14 décembre 2023 | International, Aérospatial

KNDS and LEONARDO form strategic alliance

Such a strategic alliance will enable the implementation of programs in cooperation among European nations

https://www.epicos.com/article/783811/knds-and-leonardo-form-strategic-alliance

Sur le même sujet

  • Airpower Demands Drive Air-Launched Cruise Missile Evolution

    11 février 2021 | International, Aérospatial

    Airpower Demands Drive Air-Launched Cruise Missile Evolution

    Tony Osborne Thirty years ago, news cameras shot shaky imagery of long tubular missiles flying across the Baghdad skyline. They were a mix of Raytheon Tomahawks launched from U.S. Navy warships in the Arabian Sea and Boeing AGM-86 Air Launched Cruise Missiles, released from Boeing B-52s in the final moments of their flights, closing in on targets in the city center with a precision never seen in previous conflicts. The missile firings were the opening shots of one of the most successful air campaigns in history. Within 39 days the air assault had rendered Iraq's armed forces ineffective, ruined the country's economy and helped prevent the conflict from drawing in neighboring states. Advanced seekers drive greater autonomy in engagement endgame More than 20 countries have air-launched cruise missiles Weapons use low-observability tech to increase survivability Operation Desert Storm almost certainly secured the role of the cruise missile for future air campaigns, with the weapons providing the opening salvos for attacks in Afghanistan, Kosovo, Libya and more recently Syria. Today, nearly 20 countries have an air-launched cruise missile capability and others are aspiring toward it as the technology proliferates. Nations such as Brazil, India and Pakistan are developing their own. Increasingly, the missiles no longer are seen as just an offensive capability in the hands of the superpowers, but also as a defensive one—a long arm that can hold adversaries at bay. Neutral Finland has equipped its Boeing F/A-18 Hornets with the Lockheed Martin Joint Air-to-Surface Standoff Missile (JASSM), Sweden is considering the integration of a long-range missile for its Saab Gripens later in the 2020s, and Taiwan has developed an air-launched cruise missile for use from its AIDC F-CK-1 Ching-Kuo indigenous combat aircraft. “The significantly increased effective range of air-defense and anti-ship missiles since the end of the Cold War has allowed these nominally defensive systems to be used for offensive political purposes in various parts of the world, by threatening air and maritime assets far outside the territory on which they are based,” says Justin Bronk, a fellow for airpower and technology at the London-based Royal United Services Institute. “Cruise missiles are a necessity for any nation or coalition which needs the capability to threaten or destroy targets protected by modern ground-based air-defense networks.” At the same time, the definition of a cruise missile is being blurred. Loitering munitions and attritable UAVs—including those being developed as additive capabilities for future combat aircraft—use similar technologies, as do air-launched decoys such as Raytheon's Miniature Air-Launched Decoy and proposed systems from MBDA and Saab. The term “cruise missile” also has been hijacked and associated with shorter-range standoff weapons and even anti-ship missiles, although some have a limited land-attack capability. Even the UK's new MBDA Spear 3 weapon recently was described by the company as a mini cruise missile. The cruise missile's precursors date back more than a century. Curtiss-Sperry's Aerial Torpedo took a converted biplane, fitted it with remote controls and filled it with explosive, although it was never used in anger. Then just 25 years later, during World War II, Hitler's Germany launched thousands of V-1 pulsejet-powered flying bombs against the Allies, including more than 1,000 launched from modified Heinkel He.111 bombers. Fast-forward to today: Modern cruise missiles are capable of flying thousands of kilometers across land and sea, their positions guaranteed by satellites. Then, in the final moments of an attack, onboard sensors seek out the objectives before the missiles' penetrating warheads defeat even hardened targets. Development of a cruise missile will be bound up in the requirements stipulated by the sponsoring nation, but among the most prominent will center on the weapon's launch platform. This will generate its own constraints including the physical size and weight of the weapon, particularly if it needs to be fitted inside an aircraft's internal bay-—like that of the Lockheed Martin F-35 Joint Strike Fighter. Platform legacy is another factor, as the weapon might end up being in service longer than the carrier aircraft. For example, carriage of the UK's MBDA Storm Shadow had to be transferred from the Panavia Tornado to the Eurofighter Typhoon when the Tornado exited service in 2019. That means consideration also is needed for future platforms. This is a particular issue in cases where missile companies have not had input into aircraft development programs and is being addressed in Europe through initiatives such as the UK-led Tempest and German/French/Spanish Future Combat Air System. As with all weapons, range has a major influence on design, not only for the amount of fuel carried onboard, but also how close to the target the carrying platform needs to be before launch. A longer-range weapon permits planners to undertake more circuitous routes, reducing exposure to detection. It also can allow for attacks to be conducted from several different directions to overwhelm air defenses, or alternatively, several targets can be struck simultaneously in different parts of a country by multiple weapons to achieve a particular effect. In addition to fuel, designers also must consider the type of warhead as commanders would like to ensure the weapon can deal with any target it strikes once it gets there. Both the Storm Shadow/Scalp Taurus KEPD 350 and Lockheed JASSM, arguably the most commonly exported air-launched cruise missiles, are kitted with penetrating warheads to deal with hardened targets such as command-and-control bunkers and hardened aircraft shelters. Other factors in cruise missile design include responsiveness. Missile experts suggest planners need to be able to take advantage of windows of opportunity, such as the movement of air defenses to different sites, opening a gap through which the missile can fly. The missile itself also must be survivable; many of the new-generation, modern air-defense systems have been developed to track and shoot down cruise missiles. One of the primary roles of Russia's Mikoyan MiG-31 Foxhound is to intercept and down air-launched cruise missiles and, if possible, their carrying aircraft. “Survivability [of the cruise missile] is not a military capability requirement,” an industry expert on air-launched cruise missiles tells Aviation Week. “But clearly without it, you can't go somewhere, meet the range or achieve the effect that the military planners want.” The push for survivability has driven manufacturers to incorporate more low-observability design aspects and materials to reduce the radar cross-section of the weapon, as can be seen with the Storm Shadow/Scalp and JASSM. The basic cruise missile configuration is dominated by the warhead, fuel and engine. Each has its own trade-offs, so missile engineers are faced with balancing the requirements of range over warhead size—particularly as cruise missiles' strategic targets are often large, sometimes even hardened fixed structures. More efficient, small turbofan engines, rather than turbojets, have helped to boost range while the remaining missile fuel can enhance the explosive power when combined with the warhead. Perhaps one of the biggest challenges of cruise missile use is the mission planning process. Most cruise missiles will have undergone an extensive planning process prior to launch, with the path of flight often defined by a set of waypoints in the sky—and with more advanced weapons, the construction of 3D digital models of the target so onboard seekers can recognize it. The process can be quite granular, down to the height at which the weapon will cruise during most of its flight, attack angles and when to switch on seekers. Imperfect geographic data means some latitude has to be built in to ensure the weapon comfortably avoids crashing into high ground when using onboard terrain databases. Nearly all cruise missiles will have a basic capability to fly to a GPS coordinate. More advanced weapons can operate in GPS-denied environments, recognizing their targets using imaging onboard seekers so the weapon can pick out the target structure in cluttered terrain. “The seeker on the front of the missile provides more flexibility,” a missile industry expert states. “In some cases a target can be difficult to differentiate, so we may need to use a target basket to locate a target in a certain area of engagement.” Such seekers include electro-optical and infrared types, but future developments could include the use of laser-based Lidar and even radio-frequency seekers that could allow the weapon to pick out and identify its target earlier. During the Cold War, such accuracy was less important. The missiles could hit within tens of meters of the desired hit points and, when equipped with nuclear warheads, their kilotons of destructive power could comfortably knock out most targets. “High accuracy today means that commanders have confidence you can do the damage you need to with conventional warheads,” says Douglas Barrie, senior fellow for military aerospace at the London-based International Institute for Strategic Studies. But the slow process of mission planning means cruise missiles are less effective against potentially fleeting targets of opportunity, a concern that is prompting development of speedier planning and faster missiles. “High speed is a way forward for cruise missiles,” says the missile expert. “It lends itself to responsiveness, it is a simpler activity to plan and it increases the element of surprise.” But high speed comes with its own challenges. Such a weapon can be difficult to design and will need to be finely tuned, with little room to make changes, say experts. Most supersonic cruise missiles are either anti-ship types with a limited land-attack capability such as the Indian/Russian BrahMos, or more specialized weapons such as France's nuclear-roled ASMP-A—which Paris plans to replace with an even faster, possibly scramjet-powered weapon called the ASN4G, in the 2030s. Experts believe there is a role for both high-speed and subsonic weapons. The subsonic missile, on the other hand, is more of a “bomb truck,” says the missile industry expert. With their big boxy airframes, such weapons “are quite resilient to changing things inside, so it supports a flexible future. “For high speed, we [industry] are still grappling with developing technologies for propulsion and . . . for controlling the airframe. . . . There's still a lot of technology growth to take place.” Governments increasingly desire such capabilities, particularly in the new era of great-power competition. But while sales are lucrative, cruise missiles are not easy to export. Transfers continue to be governed by the Missile Technology Control Regime (MTCR) whose 35 signatories aim to prevent the proliferation of technology that could lead to long-range nuclear-weapon delivery systems. Many of the countries' weapons with ranges of over 300 km (190 mi.) are considered in Category 1 and face the greatest restraint in terms of transfers, while controls on weapons with a range of less than 300 km are less strict, with decisions often based on national discretion. However, the MTCR rules seem likely to evolve, particularly as the U.S. looks to export more unmanned air systems, which were previously covered by the regime. But even if the weapons are not being exported, more nations than ever are achieving the technical prowess to develop indigenous cruise missiles, and not all are MTCR signatories. So as the threat to airpower from ground-based defenses grows, the desire for such weapons is turning to necessity, as it seems likely such weapons will play an even bigger role in future conflicts beyond the opening salvos. https://aviationweek.com/defense-space/missile-defense-weapons/airpower-demands-drive-air-launched-cruise-missile-evolution

  • DARPA program blending robots in the squad to find and destroy threats

    31 décembre 2018 | International, C4ISR

    DARPA program blending robots in the squad to find and destroy threats

    By: Todd South The agency that invented stealth technology, the internet, and the M16 has its sights focused on enhancing how the infantry squad works on the battlefield with robots, and advanced targeting and sensing gear. The Squad X program saw its first week-long series of tests at Twentynine Palms, California, this past year. At that event, Marine squads used air and ground vehicles to detect physical, electromagnetic and cyber threats, according to the Defense Advanced Research Projects Agency. The agency's program manager for their Tactical Technology Office, Army Lt. Col. Phil Root said that the first experiment in the program demonstrated “the ability for the squad to communicate and collaborate, even while ‘dancing on the edge of connectivity.'” Squad X Core Technologies program, or SXCT, is an ongoing effort to develop novel technologies that would “extend squad awareness and engagement capabilities without imposing physical and cognitive burdens,” according to a DARPA press release. They aim to speed the development of new, lightweight, integrated systems that provide infantry squads awareness, adaptability and flexibility in complex environments. That effort is to enable dismounted soldiers and Marines to more intuitively understand and control their complex mission environments, according to Root. Those efforts fit within wider work being done by the Close Combat Lethality Task Force, a group set up this past year to enhance close combat capabilities for infantry, special operations, scouts and some engineers. Root is also the program manager for Squad X Core Technologies. He laid out four key technical areas that the program is exploring: Precision Engagement: Precisely engage threats while maintaining compatibility with infantry weapon systems and without imposing weight or operational burdens that would negatively affect mission effectiveness. Capabilities of interest include distributed, non-line-of-sight targeting and guided munitions. Non-Kinetic Engagement: Disrupt enemy command and control, communications and use of drones. Capabilities of interest include disaggregated electronic surveillance and coordinated effects from distributed platforms. Squad Sensing: Detect potential threats at a squad-relevant operational pace. Capabilities of interest include multi-source data fusion and autonomous threat detection. Squad Autonomy: Increase squad members' real-time knowledge of their own and teammates' locations in GPS-denied environments using embedded unmanned air and ground systems. Capabilities of interest include robust collaboration between humans and unmanned systems. Some of those areas were previously explored in 2015 with DARPA's squad technology integration efforts. The tools used to detect threats in the experiments were newer, lighter, versions of previous capabilities. But the release did not provide detailed examples of the gear that Marines tested. “Each run, they learned a bit more on the systems and how they could support the operation,” said Root. “By the end, they were using the unmanned ground and aerial systems to maximize the squad's combat power and allow a squad to complete a mission that normally would take a platoon to execute.” The August event at the Marine Corps Air Ground Combat Center was one of a number of experiments in communications, cyber, EW, loitering munitions and targeting that was conducted over the past year. Both Lockheed Martin Missiles and Fire Control, and CACI's BIT Systems are working for ways to enhance infantry capabilities using manned-unmanned teaming, according to the release. Marines testing Lockheed Martin's Augmented Spectral Situational Awareness, and Unaided Localization for Transformative Squads, known as the ASSAULTS system, used autonomous robots with sensor systems to detect enemy locations, allowing the Marines to target the enemy with a precision 40mm grenade before the enemy could detect their movement, according to the release. Small units using CACI's BITS Electronic Attack Module were able to detect, locate, and attack specific threats in the radio frequency and cyber domains. This is all part of larger efforts to put more detection and fires at lower echelons in both the Army and Marine Corps. https://www.militarytimes.com/news/your-army/2018/12/30/darpa-program-blending-robots-in-the-squad-to-find-and-destroy-threats

  • Contract Awards by US Department of Defense - January 31, 2019

    4 février 2019 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité, Autre défense

    Contract Awards by US Department of Defense - January 31, 2019

    NAVY Huntington Ingalls Industries - Newport News Shipbuilding, Newport News, Virginia, is awarded the detail design and construction (DD&C) efforts for nuclear-powered aircraft carriers Enterprise (CVN 80) and unnamed CVN 81 under the following contract actions: (1) A $14,917,738,145 fixed-price-incentive-firm target modification to previously awarded contract N00024-16-C-2116 for DD&C efforts for the future USS Enterprise (CVN 80) and unnamed CVN 81. The current contract for advance procurement funded efforts has been in place since 2016. (2) A $263,096,868 cost-plus-fixed-fee modification to previously awarded contract N00024-16-C-2116 for associated research and development efforts. (3) A $31,097,671 cost-plus-fixed-fee modification for additional level-of-effort in support of maintenance of the CVN 78 class specification, design efforts, feasibility and tradeoff studies, and scoping and estimating. Work under this contract will be performed in Newport News, Virginia (62 percent); Sunnyvale, California (5 percent); Coatesville, Pennsylvania (3 percent); Wellsville, New York (1 percent); Cincinnati, Ohio (1 percent); Milwaukee, Wisconsin (1 percent); and various locations below one percent (27 percent), and is expected to be completed by February 2032. Fiscal 2018 and 2019 shipbuilding and conversion (Navy) funding; and fiscal 2019 research, development, test and evaluation (Navy) funding in the amount of $889,830,279 will be obligated at time of award and will not expire at the end of the current fiscal year. This contract was not competitively procured, in accordance with Federal Acquisition Regulation 6.302-1(a)(2)(iii) - only one responsible source and no other supplies or services will satisfy agency requirements. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity. AECOM Construction Inc., Arlington, Virginia (N40085-19-D-9066); Archer Western Federal JV, Chicago, Illinois (N40085-19-D-9067); Hourigan Construction Co., Virginia Beach, Virginia (N40085-19-D-9068); RQ Construction LLC, Carlsbad, California (N40085-19-D-9069); The Whiting Turner Contracting Co., Greenbelt, Maryland (N40085-19-D-9070); and W.M. Jordan Co. Inc., Newport News, Virginia (N40085-19-D-9089), are each awarded an indefinite-delivery/indefinite-quantity, multiple-award design-build/design-bid-build construction contract for construction projects, located primarily within the Naval Facilities Engineering Command (NAVFAC) Mid-Atlantic Hampton Roads area of responsibility (AOR). The maximum dollar value for all six contracts combined is $249,000,000. The work to be performed provides for but is not limited to, new construction, renovation, alteration, demolition, and repair work for industrial, warehouses, airfield, aircraft hangar, aircraft traffic control, infrastructure, administrative, training, dormitory, recruit barracks, mess facilities, assembly facilities, medical facilities and community support facilities. AECOM Construction Inc. is awarded the initial task order at $27,640,890 for the design and construction of a new bachelor enlisted quarters at Naval Weapons Station Yorktown, Virginia. The task order also contains three planned modifications, which if exercised would increase cumulative contract value to $29,272,575. Work for this task order is expected to be completed by May 2021. All work on this contract will be performed in the NAVFAC Mid-Atlantic Hampton Roads AOR, Virginia. The term of the contract is not to exceed 60 months, with an expected completion of January 2024. Fiscal 2018 military construction (Navy) contract funds in the amount of $27,640,890 are obligated on this award and will not expire at the end of the current fiscal year. Future task orders will be primarily funded by operations and maintenance (Navy); and military construction (Navy). This contract was competitively procured via the Navy Electronic Commerce Online website, with 18 proposals received. These six contractors may compete for task orders under the terms and conditions of the awarded contract. NAVFAC Mid-Atlantic, Norfolk, Virginia, is the contracting activity. Bechtel Plant Machinery Inc., Monroeville, Pennsylvania, is awarded a $95,257,528 cost-plus-fixed-fee modification to previously awarded contract N00024-16-C-2106 to exercise an option for naval nuclear propulsion components. Work will be performed in Monroeville, Pennsylvania (94 percent); and Schenectady, New York (6 percent), and is expected to be complete by September 2028. Fiscal 2019 shipbuilding and conversion (Navy) funding in the amount of $95,257,528 will be obligated at time of award and will not expire at the end of the current fiscal year. No additional information is provided on Naval Nuclear Propulsion Program contracts. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity. Kay and Associates Inc., Buffalo Grove, Illinois, is awarded $63,016,210 for modification P00007 to a previously awarded cost-plus-fixed-fee contract (N0042117C0044) to exercise an option for maintenance and support services for F/A-18 C/D and associated equipment in support of the government of Kuwait. Work will be performed at various locations in Kuwait including Almed Al-Jaber Air Base (98.38 percent); Kuwaiti Air Force Headquarters (6.04 percent); Air Institute/Air Defense Base (1.89 percent); and Subhan/Air Defense Base (1.13 percent). Work is expected to be completed in January 2020. Foreign Military Sales funds in the amount of $63,016,210 are being obligated at time of award, none of which will expire at the end of the current fiscal year. The Naval Air Warfare Center Aircraft Division, Patuxent River, Maryland, is the contracting activity. Rolls-Royce Corp., Indianapolis, Indiana, is awarded a $41,967,720 modification to a previously awarded firm-fixed-price contract N00019-17-C-0081 for the procurement of 20 production Marine Turbine (MT7) engines for the Landing Craft, Air Cushion (LCAC) 100 Class craft in support of the Ship to Shore Connector program. Each LCAC 100 craft consists of four MT7 engines. Work to be performed includes production of the MT7 engines and delivery to Textron Marine Systems for the assembly of the LCAC 100 Class craft. Work will be performed in Indianapolis, Indiana, and is expected to be complete by December 2020. Fiscal 2018 shipbuilding and conversion (Navy) funding in the amount of $41,967,720 will be obligated at time of award and will not expire at the end of the current fiscal year. The Naval Sea Systems Command Washington, District of Columbia, is the contracting activity. Hamilton Sundstrand Corp., Windsor Locks, Connecticut, is awarded a $27,705,545 cost-plus-fixed-fee, indefinite-delivery/indefinite-quantity contract in support of engineering services and on-site support services to explore and resolve issues associated with various submarine air revitalization, monitoring, oxygen generation and ventilation systems on U.S. naval ships. Work will be performed at various locations including New London, Connecticut; Philadelphia, Pennsylvania; Norfolk, Virginia; Kings Bay, Georgia; San Diego, California; Bremerton, Washington; Pearl Harbor, Hawaii; and Norway, and is expected to be completed by January 2024. Fiscal 2019 operations and maintenance (Navy) funding in the amount of $29,081 will be obligated at time of award on the initial task order and will not expire at the end of the current fiscal year. This contract was not competitively procured, in accordance with 10 U.S. Code 2304(c)(1) - only one responsible source and no other supplies or services will satisfy agency requirements. The Naval Surface Warfare Center, Philadelphia Division, Philadelphia, Pennsylvania, is the contracting activity (N64498-18-D-4000). L-3 Communications Vertex Aerospace LLC, Madison, Mississippi, is awarded $18,721,174 for modification P00037 to a previously awarded firm-fixed-price, labor hour, cost-reimbursement indefinite-delivery, requirements contract (N00019-13-D-0007). This modification extends the period of performance and increases the ceiling of the contract to provide TH-57 contractor logistics support. This modification provides all logistics services and materials for organizational and depot level repairs required to support and maintain the TH-57 fleet. Work will be performed in Milton, Florida, and is expected to be completed in March 2019. No funds are being obligated at time of award. Funds will be obligated on individual orders as they are issued. The Naval Air Warfare Center Training Systems Division, Orlando, Florida, is the contracting activity. Northrop Grumman Systems Corp., Herndon, Virginia, is awarded a $17,774,920 firm-fixed-price modification to previously awarded contract N00024-17-C-6327 to exercise options for the Joint Counter Radio-Controlled Improvised Explosive Device Electronic Warfare Increment One Block One Systems full-rate production in support of the Expeditionary Warfare Program Office. Work will be performed in San Diego, California, and is expected to be complete by November 2020. Fiscal 2019 and 2018 Overseas Contingency Operations other procurement (Navy); and 2018 other procurement (Navy) funds in the amount of $9,967,278 will be obligated at time of award and not expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity. Raytheon Co., Tewksbury, Massachusetts, is awarded a $15,850,000 firm-fixed-price modification to previously-awarded contract N00024-10-C-5126 for a provisioned items order of DDG 1000 class mission systems equipment interim spares in support of the Zumwalt Class combat systems program office. The DDG 1000 ship class is a multi-mission surface combatant designed to fulfill volume firepower and precision strike requirements. DDG 1000 combat systems provide offensive, distributed and precision firepower and long ranges in support of forces ashore, while incorporating signature reduction, active and passive self-defense systems and enhanced survivability features. Work will be performed in Portsmouth, Rhode Island (40 percent); Largo, Florida (35 percent); Tewksbury, Massachusetts (10 percent); Nashua, New Hampshire (10 percent); and Marlboro, Massachusetts (5 percent), and is expected to be completed by July 2021. Fiscal 2018 and fiscal 2019 shipbuilding and conversion (Navy) funding in the amount of $15,850,000 will be obligated at time of award and will not expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity. Progeny Systems Corp.,* Manassas, Virginia, is awarded a $14,750,184 cost-plus-fixed-fee contract to deliver the Integrated Shipboard/Shore-based Maintenance Management Decision Tool and related engineering and technical services via the Nosis software infrastructure and build process. This effort will produce, deliver and support continuously updated Nosis functionality in a common software build to Virginia, Columbia, Los Angeles, Ohio, and Seawolf submarines, as well as aircraft carrier propulsion plants. This contract includes options which, if exercised, would bring the cumulative value of this contract to $85,654,305. Work will be performed in Manassas, Virginia (30 percent); Groton, Connecticut (25 percent); Bremerton, Washington (15 percent); Las Vegas, Nevada (10 percent); Cleveland, Ohio (10 percent); Chesapeake, Virginia (4 percent); Pearl Harbor, Hawaii (2 percent); San Diego, California (2 percent); and Kings Bay, Georgia (2 percent), and is expected to be complete by January 2020. Fiscal 2019 research, development, test and evaluation; fiscal 2014 and 2015 shipbuilding and conversion (Navy); and fiscal 2019 other procurement (Navy) funding in the amount of $14,318,371 will be obligated at time of award and will not expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity (N00024-19-C-6204). Northrop Grumman Systems Corp., Aerospace Systems, Melbourne, Florida, is awarded $11,278,884 for cost-plus-fixed-fee order N0001919F2667 against a previously issued basic ordering agreement (N00019-15-G-0026). This order provides for aerial refueling envelope expansion and objective tanker qualification testing in support of the E-2D Advanced Hawkeye aircraft. Work will be performed in Patuxent River, Maryland (75 percent); and Melbourne, Florida (25 percent), and is expected to be completed in January 2021. Fiscal 2019 research, development, test and evaluation (Navy) funds in the amount of $4,000,000 will be obligated at time of award, none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. Bilbro Construction Co., Inc.,* Escondido, California, is awarded $11,220,661 for firm-fixed-price task order N6247319F4265 under a previously awarded multiple award construction contract (N62473-17-D-4630) for removal of two existing absorption chillers and replace with two steam turbine driven centrifugal in Building 7 at Naval Medical Center, San Diego. The work to be performed provides for the removal of two non-functioning steam absorption chillers and replacement of two steam driven centrifugal chillers. Work also includes equipment pads to support chillers, piping and fittings to connect from chillers to existing infrastructure, and electrical wiring for connection of chillers. The project also provides controls for chillers and integration with existing control system, conducting performance verification and testing of chillers and installation of refrigerant monitoring system. The task order contains base items 0001, 0002, 0003, 0004, and 0005. Work will be performed in San Diego, California, and is expected to be completed by August 2020. Fiscal 2019 Defense Working Capital (Navy) contract funds in the amount of $11,220,661 are obligated on this award and will not expire at the end of the current fiscal year. Five proposals were received for this task order. Naval Facilities Engineering Command Southwest, San Diego, California, is the contracting activity. Treadwell Corp., Thomaston, Connecticut, is awarded a $9,381,592 cost-reimbursable, indefinite-delivery/indefinite-quantity contract in support of engineering and in-service engineering services for submarine air revitalization, air monitoring, oxygen generation and ventilation on U.S. naval ships. Work will be performed at various locations worldwide including New London, Connecticut; Philadelphia, Pennsylvania; Norfolk, Virginia; San Diego, California; Bremerton, Washington; Guam; Diego Garcia; and Pearl Harbor, Hawaii, and is expected to be completed by January 2022. Fiscal 2019 operations and maintenance (Navy) funding in the amount of $35,503 will be obligated on the first task order placed at time of award and will not expire at the end of the current fiscal year. This contract was not competitively procured, in accordance with 10 U.S. Code 2304(c)(1) - only one responsible source and no other supplies or services will satisfy agency requirements. The Naval Surface Warfare Center, Philadelphia Division, Philadelphia, Pennsylvania, is the contracting activity (N64498-18-D-4003). AIR FORCE Engility Corp., Andover, Massachusetts, has been awarded a $655,000,000 firm-fixed-price, cost-reimbursement contract for services supporting the Space and Missile Systems Center Advanced Systems and Development Directorate, Ground Systems and Space Operations Division at Kirtland Air Force Base, New Mexico. This contract provides engineering, development, integration, and sustainment services supporting the current Ground System Enterprise throughout its evolution, including the transition to and buildout of Enterprise Ground Services. Work will be performed at Kirtland Air Force Base, New Mexico; and Schriever Air Force Base, Colorado, and is expected to be completed by Jan. 31, 2026. This award is the result of a competitive acquisition and five offers were received. For the first task order award (FA8818-19-F-0007), fiscal 2019 operations and maintenance funds in the amount of $1,500,000 are being obligated at the time of award. Space and Missile Systems Center Kirtland Air Force Base, New Mexico, is the contracting activity (FA8818-19-D-0003). Lockheed Martin Corp., Orlando, Florida, has been awarded a $100,690,961 cost-plus-incentive-fee modification (P00002) to contract FA8682-18-C-0009 which provides for design, development, integration and testing of subsystem design changes for the wings/chines to the Joint Air-to-Surface Standoff Missile - Extended Range baseline missile. Work will be performed in Orlando, Florida, and is expected to be completed by March 31, 2023. This award is the result of sole-source acquisition. Fiscal 2019 research, development, test and evaluation funds will provide funding for the contract. Air Force Life Cycle Management Center, Eglin Air Force Base, Florida, is the contracting activity. Rolls-Royce Corp., Indianapolis, Indiana, has been awarded a $70,706,540 firm-fixed-price delivery order (FA8504-19-F-0008) to contract FA8504-17-D-0002 for C-130J propulsion long term sustainment. This order provides for funding of Option II. Work will be performed at Robins Air Force Base, Georgia, and other locations, and work is expected to be completed by Jan. 31, 2020. Fiscal 2019 procurement funds are being obligated at the time of award. Total cumulative face value of the contract is $70,706,540. Air Force Life Cycle Management Center, Robins Air Force Base, Georgia, is the contracting activity. Teledyne Scientific & Imaging LLC, Thousand Oaks, California, has been awarded a $16,448,132 modification (P00005) to contract FA9453-17-C-0037 for Fortress program to establish thrust to pursue medium wavelength infrared and long wavelength infrared HgCdTe based detector technologies with a higher performance than conventional HgCdTe photodiodes. The contract modification intends to pursue these novel HgCdTe detector technologies in parallel with conventional HgCdTe and III-V based unipolar barrier infrared detectors but grown on larger substrates. Work will be performed in Thousand Oaks, California, and is expected to be completed by March 12, 2022. Fiscal 2018 and research, development, test and evaluation; and Title III funds in the amount of $6,750,000 are being obligated at the time of award. Total cumulative face value of the contract is $22,381,868. Air Force Research Laboratory, Kirtland Air Force Base, New Mexico, is the contracting activity. Copper River ES, Anchorage, Alaska, has been awarded an $8,549,387 definitive, firm-fixed-price contract for production support services. This contract provides for direct labor for support services and depot avionics technical repairs operations at Robins Air Force Base, Georgia. The contractor shall supply labor and management to provide technical and administrative production support services for the 402nd Electronics Maintenance Group. Work will be performed at Robins Air Force Base, Georgia, and is expected to be completed Jan. 27, 2020. This award is the result of a direct-award acquisition. Fiscal 2019, working capital funds in the amount of $6,438,290 are being obligated at the time of award. Air Force Sustainment Center, Robins Air Force Base, Georgia, is the contracting activity (FA8571-19-C-A006). AKIMA Logistics Services LLC, Herndon, Virginia, has been awarded a $7,798,197 firm-fixed-price option indefinite-delivery/indefinite-quantity contract for full contractor logistics support of 58 U.S. Air Force Academy aircraft. Work will be performed at the U.S. Air Force Academy, Colorado Springs, Colorado; Peterson Air Force Base, Colorado; and the U.S. Air Force Academy auxiliary airfield, and is expected to be completed by Jan. 31, 2020. Air Force Life Cycle Management Center, Tinker Air Force Base, Oklahoma, is the contracting activity (FA8106-19-F-8001). ARMY General Dynamics Land Systems, Sterling Heights, Michigan, was awarded a $402,163,806 cost-plus-fixed-fee contract for Stryker system technical support services. Bids were solicited via the internet with one received. Work locations and funding will be determined with each order, with an estimated completion date of Jan. 31, 2024. U.S. Army Contracting Command, Warren, Michigan, is the contracting activity (W56HZV-19-D-0046). Bauer Foundation Corp., Odessa, Florida (W912EP-19-D-0012); Bencor Global Inc., Frisco, Texas (W912EP-19-D-0013); and Treviicos South Inc., Charlestown, Massachusetts (W912EP-19-D-0014), will compete for each order of the $387,000,000 firm-fixed-price contract for Herbert Hoover Dike rehabilitation dam modification cutoff wall. Bids were solicited via the internet with three received. Work locations and funding will be determined with each order, with an estimated completion date of Jan. 30, 2024. U.S. Army Corps of Engineers, Jacksonville, Florida, is the contracting activity. Knox County Association for Remarkable Citizens Inc., Vincennes, Indiana, was awarded a $49,323,199 firm-fixed-price contract for wood pallets. One bid was solicited with one bid received. Work locations and funding will be determined with each order, with an estimated completion date of Jan. 30, 2024. U.S. Army Contracting Command, Rock Island Arsenal, Illinois, is the contracting activity (W52P1J-19-D-0014). J&J Maintenance Inc., Austin, Texas, was awarded a $42,601,783 firm-fixed-price contract for healthcare environmental services. One bid was solicited with one bid received. Work locations and funding will be determined with each order, with an estimated completion date of Jan. 31, 2020. U.S. Army Health Contracting Activity, San Antonio, Texas, is the contracting activity (W81K04-19-D-0011). DRS Sustainment Systems Inc., St. Louis, Missouri, was awarded a $74,864,274 cost-plus-fixed-fee contract for rapid development, production, deployment, and support of the Mobile-Low Slow, Small Unmanned Aircraft Integrated Defeat System. One bid was solicited with one bid received. Work will be performed in St. Louis, Missouri, with an estimated completion date of Jan. 30, 2020. Fiscal 2019 research, development, test and evaluation; operations and maintenance, Army; and other procurement, Army funds in the amount of $36,683,495 were obligated at the time of the award. U.S. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity (W31P4Q-19-C-0006). NIC4 Inc., Tampa, Florida, was awarded a $28,812,143 firm-fixed-price Foreign Military Sales (Iraq) contract for capabilities to operate, sustain, support and expand Iraq's Very Small Aperture Terminal network. Bids were solicited via the internet with five received. Work locations and funding will be determined with each order, with an estimated completion date of Jan. 31, 2024. U.S. Army Contracting Command, Aberdeen Proving Ground, Maryland, is the contracting activity (W91CRB-19-D-5000). Vectrus Systems Corp., Colorado Springs, Colorado, was awarded a $26,735,291 modification (P00026) to contract W91RUS-17-C-0010 for non-personal operations and maintenance supply services. Work will be performed in Germany and Italy with an estimated completion date of Jan. 31, 2022. Fiscal 2019 operations and maintenance, Army funds in the amount of $1 were obligated at the time of the award. U.S. Army Contracting Command, Aberdeen Proving Ground, Maryland, is the contracting activity. B.L. Harbert International LLC, Birmingham, Alabama, was awarded a $26,644,688 firm-fixed-price contract for the construction of a consolidated Nuclear Air Operations and Support Facility. Bids were solicited via the internet with 11 received. Work will be performed in Whiteman Air Force Base, Missouri, with an estimated completion date of Aug. 31, 2020. Fiscal 2019 military construction funds in the amount of $26,644,688 were obligated at the time of the award. U.S. Army Corps of Engineers, Kansas City, Missouri, is the contracting activity (W912DQ-19-C-4001). Raytheon Co., Andover, Massachusetts, was awarded a $16,350,543 modification (P00017) to contract W31P4Q-17-C-0003 for depot level diagnosis, clean up, repair and maintenance. Work will be performed in Andover, Massachusetts, with an estimated completion date of Jan. 31, 2020. Fiscal 2019 operations and maintenance, Army; and operations and maintenance, Army overseas contingency operations funds in the amount of $16,350,543 were obligated at the time of the award. U.S. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity. Marton Technologies Inc.,* Newport News, Virginia, was awarded a $15,962,505 modification (0001 73) to contract W52P1J-14-G-0021 for logistics support services. Work will be performed in Fort Riley, Kansas, with an estimated completion date of Jan. 31, 2020. Fiscal 2019 operations and maintenance, Army funds in the amount of $13,483,212 were obligated at the time of the award. U.S. Army Contracting Command, Rock Island Arsenal, Illinois, is the contracting activity. United Support Solutions - LMT Inc.,* Cedar Grove, New Jersey (W25G1V-19-D-0001); Finch Manufacturing & Technology LLC,* West Pittston, Pennsylvania (W25G1V-19-D-0002); and Central Metal Fabricators Inc.,* Farmingdale, New Jersey (W25G1V-19-D-0003), will compete for each order of the $10,000,000 firm-fixed-price contract to fabricate mechanical components and assemblies. Bids were solicited via the internet with three received. Work locations and funding will be determined with each order, with an estimated completion date of Jan. 30, 2024. U.S. Army Contracting Command, Aberdeen Proving Ground, Maryland, is the contracting activity. General Dynamics Land Systems, Sterling Heights, Michigan, was awarded a $7,969,810 modification (P00072) to contract W56HZV-17-C-0067 for Abrams systems technical support. Work will be performed in Sterling Heights, Michigan, with an estimated completion date of Feb. 28, 2020. Fiscal 2018 research, development, test and evaluation funds in the amount of $7,989,810 were obligated at the time of the award. U.S. Army Contracting Command, Warren, Michigan, is the contracting activity. Loch Harbour Group Inc.,* Alexandria, Virginia, was awarded a $7,247,076 modification (P00010) to contract W9124L-17-F-0003 for training instructors. Work will be performed in Fort Sill, Oklahoma, with an estimated completion date of Oct. 31, 2022. Fiscal 2019 operations and maintenance, Army funds in the amount of $7,247,076 were obligated at the time of the award. U.S. Army Mission and Installation Contracting Command, Fort Sill, Oklahoma, is the contracting activity. WASHINGTON HEADQUARTERS SERVICES NetCentrics Corp., Herndon, Virginia, has been awarded a $268,464,985 firm-fixed-price contract to provide Information Technology (IT) Support Services - Service Delivery. The specific tasks of this service delivery requirement will consist of satisfying Joint Service Provider (JSP) user needs for secure, accessible, and stable IT support. Service delivery services requires an understanding of the current operating environment of the JSP and the ability to leverage mature capabilities and industry best practices to improve efficiency and reduce complexity in order to enhance JSP's IT support services. Through the Service delivery requirement, the JSP seeks to deliver responsive IT services and support to its users in the most efficient manner as possible. Work performance will take place primarily in the National Capital Region, including the Pentagon, Mark Center, and Crystal City, Virginia. Fiscal 2019 operations and maintenance funds in the amount of $268,464,985 are being obligated on this award. The expected completion date is Feb. 27, 2023. Washington Headquarters Services, Arlington, Virginia, is the contracting activity (HQ0034-19-F-0093). DEFENSE LOGISTICS AGENCY Base Utilities Inc.,* Grand Forks, North Dakota, has been awarded a $41,055,519 modification (P00001) to a 50-year utilities privatization contract (SP0600-18-C-8322) with no option periods for additional utility services for two water and two wastewater systems. This is a fixed-price with economic-price-adjustment contract. Location of performance is North Dakota, with a Jan. 31, 2069, performance completion date. Using military service is Air Force. Type of appropriation is fiscal 2019 through 2069 Air Force operations and maintenance funds. The contracting activity is the Defense Logistics Agency Energy, Fort Belvoir, Virginia. Timken Aerospace Drive Systems LLC, Manchester, Connecticut, has been awarded a maximum $9,072,000 firm-fixed-price delivery order (SPRRA1-19-F-0132) against a three-year basic ordering agreement (SPRRA1-17-D-0014) for rotor link pin assemblies. This was a competitive acquisition with three responses received. This is a three-year indefinite-delivery/indefinite-quantity contract with three one-year option periods. Location of performance is Connecticut, with a July 30, 2021, performance completion date. Using military service is Army. Type of appropriation is fiscal 2019 Army working capital funds. The contracting activity is the Defense Logistics Agency Aviation, Redstone Arsenal, Alabama. DEFENSE INFORMATION SYSTEMS AGENCY ARTEL LLC, Herndon, Virginia, was awarded a contract modification (P00005) with an effective date of Feb. 2, 2019, to exercise Option Period One on task order GS-35F-5151H / HC101318F0016 for commercial satellite communications service. The face value of this action is $12,253,244 funded by fiscal 2019 operations and maintenance funds. The total cumulative face value of the task order is $77,474,994. Performance directly supports the Air Force's Central Command network architecture within the Southwest Asia area of responsibility. Quotations were solicited via the General Services Administration's Federal Supply Schedule, Information Technology Schedule 70, and one quotation was received from 29 offerors solicited. The period of performance for Option Period One is Feb. 2, 2019, through Feb. 1, 2020, and there are three remaining unexercised option periods for this task order. The Defense Information Technology Organization, Scott Air Force Base, Illinois, is the contracting activity. * Small Business https://dod.defense.gov/News/Contracts/Contract-View/Article/1745521/source/GovDelivery/

Toutes les nouvelles