15 janvier 2021 | International, Aérospatial

Indian government clears $6.5 billion deal for homemade Tejas fighter jets

By:

NEW DELHI — India on Wednesday cleared the country's largest-ever indigenous defense deal worth $6.5 billion for the purchase of 83 LCA MK1A Tejas light combat aircraft.

The deal was approved by the government's apex security body, the Cabinet Committee on Security, which is chaired by Prime Minister Narendra Modi.

The deal will see state-owned Hindustan Aeronautics Limited manufacture 73 LCA MK1A Tejas fighter versions and 10 trainers versions, the Ministry of Defence said.

“This deal will be a game-changer for self-reliance in Indian defence manufacturing. It would act as a catalyst for transforming the domestic aerospace ecosystem. The LCA-Tejas is going to be the backbone of the [Indian Air Force] fighter fleet in the years to come,” Defence Minister Rajnath Singh said.

“Under the Atmanirbhar Bharat Abhiyaan [Self-Reliant India Initiative], India is continuously growing in its power to indigenously design, develop and manufacture advanced cutting edge technologies and systems in the defence sector,” the MoD said in a statement. “About 500 Indian companies including MSMEs [micro, small and medium enterprises] in the design and manufacturing sectors will be working with HAL in this procurement. The programme would act as a catalyst for transforming the Indian aerospace manufacturing ecosystem into a vibrant self-sustaining ecosystem.”

The MoD said this deal is the first “Buy (Indian-Indigenously Designed, Developed and Manufactured)” category procurement of combat aircraft with indigenous content of at least 50 percent — and it's expected that will increase to 60 percent by the end of the program.

HAL Chairman Ramakrishnan Madhavan said the Tejas program will involve the highest level of local work in comparison to any Indian program of this scale.

According to a senior HAL executive, the private defense companies that will support assembly include Larsen & Toubro for the wings, Dynamatic Technologies for the front fuselage, Alpha Tokal for the rear fuselage, and VEM Technologies for the center fuselage.

The LCA MK1A fighters will have new capabilities including midair refueling; improvement in operational roles; enhanced combat capability; maintainability improvements; and active electronically scanned array radar, an electronic warfare suite and beyond-visual-range missile capabilities, a company executive said.

The Indian Air Force will sign a formal contract with HAL during the Aero India air show in Bengaluru next month, according to an MoD official.

Each LCA MK1A fighter is powered by a single F404-GE-IN20 engine, and each jet will cost about $78.5 million, another HAL executive said, adding that the program is expected to generate 5,000 jobs in India.

https://www.defensenews.com/air/2021/01/14/indian-government-clears-65-billion-deal-for-homemade-tejas-fighter-jets

Sur le même sujet

  • Dispute Not Stalling F-35 Testing System, Lockheed Martin Says

    4 décembre 2019 | International, Aérospatial

    Dispute Not Stalling F-35 Testing System, Lockheed Martin Says

    By Bill Carey ORLANDO, Florida—A legal dispute between Lockheed Martin and the U.S. government that held up development of a key F-35 testing system is not further delaying the effort, says the manufacturer, which is awaiting a verdict by the Armed Services Board of Contract Appeals (ASBCA). Lockheed Martin has delivered its products to the Naval Air Systems Command (Navair) to build the Joint Simulation Environment (JSE), including an “F-35 In a Box” software module that replicates the fighter's mission systems for testing purposes. The software module contains nine algorithms that the manufacturer claims as intellectual property (IP), which the government disputes. The Pentagon is relying on activation of the JSE, a high-fidelity modeling and simulation environment, to complete mission testing required for the F-35's initial operational test and evaluation phase and a full-rate production decision. But the dispute over intellectual property rights has delayed the JSE by 2 1/2 years, according to acquisition executives. The JSE was supposed to begin operating in late 2017 but now is scheduled to achieve the first-use milestone in July 2020, Robert Behler, Pentagon director of Operational Test and Evaluation, told lawmakers during a House Armed Services subcommittee hearing last month. During a briefing Dec. 3 at the Interservice/Industry Training, Simulation and Education Conference, Chauncey McIntosh, Lockheed Martin vice president for F-35 training and logistics, said the IP dispute is not holding back Navair's development of the JSE. “Lockheed Martin has delivered all of its products to the Navair team,” including the F-35 In a Box module, McIntosh said. “The JSE team is currently integrating that product along with the other products that they're fielding. There is no dispute that is preventing development of the Joint Simulation Environment for Navair.” When a Defense Contracts Audit Agency review found no proof of Lockheed Martin's IP claim, the manufacturer appealed to the ASBCA. It continues to await a decision. “We are supporting that appeal and [will] progress from there based on what happens with the appeal,” McIntosh said. Also testifying before the House Armed Services subcommittee on Nov. 13, Air Force Lt. Gen. Eric Fick, F-35 program executive officer, said the program moved forward with the JSE despite the legal dispute. “That slowed our progress in getting started and slowed our early progress once we had begun,” Fick told lawmakers. “In order to get on contract, in order to start moving forward, we had to sign up to accept less than government purpose rights, but reserved the right to challenge that intellectual property assertion.” While Navair is developing the JSE at its headquarters at Patuxent River Naval Air Station, Maryland, the U.S. Air Force announced in January that it was building complementary JSE facilities at Edwards AFB, California, and Nellis AFB, Nevada. Plans call for breaking ground on both facilities next May. https://aviationweek.com/defense/dispute-not-stalling-f-35-testing-system-lockheed-martin-says

  • U.S. Air Force Faces Next-Generation Engine Funding Crisis

    24 septembre 2019 | International, Aérospatial

    U.S. Air Force Faces Next-Generation Engine Funding Crisis

    Adaptive engine technology faces its first major funding crisis as a 13-year-long, $4 billion investment by the U.S. Defense Department approaches a key milestone. Senate appropriators have threatened to reduce the fiscal 2020 budget for the Adaptive Engine Transition Program (AETP) by nearly one-third. The $270 million cut would be “pretty devastating,” says David Tweedie, general manager of GE's advanced combat engine program. https://aviationweek.com/defense/us-air-force-faces-next-generation-engine-funding-crisis

  • Elbit Systems Awarded a $300 Million Contract to Supply Armored Vehicle Systems to a European Customer

    20 février 2024 | International, Terrestre

    Elbit Systems Awarded a $300 Million Contract to Supply Armored Vehicle Systems to a European Customer

    The contract will be performed over a period of six years and includes custom design, production, lifecycle maintenance and complete in-country support.

Toutes les nouvelles