30 août 2019 | International, Aérospatial

How Poland plans to land an F-35 deal and ‘Fort Trump’

By: Jaroslaw Adamowski

This story has been updated to provide details about President Trump's decision to stay in the United States rather than make a planned visit to Poland in order to deal with a hurricane at home.

WARSAW, Poland — By 2026, the Polish Ministry of Defence plans to allocate about 185 billion zloty (U.S. $47 billion) toward acquiring new weapons and military equipment, with fifth-generation fighter jets a top priority.

Twenty years after Poland joined NATO, and despite the integration of some Western-made fighter jets and armored vehicles, the country still uses Soviet-designed gear dating back to the 1955 Warsaw Pact.

Poland and other allies in Eastern Europe are intensifying their military modernization efforts in response to Russian activity along NATO's eastern flank and its annexation of the Crimean Peninsula from Ukraine.

For 2019, the Polish MoD set a record budget, at more than 44 billion zloty, as required by the country's plan to raise defense spending to 2.1 percent of gross domestic product in 2020, and reach 2.5 percent in 2030. A significant share of the country's defense spending is to be directed at the acquisition of Western-made gear.

Warsaw's potential acquisition of fifth-gen fighters is one of the top modernization projects in the pipeline. In May, Polish Defense Minister Mariusz Blaszczak said the ministry sent a letter of request to the U.S. regarding Warsaw's plan to acquire 32 F-35A aircraft. The fighters are to replace the Air Force's outdated, Soviet-designed Sukhoi Su-22 and Mikoyan MiG-29 jets.

Negotiations for the jets are taking place as Warsaw is seeking a permanent U.S. military presence in Poland, dubbed “Fort Trump.” Warsaw offered to allocate at least $2 billion toward the project under which the U.S. would build a military base in the country. On June 12, Polish President Andrzej Duda met with U.S. President Donald Trump in Washington to discuss the initiative and ink a joint declaration on defense cooperation regarding U.S. force posture in Poland.

“The United States plans to enhance its current military presence of approximately 4,500 rotational U.S. military personnel in Poland. This enduring presence is expected to grow by about 1,000 additional U.S. military personnel in the near-term, and would focus on providing additional defense and deterrence capabilities in Poland,” the declaration read. “With the understanding that the increased U.S. force presence in Poland is made sustainable with Polish support, Poland plans to provide and sustain jointly determined infrastructure for the initial package of additional projects listed below, at no cost to the United States and taking into account the planned level of its use by U.S. forces.”

Trump was scheduled to visit Poland, but he canceled the trip to deal with a hurricane at home. The topics of a stronger U.S. troop presence in the country, as well as a potential F-35 sale, were expected to come up.

Trump is instead sending Vice President Mike Pence to observances Sunday marking the 80th anniversary of the start of World War II and for meetings with Polish leaders Monday expected to include new military and energy deals.

But F-35 acquisition negotiations will likely be separate from Fort Trump discussions, as the logistics and technical aspects of a troop deployment deal are nearing a conclusion, according to Tomasz Smura, the director of the research office at the Warsaw-based Casimir Pulaski Foundation.

“If Poland decides to buy the F-35, this will open an array of new possibilities before the Polish Air Force in the upcoming decades. This aircraft offers stealth and interoperability capacities that are currently not available to the Polish military,” Smura told Defense News. “However, there are also some critical voices on this potential purchase. Some analysts doubt whether we should introduce a second type of fighter instead of expanding Poland's fleet of 48 F-16s. This number of modern fighter jets doesn't match Poland's military needs and the country's size. Other analysts add that we're simply not ready to fully use the capacities offered by the F-35, and that further F-16s would suffice to match the current state of development of the air forces of our eastern neighbors.”

Despite the country's rising defense expenditure, some observers also doubt Poland's capacity to finance the F-35 acquisition alongside other ambitious military procurements, such as the Wisla air defense program.

In March 2018, Poland signed a letter of offer and acceptance with the U.S. government to purchase Raytheon's medium-range Patriot system. Under the deal, Warsaw is to acquire two Patriot Configuration 3+ batteries fitted with Northrop Grumman's Integrated Air and Missile Defense Battle Command System, as well as Lockheed Martin-made Patriot Advanced Capability-3 Missile Segment Enhancement missiles.

Deliveries are expected by the end of 2022, with plans to reach an initial operational capacity around the 2023-2024 time frame, according to data from the Polish MoD.

Warsaw's other procurement plans include short-range air defense systems, combat helicopters for the country's Air Force, new submarines for the Polish Navy, UAVs for various military branches, and the buildup of cyber warfare capacities using new hardware, the ministry said.

https://www.defensenews.com/digital-show-dailies/dsei/2019/08/29/how-poland-plans-to-land-an-f-35-deal-and-fort-trump/

Sur le même sujet

  • Contract Awards by US Department of Defense - May 19, 2020

    20 mai 2020 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité

    Contract Awards by US Department of Defense - May 19, 2020

    NAVY Viasat Inc., Carlsbad, California, is awarded a $998,828,164 maximum potential value, indefinite-delivery/indefinite-quantity contract for the production, retrofits, development and sustainment of the Multifunctional Information Distribution System (MIDS) Joint Tactical Radio Systems (JTRS) terminals. Currently, there are three variants of MIDS JTRS terminals: the Concurrent Multi-Netting-4, the Tactical Targeting Network Technology and the F-22 variant. Work will be performed in Carlsbad, California, and these terminals will continue to be procured, sustained and updated for future growth, including JTRS advanced networking waveforms such as: multifunction advanced data link, intra-flight data link and other advanced networking waveforms. The MIDS JTRS terminal is a line-of-sight radio system for collecting and transmitting broadband, jam-resistant, secure data and voice across a variety of air, sea and ground platforms. Work is expected to be complete by May 2025. Funds in the amount of $48,280,914 will be placed on contract and obligated on the first delivery order concurrent with contract award, which will meet the minimum order requirement. Fiscal 2020 aircraft procurement (Navy) funds in the amount of $8,223,208; and other procurement (Navy) funds in the amount of $1,532,559 will be obligated at time of award and will not expire at the end of the current fiscal year. Fiscal 2020 aircraft procurement (Air Force) funds in the amount of $12,135,592; other procurement (Air Force) funds in the amount of $1,645,504; and research development test and evaluation (Air Force) funds in the amount of $205,688 will be obligated at time of award and will not expire at the end of the current fiscal year. Fiscal 2020 defense-wide procurement in the amount of $1,234,128; and defense National Guard and reserve equipment in the amount of $2,673,944 will be obligated at time of award and will not expire at the end of the current fiscal year. Non-appropriated funds for Foreign Military Sales (FMS) in the amount of $15,015,224; and foreign cooperative programs in the amount of $617,064 will be obligated at time of award and will not expire at the end of the current fiscal year. Fiscal 2018 aircraft procurement (Air Force) in the amount of $3,702,384; and other procurement (Navy) in the amount of $1,295,619 will be obligated at time of award and will expire at the end of the current fiscal year. This contract combines purchases for the Navy, Air Force and MIDS Program Office, as well as purchases for NATO and all NATO nations under the FMS program. This contract was competitively procured, and two proposals were received. The Naval Information Warfare System Command, San Diego, California, is the contracting authority and awarded the contract on behalf of the MIDS Program Office (PMA/PMW-101) (N00039-20-D-0058). Data Link Solutions LLC, comprised of BAE, Wayne, New Jersey; and Collins Aerospace, Cedar Rapids, Iowa, is awarded a $998,828,164 maximum potential value, indefinite-delivery/indefinite-quantity (IDIQ) contract for the production, retrofits, development and sustainment of the Multifunctional Information Distribution System (MIDS) Joint Tactical Radio Systems (JTRS) terminals. Work will be performed in Cedar Rapids, Iowa (50%); and Wayne, New Jersey (50%). Currently, there are three variants of MIDS JTRS terminals: the Concurrent Multi-Netting-4, the Tactical Targeting Network Technology and the F-22 variant. These terminals will continue to be procured, sustained and updated for future growth, including JTRS advanced networking waveforms such as: multifunction advanced data link, intra-flight data link and other advanced networking waveforms. The MIDS JTRS terminal is a line-of-sight radio system for collecting and transmitting broadband, jam-resistant, secure data and voice across a variety of air, sea and ground platforms. The ordering period for this IDIQ contract is through May 2025. Funds in the amount of $64,137,404 will be placed on contract and obligated on the first delivery order concurrent with contract award, which will meet the minimum order requirement. Fiscal 2020 aircraft procurement (Navy) funds in the amount of $10,970,335; other procurement (Navy) funds in the amount of $1,802,447; and ship construction procurement (Navy) funds in the amount of $195,965 will be obligated at time of award and will not expire at the end of the current fiscal year. Fiscal 2020 aircraft procurement (Air Force) funds in the amount of $16,461,060; other procurement (Air Force) funds in the amount of $1,959,650; and research development, test and evaluation (Air Force) funds in the amount of $1,175,790 will be obligated at time of award and will not expire at the end of the current fiscal year. Fiscal 2020 defense-wide procurement in the amount of $1,567,720; and defense National Guard and reserve equipment in the amount of $3,331,405 will be obligated at time of award and will not expire at the end of the current fiscal year. Non-appropriated funding for Foreign Military Sales (FMS) in the amount of $20,598,117; and foreign cooperative programs in the amount of $979,825 will be obligated at time of award and will not expire at the end of the current fiscal year. Fiscal 2018 aircraft procurement (Air Force) in the amount of $5,095,090 will be obligated at time of award and will expire at the end of the current fiscal year. This contract combines purchases for the Navy, Air Force and MIDS Program Office, as well as purchases for NATO and all NATO nations under the FMS program. This contract was competitively procured, and two proposals were received. The Naval Information Warfare System Command, San Diego, California, is the contracting authority and awarded the contract on behalf of the MIDS Program Office (PMA/PMW-101) (N00039-20-D-0057). Intercontinental Construction Contracting Inc.,* Passaic, New Jersey (N40080-20-D-0011); FBGC JV LLC,* Hampton, Virginia (N40080-20-D-0012); Pontiac Drywall Systems Inc.,* Pontiac, Michigan (N40080-20-D-0013); Maclean-Ocean JV LLC,* Bethesda, Maryland (N40080-20-D-0014); RAND Enterprises Inc.,* Newport News, Virginia (N40080-20-D-0015); and Aimcon Design Build LLC,* Harvey, Louisiana (N40080-20-D-0016), are awarded $99,000,000 for an indefinite-delivery/indefinite-quantity, multiple award design-build/design-bid build construction contract for construction projects located primarily within the Naval Facilities Engineering Command (NAVFAC) Washington area of responsibility (AOR). All work on this contract will be performed primarily within the NAVFAC Washington AOR to include District of Columbia (40%); Virginia (40%); and Maryland (20%). Intercontinental Construction Contracting Inc. is awarded initial task order at $169,821 for the construction of seven above-ground storage tanks and two pump houses at Chesapeake Beach Detachment, Maryland. The work to be performed provides repairs, new construction and alterations to shore facilities and utilities. Additionally, work may also include but are not limited to, engaging in installing and serving mechanical, electrical, plumbing, heating, air-conditioning, building's equipment and other specialized trades. Work for this task order is expected to be complete by June 2021. The term of the contract is not to exceed 24 months, with an expected completion date of May 2022. Fiscal 2020 Navy working capital funds (NWCF); and fiscal 2020 supervision, inspection and overhead contract funds in the amount of $194,821 are obligated on this award and will expire at the end of the current fiscal year. The maximum dollar value including the base period and one option year for all six contracts combined is $99,000,000. Future task orders will be primarily funded by military construction (Navy); operations and maintenance (Navy); and NWCF. This contract was competitively procured via the Beta Sam website, and 23 proposals were received. These six contractors may compete for task orders under the terms and conditions of the awarded contract. The Naval Facilities Engineering Command Washington, Washington, D.C., is the contracting activity. Applied Systems Engineering Inc., Niceville, Florida, is awarded a $10,600,000 modification on an indefinite-delivery/indefinite-quantity delivery order N001781-70-D-2053 for additional quantities of Advanced Tactical Navigation units as well as various upgrades, repairs and associated support. Work will be performed in Niceville, Florida, and is expected to be complete by April 2022. This modification raises the contract ceiling to $22,259,073. This modification is being awarded on a sole-source basis in accordance with Federal Acquisition Regulation 6.302-2, Unusual and Compelling Urgency (see 10 U.S. Code 2304(c)(2)). No funds are being obligated at the time of award, and will be obligated on individual orders as they are issued. The Naval Surface Warfare Center, Dahlgren Division, Dahlgren, Virginia, is the contracting activity. W. F. Magann Corp., Portsmouth, Virginia, is awarded a $10,234,262 firm-fixed-price modification for replacement of the Dry Dock 4 north side duct bank at the Norfolk Naval Shipyard, Virginia. Work will be performed in Portsmouth, Virginia, and includes, but is not limited to, demolition of the existing terracotta duct banks and installation of structural, concrete encased duct banks for the electrical systems, shore power, industrial power, capstan power and telecommunications systems. Work is expected to be complete by July 2022. After award of this modification, the cumulative contract value will be $174,551,064. Fiscal 2020 operations and maintenance (Navy) contract funds in the amount of $10,234,262 are obligated on this award and will expire at the end of the current fiscal year. The Naval Facilities Engineering Command Mid-Atlantic, Norfolk, Virginia, is the contracting activity (N40085-19-C-9014). AIR FORCE Ventech Inc., Largo, Maryland, has been awarded a $99,000,000 firm-fixed-price, indefinite-delivery/indefinite-quantity contract for performance of the Base Level Software Support V contract. This contract provides for purchasing of commercial software, software maintenance and bundled maintenance, filing purchases and license information database operations and maintenance, report generation and general support to address software, documentation and licensing issues. Work will be performed at Eglin Air Force Base, Florida, and is expected to be completed May 30, 2030. The period of performance for this services contract is for a five year base period with one five year option. This award is the result of competitive acquisition and 18 offers were received. Fiscal 2020 research, development, test and evaluation funds in the amount of $106,723 will be obligated at the time of award. Air Force Testing Center, Eglin AFB, Florida, is the contracting activity (FA2486-20-D-0009). Survice Engineering Co. LLC, Belcamp, Maryland, has been awarded a not-to-exceed $89,489,901 indefinite-delivery/indefinite-quantity contract for the Defense Technical Information Center (DTIC). This contract provides for the acquisition, storage, retrieval, synthesis, analysis and dissemination of 22 technical focus areas and scientific technical information for the Department of Defense Information Analysis Center mission. Work will be performed at Fort Belvoir, Virginia, and is expected to be completed Dec. 31, 2026. This contract is the result of a competitive acquisition and two offers were received. Fiscal 2020 research, development, test and evaluation funds in the amount of $3,600 will be obligated at the time of award. The Air Force Installation Contracting Center, Offutt Air Force Base, Nebraska, is the contracting activity (FA8075-20-D-0001). Sea Box Inc., East Riverton, New Jersey, has been awarded a $77,454,898 requirements order for basic expeditionary airfield resources expandable bicon shelter hygiene systems for the Support Equipment and Vehicles division at Robins Air Force Base. The order provides for the production of 43 initial quantities and best estimated quantities (BEQ) of five each under the basic period, BEQ of 26 for Option Period One, BEQ of 44 each for Option Period Two, BEQ of 30 each for Option Period Three, and BEQ of 30 each for Option Period Four. Work will be performed in East Riverton, New Jersey, and is expected to be completed May 18, 2024. This award is the result of a sole-source acquisition. Fiscal 2019 other procurement funds in the amount of $15,422,303; and fiscal 2020 other procurement funds in the amount of $2,500,914 are being obligated at the time of award. Air Force Life Cycle Management Center, Robins Air Force Base, Georgia, is the contracting activity (FA8534-20-F-0026). ManTech SRS Technologies Inc., Herndon, Virginia, has been awarded a $20,916,894 cost-plus-fixed-fee and firm-fixed-price modification (P00056) to contract FA8811-10-C-0002 for systems engineering and integration services. Work will be performed at Los Angeles Air Force Base, California; Vandenberg AFB, California; and Cape Canaveral Air Force Station, Florida. Work is expected to be completed Sept. 22, 2020. Fiscal 2020 procurement funds in the amount of $17,673,379; fiscal 2020 operations and maintenance funds in the amount of $1,503,797; and fiscal 2020 research development test and evaluation funds in the amount of $729,723 are being obligated at the time of award. Total cumulative face value of the contract modification and option is $20,916,894. Space and Missile Systems Center, Los Angeles Air Force Base, California, is the contracting activity. ARMY Vigil America Inc., Deland, Florida, was awarded a $49,000,000 firm-fixed-price contract for the Electronic Automatic Activation Device. Bids were solicited via the internet with three received. Work locations and funding will be determined with each order, with an estimated completion date of May 14, 2027. U.S. Army Contracting Command, Aberdeen Proving Ground, Maryland, is the contracting activity (W911QY-20-D-0015). WASHINGTON HEADQUARTERS SERVICES UPDATE: The contract announced yesterday, May 18, 2020, to Chenega Healthcare Services LLC, San Antonio, Texas (HQ0034-20-D-0008), to provide COVID-19 contact tracing for Pentagon support services, was actually awarded today. *Small business https://www.defense.gov/Newsroom/Contracts/Contract/Article/2192036/source/GovDelivery/

  • US Army picks 5 teams to design new attack recon helicopter

    26 avril 2019 | International, Aérospatial

    US Army picks 5 teams to design new attack recon helicopter

    By: Jen Judson WASHINGTON — AVX Aircraft Co. partnered with L-3 Communications Integrated Systems, Bell Helicopter, Boeing, Karem Aircraft and Lockheed Martin-owned Sikorsky have won awards to design a new Future Attack Reconnaissance Aircraft (FARA) for the U.S. Army over the next year, the service announced April 23. Only two teams will move forward, at the end of the design phase, to build flyable prototypes of the future helicopter in a head-to-head competition. The Army laid out a handful of mandatory requirements that the vendors had to meet and also a list of desired requirements for initial designs, Col. Craig Alia, the Future Vertical Lift Cross Functional Team chief of staff, told a select group of reporters just ahead of the contract awards. The service also looked at the vendors' execution plans and evaluated timing as well as funding profile requirements. “The ones that were selected were clearly meeting the mandatory requirements and were in the acceptable risk level of the execution plan and the desired requirements," Dan Bailey, who is the FARA competitive prototype program manager, added. The prototype program falls under the purview of the Army Combat Capabilities Development Command Aviation and Missile Center's Aviation Development Directorate. AVX and L3 unveiled its design for the FARA competition at the Army Aviation Association of America's annual summit in Nashville, Tennessee, earlier this month. The design uses AVX's compound coaxial and ducted fans technology. The companies said its single-engine design meets 100 percent of the Army's mandatory requirements and 70 percent of its desired attributes. The CEO of Textron, Bell's parent company, said during a recent earnings call, that its FARA design will be based on its 525 technology rather than its tiltrotor technology. Bell has built and flown a tiltrotor prototype — the V-280 Valor — for the Army's Future Vertical Lift program. Karem has been working to develop technology under a small contract to help build requirements for FVL aircraft focused on a medium-lift helicopter. Sikorsky's offering will be based off of its X2 coaxial technology seen in its S-97 Raider and the Sikorsky-Boeing developed SB-1 Defiant, which are now both flying. “This is the culmination of years of investment in the X2 Technology Demonstrator and the S-97 RAIDER aircraft that have proven the advanced technology and shown its ability to change the future battlefield,” Tim Malia, Sikorsky's director of Future Vertical Lift Light, told Defense News in an emailed statement shortly after the announcement. “We continue to fly the S-97 RAIDER to inform the design for FARA, which provides significant risk reduction to the program schedule and technical objectives. We are eager to continue to support the US Army, and we are excited that the Sikorsky FARA X2 will be ready for this critical mission," he said. A total of eight teams submitted data and potential designs for FARA, but upon evaluation, three of those did not meet mandatory requirements, according to Bailey. It is not publicly stated who the losing teams were, but MD Helicopters had previously protested the Army's decision to not enter into a first phase agreement with the company to develop a FARA prototype, arguing to the Government Accountability Office (GAO) that the Army “unreasonably” evaluated its proposal and failed to promote small business participation. The GAO denied the protest earlier this month on the grounds it did not have authority to review protests of contracting mechanisms like Other Transaction Authorities (OTA) which the Army used in this case. The awards were made two months ahead of an already ambitious schedule to get FARA prototypes flying by 2023. A production decision could happen in 2028, but the service is looking at any way possible to speed up that timeline. The Army has to move quickly, Alia said. Echoing his boss, Brig. Gen. Wally Rugen, the FVL CFT director, he said the Army is “at an inflection point. We can't afford not to modernize. We know the current fleet is fantastic, but we can't indefinitely continue to incrementally improve 1970s to 1980s technology.” FARA is intended to fill a critical capability gap currently being filled by AH-64E Apache attack helicopters teamed with Shadow unmanned aircraft following the retirement of the OH-58D Kiowa Warrior helicopters. The service has tried and failed three times to fill the gap with an aircraft. The Army is also planning to procure another helicopter to fill the long-range assault mission, replacing some UH-60 Black Hawk helicopters in the fleet, simultaneously. With the advent of the new Army Futures Command — that is focused on six major modernization priorities of which FVL is third — the service is moving faster on prototyping capability to ultimately procure major weapon systems at a somewhat unprecedented speed. Through the AFC and the use of contracting mechanisms like OTAs, the Army has found a way to compress parts of the acquisition process that previously took three to five years into periods of time often amounting to less than a year. “What is exciting about the new process the Army has put in place,” Bailey said, “in basically a year's period of time, we've gone through concept, through an approved set of requirements, to developing an innovative approach to contracting, to building industry partnerships to have industry propose to us a plan and a solution.” And the Army rigorously evaluated those FARA proposals, Bailey said, all within that year. The teams have until January or February next year to provide design plans and an approach to executing the build of the prototypes followed by potential larger-scale manufacturing, Bailey said. The second phase of the program will be to build prototypes, and “only two will make it into phase 2 and they all know that now,” Bailey added. According to Rugen, when the request for proposals was released, the Army did not want to get locked into keeping inflexible requirements, but the request did state that the aircraft should have a maximum 40-foot rotor diameter. The Army also asked for the aircraft to be able to accept some government furnished equipment including an engine, a gun and a rocket launcher, Alia said. When it comes to some of the desirable attributes for a new aircraft, the Army is considering speed, range and payload possibilities, Alia said, but the service “wanted to encourage innovation by industry to come to us with their ideas and unique ways of meeting both mandatory and desirable characteristics and that is where we got some great feedback from industry and some innovative designs.” https://www.defensenews.com/digital-show-dailies/aaaa/2019/04/23/us-army-picks-5-teams-to-design-new-us-army-attack-recon-helicopter/

  • USS New York, USS Oak Hill conduct live-fire missile training

    6 août 2019 | International, Naval

    USS New York, USS Oak Hill conduct live-fire missile training

    By Mass Communication Specialist 2nd Class Lyle Wilkie, USS New York LPD 21 Public Affairs ATLANTIC OCEAN -- The amphibious transport dock ship USS New York (LPD 21) completed a live-fire exercise in which the ship fired missiles at a drone using the ship's self-defense Rolling Airframe Missile (RAM) system Saturday, Aug. 3 (NNS) -- The amphibious transport dock ship USS New York (LPD 21) completed a live-fire exercise in which the ship fired missiles at a drone using the ship's self-defense Rolling Airframe Missile (RAM) system Saturday, Aug. 3. The live-fire exercise is in preparation for the New York's upcoming deployment with the Bataan Amphibious Ready Group. The Harpers Ferry-class dock landing ship USS Oak Hill (LSD 51), also part of the amphibious ready group, conducted a live-fire exercise Saturday as well. “We are doing this exercise to verify full operation of our kill chain for our RAM system,” said USS New York Fire Controlman Chief Christopher Campbell. “The weekly overall combat system operability tests and RAM's daily system tests assess every part of the kill chain except the actual launch of the missile. This is our opportunity to ensure that the missile will launch prior to deployment.” In order to prepare for an exercise of this magnitude it takes a great deal of preparation. “Preparation for this exercise started a month or longer before we even loaded the missiles,” said Fire Controlman 2nd Class Austin Jones. “We had to ensure each missile cell received the proper signals to fire missiles and make sure the launcher was in overall good condition before receiving and firing missiles. All the fire controlmen have accomplished more than 150 man hours of maintenance in preparation for this shoot. The exercise was a way to show how effective training in the combat systems department has been and how prepared the New York is to use the RAM system on board.” The fire controlman aboard was not the only one involved in this exercise. “All combat watch standers, bridge watch teams and many other people were involved in this exercise,” said Jones. “Each person has a specific role from safeties to launching the missile to coordinating procedures in case of a dud, or misfire.” This exercise is the last event for the Surface Warfare Advanced Tactical Training (SWATT) exercise where the New York, alongside the Oak Hill and flagship Wasp-class amphibious assault ship USS Bataan (LHD 5), have been tested in many avenues of war fighting. “This is a culminating event where watch standers and systems can be rigorously tested to prove their capability and effectiveness while also utilizing state of the art data extraction systems to continue our pursuit for perfection,” said Lt. j.g. Joshua Sexton, Fire Control Officer aboard New York. “This is proof of not only capability and effectiveness but also confidence in both the system and, most importantly, the watch standers' ability to stay in the fight.” Warships assigned to the Bataan Amphibious Ready Group, including New York, are participating in the SWATT, in the Atlantic Ocean, to maintain readiness, proficiency, and lethality. https://www.navy.mil/submit/display.asp?story_id=110462

Toutes les nouvelles