1 avril 2020 | International, Terrestre

Oshkosh wins contract to modernize US Army’s heavy tactical vehicles

By: Jen Judson

WASHINGTON — Oshkosh Defense has won a $346 million award to modernize the U.S. Army's fleet of heavy tactical vehicles, according to a March 30 company statement.

The company will recapitalize Heavy Expanded Mobility Tactical Trucks (HEMTT) and Palletized Load System (PLS) trucks with updated technology and safety features. Under the contract, Oshkosh will also build new PLS trailers.

Upgrading heavy tactical trucks aligns with the service's need to support operations across multiple domains against near-peer adversaries.

“Whether they're hauling rocket launchers and missile defense systems, or transporting mission-critical equipment, the HEMTT and the PLS will continue to be an integral part of the U.S. Army and U.S. Army Reserve heavy vehicle fleets for years to come,” said Pat Williams, the company's vice president and general manager of U.S. Army and Marine Corps programs. “As the military pivots its focus to near-peer adversaries, they can be confident that the [family of heavy tactical vehicles] fleet will continue to serve as a key enabler for combat missions.”

Oshkosh has already recapitalized more than 13,700 HEMTTs and 3,400 PLS for the U.S. military since 1995.

The company supplies tactical vehicles across the services, including heavy, medium and light. Oshkosh has long held lucrative contracts to supply the services and foreign partners with medium tactical vehicles; it had won a contract to provide a new variant of the vehicle but has yet to begin delivering to the Army.

Navistar Defense recently sued the Army over its continued purchase of Oshkosh's family of tactical vehicles without competition, but the U.S. Court of Federal Claims ruled in favor of the service and Oshkosh.

Oshkosh also provides the Joint Light Tactical Vehicle to the Army, Marine Corps and Air Force. The vehicle reached full operational capability last year after overcoming some design issues. The future is unclear for the Oshkosh-manufactured JLTV as the Army looks to compete for future lots of the vehicle, according to the service's fiscal 2021 five-year budget plan.

https://www.defensenews.com/land/2020/03/31/oshkosh-wins-contract-to-modernize-armys-heavy-tactical-vehicles/

Sur le même sujet

  • Contract Awards by US Department of Defense - March 03, 2020

    4 mars 2020 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité

    Contract Awards by US Department of Defense - March 03, 2020

    AIR FORCE Northrop Grumman Systems Corp., Linthicum Heights, Maryland, has been awarded a $262,281,057 firm-fixed-price modification (P00027) to contract FA8615-17-C-6047 for Active Electronically Scanned Array radars of Air Force F-16 aircraft. This modification is for the exercise of options to include 15 engineering, manufacturing and development (EMD); and 90 production radars, as well as associated support equipment and spares. Work will be performed at Linthicum Heights, Maryland, and is expected to be completed by December 2022. The total cumulative face value of the contract is $553,448,803. Fiscal 2020 research and development funds in the amount of $34,182,567; fiscal 2018 procurement funds in the amount of $88,201,189; and fiscal 2020 procurement funds in the amount of $197,955,911 are being obligated at the time of award. The Air Force Life Cycle Management Center, Fighter Bomber Directorate, F-16 Division, Wright Patterson Air Force Base, Ohio, is the contracting activity. CAE USA-Mission Solutions Inc., Tampa, Florida, has been awarded a $10,586,540 firm-fixed-price modification (P00033) to contract FA4890-17-C-0006 for the F-15E, F-16 and F-22A contract aircrew training and courseware development contract. The contract modification is for exercising Option Year Three. The total cumulative face value of the contract is $50,064,347. Fiscal 2020 operations and maintenance funds will be obligated in the amount of $10,586,540 by April 1, 2020. The performance locations are as follows: Langley Air Force Base (AFB), Virginia; Seymour Johnson AFB, North Carolina; Shaw AFB, South Carolina; Tyndall AFB, Florida; Nellis AFB, Nevada; Hill AFB, Utah; and Mountain Home AFB, Idaho. Work is expected to be completed by March 31, 2021, for this option period. Air Combat Command Acquisition Management and Integration Center, Langley AFB, Virginia, is the contracting activity. ARMY Technica, Charleston, South Carolina, was awarded a $181,708,286 cost-plus-fixed-fee, firm-fixed-price contract for logistics support services at Fort Bliss, Texas. Bids were solicited via the internet with seven received. Work will be performed in Fort Bliss, Texas, with an estimated completion date of April 3, 2025. Fiscal 2020 operations and maintenance, Army funds in the amount of $181,708,286 were obligated at the time of the award. U.S. Army Contracting Command, Rock Island Arsenal, Illinois, is the contracting activity (W52P1J-20-F-0184). Airbus Helicopters Inc., Grand Prairie, Texas, was awarded a $122,655,293 modification (P00012) to contract W58RGZ-18-C-0007 for procurement of 15 UH-72 Aircraft. Work will be performed in Columbus, Mississippi, with an estimated completion date of Aug. 31, 2022. Fiscal 2018 aircraft procurement, Army funds in the amount of $122,655,293 were obligated at the time of the award. U.S. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity. The Ross Group Construction Corp., Tulsa, Oklahoma, was awarded a $26,755,960 firm-fixed-price contract to renovate Bldg. 1634 Volar Barracks, Fort Polk, Louisiana. Bids were solicited via the internet with six received. Work will be performed in Fort Polk, Louisiana, with an estimated completion date of Nov. 12, 2021. Fiscal 2020 operations and maintenance, Army funds in the amount of $26,755,960 were obligated at the time of the award. U.S. Army Corps of Engineers, Fort Worth, Texas, is the contracting activity (W9126G-20-C-0013). NAVY QED Systems Inc., Virginia Beach, Virginia (N64498-20-D-0005); Gryphon Technologies LC, Washington, District of Columbia (N64498-20-D-0006); McKean Defense Group LLC, Philadelphia, Pennsylvania (N64498-20-D-0007); and HII Fleet Support Group LLC, Virginia Beach, Virginia (N64498-20-D-0008), are awarded $49,497,614 for an indefinite-delivery/indefinite-quantity, cost-plus-fixed-fee contracts for services related to technical, process and programmatic support for integrated logistics and technical documentation. Work locations will vary according to individual task orders; 25% of the work will be executed in Philadelphia, Pennsylvania; and 75% of work will be accomplished at contractor site locations to include Philadelphia, Pennsylvania; Norfolk, Virginia; San Diego, California; Marionette, Wisconsin; Kings Bay, Georgia; Port Hueneme, California; Corona, California; Honolulu, Hawaii; Bremerton, Washington; Mayport, Florida; Mechanicsburg, Pennsylvania; Yokosuka, Japan, Manama, Bahrain; Washington, District of Columbia, and other areas as directed. Work is expected to be completed by March 2025. Fiscal 2020 operations and maintenance (Navy) funding in the amount of $100,000 ($25,000 per task order) will be obligated at time of award via individual task orders and will expire at the end of the current fiscal year. These contracts are the result of a full and open competitive procurement via the Federal Business Opportunities website. Seven offers were received and in accordance with 10 U.S. Code 2304(a). The Naval Surface Warfare Center, Philadelphia Division, Philadelphia, Pennsylvania, is the contracting activity. Aptim Federal Services LLC, Alexandria, Virginia, was awarded a $10,498,157 firm-fixed-price task order (N62473-20-F-4299) under a multiple award construction contract for a mini-mart and gas station at Naval Base San Diego. Work will be performed in San Diego, California, and consists of fuel dispensers and overhead canopies. The mini-mart will include a covered retail area, a walk-in beverage cooler, and reach-in coolers and freezers. Additionally, the building will include a receiving area, patron restrooms, employee lounge, office and support spaces. Work is expected to be complete by December 2021. Fiscal 2020 non-appropriated funds (Navy) and contract funds are obligated on this award and will expire at the end of the current fiscal year. Two proposals were received for this task order. Naval Facilities Engineering Command, Southwest, San Diego, California, is the contracting activity (N39430-15-D-1632). (Awarded Feb. 28, 2020) https://www.defense.gov/Newsroom/Contracts/Contract/Article/2100985/source/GovDelivery/

  • Safran and MTU Aero Engines create EURA joint venture to power the next generation of European military helicopters

    27 juin 2024 | International, Aérospatial

    Safran and MTU Aero Engines create EURA joint venture to power the next generation of European military helicopters

    With the creation of EURA, the two companies are taking a further important step towards the joint development of a new 100% European engine for the next generation of European...

  • NAVAIR: New Presidential Helicopter Production to Start Soon

    7 mai 2019 | International, Aérospatial

    NAVAIR: New Presidential Helicopter Production to Start Soon

    By: Ben Werner NATIONAL HARBOR, Md.—Naval Air Systems Command has a handshake deal in place to start production of the Sikorsky VH-92A, the next generation presidential helicopter, officials said on Monday. NAVAIR has already taken possession of three VH-92A aircraft and the program is scheduled to have a milestone decision meeting at the end of the month with Assistant Secretary of the Navy for Research, Development and Acquisition James Geurts. Based on the feedback from test pilots, VH-92A production is expected to start soon after the milestone meeting, Marine Maj. Gen. Gregory L. Masiello, the program executive officer for Air anti-submarine warfare, assault and special mission programs (PEO (A)) said during a presentation at the Navy League's 2019 Sea Air Space exposition. “I believe that things went reasonably well,” Masiello said of the recent VH-92A testing. “The reason I say that is because I know where the aircraft took off from every day and I know where they landed every day, and it was where it was supposed to. The feedback was relatively positive.” In one instance, a VH-92A flew into Washington D.C., swooping low over the National Mall on an otherwise quiet Saturday morning, and practicing landing on the White House lawn. That VH-92A was the first helicopter delivered to NAVAIR. The initial operational capability is expected to occur in late 2020, and the full production line is on track to complete in 2023. Assuming the end of May meeting with Geurts is positive, Masiello said the plan is to award Sikorsky a production contract and executive options to build the VH-92 throughout the life of the program as needed, Masiello said. As part of the Presidential Helicopter Replacement Program, Sikorsky was in 2014 awarded a $1.2 billion contract to build a fleet of six helicopters to start, but with options for the Navy to purchase up to 17 more helicopters. This is the second attempt to replace the current decades-old VH-3Ds presidential helicopters currently in use. In 2005, Lockheed Martin's proposed VH-71 helicopter beat the Sikorsky helicopter in the competition to build the Presidential helicopters. Years of delays and cost overruns caused the Pentagon to scrap the project in 2008 and start the process over with a new round of bidding, according to a Congressional Research Service report. A decade later, Sikorsky won a new competition with its VH-92A design, a variant of the Sikorsky S-92 helicopter which is used by 11 other nations to transport their heads of state. Lockheed Martin purchased Sikorsky for $9 billion in 2015. https://news.usni.org/2019/05/06/navair-new-presidential-helicopter-production-to-start-soon

Toutes les nouvelles