1 septembre 2024 | International, Terrestre, Sécurité

Japan's military to spend on AI, automation, perks to combat recruitment crisis

Sur le même sujet

  • Airbus A330 MRTT becomes world’s first tanker certified for automatic air-to-air refuelling operations - Skies Mag

    19 juillet 2022 | International, Aérospatial

    Airbus A330 MRTT becomes world’s first tanker certified for automatic air-to-air refuelling operations - Skies Mag

    The A330 MRTT has become the world’s first tanker to be certified for automatic air-to-air refuelling boom operations in daylight, following a successful campaign in collaboration with the Republic of Singapore Air Forc

  • Contract Awards by US Department of Defense - November 27, 2018

    28 novembre 2018 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité

    Contract Awards by US Department of Defense - November 27, 2018

    ARMY Oshkosh Defense LLC, Oshkosh, Wisconsin, was awarded a $1,698,639,588 modification (P00163) to contract W56HZV-15-C-0095 to exercise available options for 6,107 vehicles and 22,166 kits. Work will be performed in Oshkosh, Wisconsin, with an estimated completion date of Sept. 30, 2019. Fiscal 2017, 2018 and 2019 other procurement, Army funds; and 2018 research, development, test and evaluation funds in the amount of $1,698,639,588 were obligated at the time of the award. U.S. Army Contracting Command, Warren, Michigan, is the contracting activity. Harris Corp., Colorado Springs, Colorado, was awarded a $217,670,998 hybrid (cost, cost-plus-fixed-fee and firm-fixed-price) contract for monitoring, configuring, and maintaining of the wideband satellite communications operational management system network. Bids were solicited via the internet with three received. Work will be performed in MacDill Air Force Base, Florida; Fort Meade, Maryland; Fort Detrick, Maryland; Peterson Air Force Base, Colorado; Wahiawa, Hawaii; Fort Buckner, Japan; and Landstuhl, Germany, with an estimated completion date of July 31, 2027. Fiscal 2019 operations and maintenance, Army funds in the amount of $7,912,428 were obligated at the time of the award. U.S. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity (W91260-19-C-0001). Northop Grumman, Herndon, Virginia, was awarded a $37,235,028 modification (P00108) to contract W911S0-11-C-0014 for support services at Fort Leavenworth's center of excellence in combined arms education, doctrine, and leadership training. Work will be performed in Fort Leavenworth, Kansas, with an estimated completion date of May 31, 2019. Fiscal 2019 operations and maintenance, Army funds in the amount of $37,235,028 were obligated at the time of the award. U.S. Army Mission and Installation Contracting Command, Fort Eustis, Virginia, is the contracting activity. Barrett Firearms Mfg. Inc., Christiana, Tennessee, was awarded a $7,952,249 firm-fixed-price contract for the procurement of M107, Caliber .50 Long Range Sniper Rifle systems with scope, suppressor and spare kits, M82A1M Caliber .50 Rifle and M107A1. Bids were solicited via the internet with one received. Work locations and funding will be determined with each order, with an estimated completion date of Nov. 26, 2023. U.S. Army Contracting Command, New Jersey, is the contracting activity (W15QKN-19-D-0009). NAVY Rockwell Collins Simulation & Training Solutions, Cedar Rapids, Iowa, is awarded $21,118,233 for modification P00001 to a previously awarded firm-fixed-price, cost-plus-fixed-fee contract (N6134018C00051) to procure four E-2D Advanced Hawkeye Integrated Training System Distributed Readiness Trainers. These medium fidelity tactics trainers focus on interoperability for distributed training that is required to stay concurrent with the aircraft, and will be delivered with E-2D Delta Software System Configuration 2 (DSSC-2) and with future DSSCs to be integrated into the system later. Work will be performed in Sterling, Virginia (60 percent); the Marine Corps Air Station Iwakuni, Japan (20 percent); Naval Base Ventura County Point Mugu, California (10 percent); and Naval Air Station Norfolk, Virginia (10 percent), and is expected to be completed in January 2022. Fiscal 2019 aircraft procurement (Navy) funds in the amount of $21,118,233 will be obligated at the time of award; none of which will expire at the end of the current fiscal year. The Naval Air Warfare Center Training Systems Division, Orlando, Florida, is the contracting activity. AIR FORCE Apogee Research LLC, Arlington, Virginia, has been awarded an $8,335,013 cost-plus-fixed-fee contract for a software systems. This contract provides for developing techniques and software systems that will substantially accelerate software vulnerability research. The Computers and Humans Exploring Software Security program will develop computer-human software systems and capabilities to rapidly discover all classes of vulnerabilities in complex software in a scalable, timely, and consistent manner. Work will be performed in Arlington, Virginia, and is expected to be completed by May 26, 2022. This award is the result of a competitive acquisition and 50 offers were received. Air Force Research Laboratory, Rome, New York, is the contracting activity (FA8750-19-C-0010). WASHINGTON HEADQUARTERS SERVICES Didlake Inc., Manassas, Virginia, was awarded a $7,806,079 firm fixed-price contract. The contract provides custodial services at the Pentagon. Work performance will take place at the Pentagon and Pentagon Reservation in Arlington, Virginia. Pentagon Reservation Maintenance Revolving Fund funds in the amount of $7,806,079 are being obligated on this award. The expected completion date is Nov. 30, 2019. Washington Headquarters Services, Arlington, Virginia, is the contracting activity (HQ0034-15-C-0028). *Small business https://dod.defense.gov/News/Contracts/Contract-View/Article/1699233/

  • Aviation Week Forecasts: Western C4ISR Commercial Airliner Aircraft MRO 2020-2029

    23 juin 2020 | International, Aérospatial, C4ISR

    Aviation Week Forecasts: Western C4ISR Commercial Airliner Aircraft MRO 2020-2029

    June 23, 2020 Aviation Week Network forecasts that from 2020 to 2029, Western-built commercial airliners performing military C4ISR (command, control, communications, computers, intelligence, surveillance and reconnaissance) missions will generate $20.7 billion in maintenance, repair and overhaul (MRO) demand, declining 4% over the decade. These figures only include aircraft categorized as commercial airliners that are specifically equipped to perform C4ISR missions against land and airborne targets—everything from aircraft equipped with just electro-optic/infrared (EO/IR) devices to sophisticated electronic warfare platforms. Excluded are observation aircraft not specially equipped for C4ISR missions, any dedicated search-and-rescue aircraft, and military VIP transports. The single largest source of MRO demand over the forecast is the Boeing 707, which will produce a dominant 78.6% of the global forecast total. The 707 is the base airframe for 13 different C4ISR platforms around the globe, including the U.S.'s E-3, E-6, and E-8 fleets. Despite the dominance, the 707's annual demand will decline 14.5% in the next 10 years. Boeing's queen of the skies, the 747, will produce the second most MRO demand this decade, albeit a 10th of the 707. The 747 takes the lead in terms of MRO decline, shedding 33.5% of its demand by 2029 as the U.S. Air Force is expected to retire some of its smallest but most expensive-to-maintain fleets like the E-4. There is an estimated $330 million in MRO demand for yet-undecided military competitions and requirements that are assessed to be won by a commercial airliner C4ISR platform. While only 1.6% of the forecast total, it is 7.1% of the total in 2029, making it the second-largest source of MRO that year. https://aviationweek.com/defense-space/z/aviation-week-forecasts-western-c4isr-commercial-airliner-aircraft-mro-2020-2029

Toutes les nouvelles