19 juin 2019 | International, Autre défense

Photonis Technologies awarded contract for Spain

Photonis has been awarded a multi-year contract for the delivery of up to 5,000 state-of-the-art image intensifier tubes for night vision monoculars. Photonis will provide the Spanish Armed Forces with high performance 4G image intensifier tubes for usage in the AN/PVS-14 monocular, that will be provided by the Spanish original equipment manufacturer Night Vision Lasers Spain (NVLS).

To increase its effectiveness at night, the Spanish Armed Forces wanted to improve their night operability by purchasing the high performance 4G image intensification technology. This technology increases the ability to locate and engage threats and to operate in all night conditions. The 4G standard is the latest technology in intensified night vision. This technology is specifically designed to address the stringent requirements of special forces operators and only 4G can offer ultra-fast Auto-Gating, the smallest halo and unrivalled spectral range from ultraviolet to near infrared. 4G provides an edge over adversaries in the darkest nights, in all terrain and operations and operators can gain from the best DRI range possible.

The 4G image intensification tubes will be used in the AN/PVS-14 monoculars, provided by NVLS. These systems are used worldwide as either a pocket scope, a right or left eye-mounted monocular or as a weapon sight. “Photonis is proud to deliver its unrivalled technology to the Spanish Armed Forces and supports their choice in the AN/PVS-14 as well, since these multi-function systems increase their flexibility and therefore help safeguard their night operations”, according to Frederic Guilhem, Executive Commercial Officer Night Vision at Photonis.

This contract comes at the same time when NVLS introduced their 16mm image intensifier binocular night vision device in Spain. NVLS developed an ultra-compact and ultra-light dedicated binocular goggle solution called MINIMUS BINO, using Photonis 16mm 4G, high FOM, black & white, ultra-fast Auto-Gated image intensifier tubes, that exceeds an independently validated lifetime of more than 10,000 hours. An initial contract of 110 goggles has been awarded by the Spanish Army and they will be used by Spanish Special Forces (Mando de Operaciones Especiales) and the crew served weapon systems operators. MINIMUS BINO represents actually the smallest system in man portable night vision devices, with less than 380 g with a FOV > 40º and integral metallic construction.

https://www.photonis.com/news/photonis-technologies-awarded-contract-spain

Sur le même sujet

  • Macron kicks off French race to build a new nuclear-powered aircraft carrier

    9 décembre 2020 | International, Aérospatial, Naval

    Macron kicks off French race to build a new nuclear-powered aircraft carrier

    By: Christina Mackenzie   PARIS – French President Emmanuel Macron announced on Dec. 8 that his country's next aircraft-carrier will be nuclear-powered and should be operational by 2038 in time to replace the Charles de Gaulle, which entered active service in 2001. The new aircraft carrier is expected to be the biggest warship France has ever built. Florence Parly, the armed forces minister, said in October that the ship, whatever its propulsion, would be designed to deploy the future combat aircraft system (FCAS) and today her ministry confirmed that the vessel would deploy about 30 of these aircraft “which will be bigger than the Rafales.” The ministry said the ship would be in the 75,000 tonne class (82,673 tons), be around 300 meters long (984 feet) and be able to sail at 27 knots (31 mph), even bigger than the second aircraft carrier that Naval Group was working on in the early 2000s until that program was shelved by the government for lack of money. In comparison, the Charles de Gaulle is 261m (856 feet) long and weighs 42,000 tonnes (46,297 tons) fully loaded. The new ship will have a crew of about 2,000, including the air group. Speaking at Framatome, France's principal nuclear-power company headquartered at Le Creusot in the centre of France, Macron announced just four minutes before the end of his 28 minute speech that he had “decided that the future aircraft-carrier which will serve our country and our navy will, like the Charles de Gaulle, be nuclear-propelled.” It will have two K22 power generators each generating 220 megawatts (hence the 22) derived from the K15 (that generate 150 MW each) that currently power the Charles de Gaulle. Naval Group, which is the prime contractor for these major ship-building projects, immediately issued a statement hailing the decision, pledging to work with its major industrial partners Chantiers de l'Atlantique, TechnicAtome and Dassault Aviation. Pierre Eric Pommellet, chairman and CEO of Naval Group, said, “We are delighted with the announcement (...) which will enable France to maintain its position in the very restricted circle of major powers holding a nuclear aircraft carrier.” Echoing what Macron had said in his speech, Pommellet stressed the importance of projects like this to “ensure the continuity of our skills” and of developing innovative solutions “in the fields of propulsion and high added-value military systems, thus maintaining France's technological lead and its position as a key geostrategic player.” Now that the nuclear option has been chosen to power France's new aircraft carrier, other major decisions will have to be taken, notably concerning the catapults which are a vital part of the project. France has no expertise in this highly specialized technology and so will have to import the catapults from the United States, as it has done for the past 60 years. Those on the Charles de Gaulle are steam-powered, but those on the new aircraft carrier will be electromagnetic. Naval Group and its partners will now start a two-year preliminary design study, which sources said may use a number of the ideas that had been worked on for the aborted second aircraft carrier. That will be followed by more detailed plans with the development phase expected to finish at the end of 2025 at which point the ministry will order the ship. The design phase up to the end of 2025 is expected to cost some €900 million ($1.09 billion) of which €117 million ($142 million) will be spent in 2021. https://www.defensenews.com/global/europe/2020/12/08/macron-kicks-off-french-race-to-build-a-new-nuclear-powered-aircraft-carrier/

  • As Ukraine braces for a major Russian offensive, its 'drone hunters' fight to defend its cities | CBC News

    10 février 2023 | International, Aérospatial

    As Ukraine braces for a major Russian offensive, its 'drone hunters' fight to defend its cities | CBC News

    They stand in silent watch around key Ukrainian cities — the soldiers who call themselves the “drone hunters.” This week, CBC News was allowed access to the Ukrainian military's short-range air defence system outside of Kyiv. The system was assembled to shoot down low-flying aircraft targeting Ukraine's population centres — most of them Iranian-made kamikaze drones packed with explosives.

  • Northrop missile-warning satellites pass early design review

    24 mai 2023 | International, C4ISR

    Northrop missile-warning satellites pass early design review

    The Space Force plans to award a production contract in mid-2024 and the company is on track to launch the first satellite in 2028.

Toutes les nouvelles