16 septembre 2020 | International, Naval

Navy Awards L3Harris $104 Million Contract for F/A-18 EW System

Seapower Staff

MELBOURNE, Fla.—The U.S. Navy has awarded L3Harris Technologies a $104 million follow-on contract to supply the next production lot of the electronic warfare (EW) system that protects F/A-18 Hornet and Super Hornet aircraft against electronic threats. The announcement was made on Sept. 10 in conjunction with vHook'20 being held virtually, September 10-12.

L3Harris will manufacture and deliver Integrated Defensive Electronic Countermeasures (IDECM) jammer systems for the F/A-18C/D/E/F variants, with deliveries under the new contract expected to be completed by May 2024. The L3Harris ALQ-214A(V)4/5 is the key Onboard Jammer for the IDECM program, protecting the aircraft from electronic threats, including sophisticated integrated air defense systems. The company has received more than $2 billion in awards to date from the Naval Air Systems Command for AN/ALQ-214 development and production.

“Our commitment to continually modernize F/A-18 EW systems has helped to keep naval aviators ahead of emerging threats and out of harm's way for more than two decades,” said Ed Zoiss, President, L3Harris Space and Airborne Systems. “This longterm collaboration with the Navy and continued development of advanced EW technology uniquely positions L3Harris to provide the jammer solution for the F/A-18 throughout the service-life of the aircraft.”

L3Harris has delivered EW solutions for a wide variety of airborne platforms for more than 60 years, including strategic bombers, tactical fighters and rotary aircraft.

L3Harris' Space and Airborne Systems segment provides space payloads, sensors and full-mission solutions; classified intelligence and cyber defense; avionics; and electronic warfare solutions.

https://seapowermagazine.org/navy-awards-l3harris-104-million-contract-for-f-a-18-ew-system/

Sur le même sujet

  • Leonardo airborne software-defined radio selected by Boeing to equip NATO’s AWACS fleet

    19 avril 2021 | International, Aérospatial

    Leonardo airborne software-defined radio selected by Boeing to equip NATO’s AWACS fleet

    Leonardo has been contracted by Boeing to provide its new software-defined radio, the ‘SWave® Airborne SDR SRT-800’ for NATO’s fleet of E-3A AWACS aircraft.

  • After COVID delay, high-stakes test of Army’s critical battle command system underway

    3 août 2020 | International, Terrestre

    After COVID delay, high-stakes test of Army’s critical battle command system underway

    By: Jen Judson WASHINGTON — A high-stakes test of the U.S. Army's battle command system expected to control air and missile defense shooters and sensors is underway following a delay due to the coronavirus pandemic, Kenn Todorov, Northrop Grumman's vice president for missile defense solutions, told Defense News in a recent interview. Northrop Grumman is the developer of the Integrated Air and Missile Defense Battle Command System, or IBCS. The system's development and its fielding is the Army's top air and missile defense modernization priority. IBCS has had a long and marred history due to struggles in previous tests as well as increasing requirements causing a plethora of challenging software changes. But recent successful tests over the past several years have resulted in a deeper confidence of the system, and the Army has been racing to move through a limited-user test, or LUT, at White Sands Missile Range, New Mexico, to reach a production decision. The test will decide the fate of the program. The program was supposed to reach initial operational capability last year, but those plans slipped in 2017 by four years following software problems in the system's first LUT in 2016. IBCS was originally meant to serve as the command-and-control system for the Army's future Integrated Air and Missile Defense system against regional ballistic missile threats, but now the service sees a much more expansive future for the technology, with plans to tie it to sensors and shooters capable of defeating complex threats like unmanned aircraft. According to Todorov, the Army and Northrop had to take a “COVID pause” to ensure the safety of all of the participants of the LUT before proceeding. Originally, the IBCS test was scheduled for earlier in the spring as COVID-19 was spreading quickly across the United States. Precautions are taken to ensure participants stay healthy, Todorov said, but he doesn't believe those measures will sacrifice any of the rigor within the test. The LUT will have a broader range of threats to counter than the original, from ballistic missiles, cruise missiles and air-breathing threats, and this test will include the integration of some joint air assets, Brig. Gen. Brian Gibson, the head of the Army's missile defense modernization effort, told Defense News last year. Northrop took the extra time from the pause caused by the pandemic to improve the system's readiness and develop policies and procedures to ensure employees take precautions to avoid the spread of the virus during the LUT. The test is expected to go through the month of August and include endurance runs as well as two major flight tests. In Northrop's second-quarter fiscal 2020 earnings call on July 30, CEO Kathy Warden said that “successful completion of this [engineering and manufacturing development] milestone will support IBCS production, deployment and fielding to execute the Army's [IAMD] modernization strategy,” adding that the program is on track to reach a production decision later this year. Warden also noted that success with the IBCS program and the Air Force's Advanced Battle Management System puts the company on a path to contribute heavily to an anticipated “next-generation” program called Joint All-Domain Command and Control. JADC2 is expected to provide an information architecture across all service and domains of warfare. Northrop's IBCS development efforts are seen as a springboard into work it could do to develop JADC2, Todorov said. He added that the IBCS system in particular has gone through “tremendous advances,” as it has adapted to maturing and changing threats. One of the reasons the system has been able to quickly evolve is due to its designation by Congress — among just a few Defense Department programs — to adopt an agile software-development process that allows the system to be frequently updated with software upgrades or patches, as opposed to big software drops that potentially happen only once a year. https://www.defensenews.com/land/2020/07/31/after-covid-delay-high-stakes-test-of-armys-critical-battle-command-system-underway/

  • Next-gen helo engines delivered to Sikorsky for Black Hawk integration

    30 juin 2024 | International, Terrestre

    Next-gen helo engines delivered to Sikorsky for Black Hawk integration

    Sikorsky has received two Improved Turbine Engine Program engines and will begin integrating them into UH-60 Black Hawks in the coming months.

Toutes les nouvelles