21 juin 2021 | International, Aérospatial
French, German, Spanish Air Force Chiefs Review Future Combat Air Systems Project
French, German, Spanish Air Force Chiefs Review Future Combat Air Systems Project
2 mai 2022 | International, Naval
The research centers are meant to support ongoing naval and counter-mine programs run jointly by Belgium and the Netherlands.
 
					21 juin 2021 | International, Aérospatial
French, German, Spanish Air Force Chiefs Review Future Combat Air Systems Project
 
					1 avril 2020 | International, Aérospatial
by Chris Thatcher The Saab Gripen E test program has surpassed 300 flight hours and the company is preparing to deliver production aircraft to the Swedish Air Force in 2020. “We are proceeding according to plan and are delivering according to our customers' expectations,” Eddy de la Motte, the head of Saab's Gripen E/F business unit, told webinar viewers during a briefing on Mar. 26. The annual update on the Gripen program was moved to an online forum in response to the coronavirus pandemic. Although Sweden has for now adopted a notably different approach to addressing the spread of COVID-19 than its neighbours – most businesses remain open – defence and aerospace journalists and other interested attendees were confined to virtual participation. “Saab is not one of those companies that is feeling immediate consequences because of the situation given a large order backlog and the business model that we use,” said Ellen Molin, head of Business Area Support Services. “We are doing everything we can to work on development and production.” The Gripen E is among three fighter jets contending to replace the Royal Canadian Air Force fleet of CF-188 Hornets. The others are the Lockheed Martin F-35A Lightning II and the Block III Boeing FA-18E/F Super Hornet. The Gripen E is the only one not yet in service. The briefing was an opportunity for Saab to highlight the progress of the flight test program and forthcoming deliveries to the first customers, Sweden and Brazil. The test program now includes six aircraft and will be expanding to two sites this year involving test pilots from Saab, the Swedish defence materiel administration, and the Swedish Air Force. The accelerated test and verification program will be “more efficient,” said de la Motte. “We are now shifting focus to more testing on the tactical systems and the sensors.” Saab had high expectations for the Gripen E's enhanced fused sensor suite and decision-support capabilities before flight testing began, he said. But the Active Electronically-Scanned Array (AESA) radar, passive infrared search and track (IRST) sensor, tailored datalink and multi-function electronic warfare (EW) system “are preforming better than expected.” Testing has also included an electronic jammer pod to complement the internal active EW system, flights with the MBDA Meteor beyond-visual-range air-to-air missile, and firing of the short-range IRIS-T air-to-air missile. The first production aircraft rolled off the line in Linköping, Sweden earlier this year, and the second and third will be delivered to Sweden later in 2020. Among other milestones, Saab turned over the first test aircraft to the Brazilian Air Force in August 2019. Its arrival in Brazil is scheduled for the end of 2020. Brazil has ordered 36 jets, 28 in the single-seat E variant and eight in the two-seat F model. In advance of the Brazilian flight test program and the launch of a Gripen flight test centre in Brazil, Saab has transferred aircraft intellectual property and knowledge to hundreds of Brazilian technicians, test engineers and pilots at its production facility in Linköping. Furthermore, the Gripen Design and Development Centre in Brazil has cut the first metal on the F-model two seat variant, to be delivered in 2023. Saab is also hoping to expand its customer base as the Gripen E enters service. In February, the company demonstrated two of its test aircraft at Pirkkala Air Base in southern Finland as part of the HX Challenge, the first stage of a capability assessment of five aircraft vying to replace the Finnish Air Force fleet of F/A-18 C and D Hornets. The Gripen is up against the Eurofighter Typhoon, Dassault Rafale, Lockheed Martin F-35A and Boeing F/A-18 Super Hornet. The two aircraft were demonstrated alongside a Saab GlobalEye airborne early warning and control platform, a multi-role air, maritime and ground surveillance system based on the Bombardier Global 6000/6500 jet. As part of a package with Finland, Saab is proposing to transfer intellectual property to operate maintenance, repair and overhaul facilities, spares production, final assembly and a development and sustainment centre. “We fully understand the needs of national security and the ability to control critical technology,” said de la Motte. A similar offer is likely to be part of Saab's pitch to Canada when the request for proposals closes on June 30. In March, the company announced a “Gripen for Canada Team” that includes IMP Aerospace & Defence, CAE, Peraton Canada and GE Aviation. De la Motte said the proposal for 88 Gripen E jets would include “high skilled jobs” as well as aircraft and systems built by Canadians. Both de la Motte and Molin emphasized the “smart and cost-efficient support concept inherent in the aircraft design” that now includes the ability to 3D print spare parts for battle damage repair in a forward hangar to allow grounded aircraft to return to a main operating base. That efficiency was underscored by Col Torgny Fälthammar, head of the Gripen program for the Air Staff of the Swedish Air Force (SAF). A former Saab 37 Viggen and Gripen C fighter pilot, he noted the SAF “operates in a domain where the time to react is sometimes very short – the aircraft and systems we face have a very high velocity.” Since Sweden can't field superior numbers, “we have to strive for the best balance between technology, competence and tactics, and having the relevant numbers... [and] we believe we have found that in the Gripen system.” The Gripen E will introduce “high tech, state-of-the-art systems,” he added. But “being a small country, we always have to think about money and affordability.” https://www.skiesmag.com/news/saab-delivers-virtual-gripen-e-program-update
 
					4 février 2019 | International, Aérospatial
By: Gerard O'Dwyer HELSINKI – Finland's HX-FP multirole fighter replacement program has advanced to the next stage as five aircraft manufacturers have tendered their proposals to the Finnish Defence Forces' (FDF) Logistics Command office. The proposals include preliminary quotations on cost. The air force plans to retire its fleet of F/A-18 C/D Hornet jets between 2025 and 2029. The HX-FP carries an estimated price tag of €11.4 billion, a cost that includes life cycle service and maintenance overheads on a fleet of 64 multirole aircraft. The government received proposals from four countries, including the United States, Sweden, France and Britain. The aircraft types covered in the proposals are Boeing's F/A-18 Super Hornet, Lockheed Martin's F-35, France's Dassault Rafale, the British-made Eurofighter and the Swedish Saab Gripen. The Saab proposal includes both the single-seat Gripen E and the dual-seat Gripen F versions. Request for Quotation (RFQ) documents were dispatched by the Logistics Command to the governments of France, the United States, Britain and Sweden in April 2018. The petitions were then forwarded to the five participating manufacturers. The deadline for acceptance of responses was Jan. 31, 2019. The proposals received by the Logistics Command include information pertaining to technical systems requirements for operating a fleet of 64 aircraft, as well as support documentation dealing with training systems, essential maintenance tools, testing equipment, spare parts, weapons systems and sensors. The next stage in the HX-FP program will be an analysis of the various proposals. This is expected to be completed during the first half of 2019. At that point, the procurement program will enter the first phase of a negotiations process during which a more forensic examination of the quotations tendered will be conducted in consultation with the five bidding manufacturers. The Logistics Command will forward a more detailed RFQ to manufacturers during the second half of 2019. This will precede the second phase of negotiations. Participating manufacturers will be required to submit final tender documents to the government during the second stage process which is slated to end in 2020. The Finnish government plans to bring its final decision to the national parliament for approval in 2021. The proposal presented by Saab sets out the basis for a broad, long-term industrial cooperation between Finland and Sweden framed around any deal. The proposal covers the production of military aircraft in Finland. It also includes the transfer of maintenance, repair and overhaul capabilities to local industry in Finland. Moreover, Saab is proposing to establish a Gripen sustainment and development center in Finland. https://www.defensenews.com/global/europe/2019/02/01/industry-bids-are-in-for-finlands-13-billion-fighter-race