.,* Port Lavaca, Texas, was awarded a $8,862,000 firm-fixed-price contract for pipeline dredging in the Gulf Intracoastal Waterway, Texas, across San Antonio Bay in Aransas County, Texas. Bids were solicited via the internet with four received. Work will be performed in Calhoun, Texas, with an estimated completion date of Dec. 31, 2020. Fiscal 2019 and 2020 civil works, operation and maintenance funds in the amount of $8,862,000 were obligated at the time of the award. U.S. Army Corps of Engineers, Galveston, Texas, is the contracting activity (W912HY-20-C-0001). *Small Business https://www.defense.gov/Newsroom/Contracts/Contract/Article/2014557/source/GovDelivery/

  • Britain pledges over $3 billion for Ukraine military aid in 2024

    15 janvier 2024 | International, Terrestre

    Britain pledges over $3 billion for Ukraine military aid in 2024

    Prime Minister Rishi Sunak said London would stand by its support commitment to Ukraine, as some allies are facing political headwinds at home.

  • What reduced size, weight and power mean on the battlefield

    22 août 2018 | International, C4ISR

    What reduced size, weight and power mean on the battlefield

    Computers on the battlefield take a beating. Beyond the everyday wear and tear, they also must endure extreme temperatures and often violent vibrations. To help ensure its systems give soldiers and commanders the information they need, the Army relies on its Mounted Family of Computer Systems program. Known as MfoCS, pronounced em-fox, the program covers detachable tablets to fully-loaded, vehicle-mounted workstations. C4ISRNET spoke recently with Bill Guyan, vice president of business development for Leonardo DRS, about advances in battlefield computing. C4ISRNET: We hear a lot about a new emphasis on the hardening of security of contractors. And not just contractors, but primes, and then their contractors. Obviously this has become a point of concern for DOD leadership. Bill Guyan: One of the big areas of emphasis for the Army in the procurement of the [Mounted Family of Computer Systems] (MFoCS) and particularly MFoC2 II, were areas related to security, both from a cyber security standpoint and the ability to assure that the system was free from malware or any external threat. So there's a very comprehensive supply chain risk management strategy put in place and for this program we believe that this is the most secure edge computing system that the Army's ever purchased. It's absolutely critical that it be so, since ultimately there will be somewhere between a 100,000 and 125,000 of these systems fielded across the Army and Marine Corps, at the edge of the battlefield with each one of these systems serving as potential on ramp to the network and in an area of situational awareness that is absolutely mission critical. There was a time when we derived quick benefit from having an advantage and a capability that our opponents didn't. And over time the capability has evolved from a nice to have capability to a mission critical capability that we'd be hard pressed to fight without. C4ISRNET: The Army has put a lot of emphasis on size, weight and power. Can you explain how that manifests itself on the battlefield? Guyan: We optimize size, weight and power in two ways. At the hardware level we optimize by staying at the leading edge of available technologies, available commercial technologies and rapidly adapting and adopting them for employment in this mission critical extreme environment. The computers and displays are the soldiers' path to the network. It has to work at -40 centigrade and it has to work at 80 degrees centigrade. It has to work in extreme vibration and it has to work in contested EMI environments. It has to work all the time. For example, we led the charge in the adoption and fielding of solid state hard drives versus rotating media, which allowed us to not only improve the resiliency of the system, but also to reduce size, because we no longer have to isolate the rotating hard drive from the shock and vibration. We also migrated from the old backlight technology to an LED backlight, which is much more reliable, particularly in shock vibration at temperature extremes. But it also requires far less power. The other thing that we've been able to do is rapidly adapt the latest processor technologies when they're available. Of course, processors continue to get faster, smaller, and use less power. We're able to make sure that every generation of system can deliver more computing capability for less power, and less power means less heat. Full article: https://www.c4isrnet.com/show-reporter/technet-augusta/2018/08/21/what-reduced-size-weight-and-power-mean-on-the-battlefield/

Toutes les nouvelles