16 avril 2020 | International, Naval

Hensel Phelps Construction nabs $54.3M for undersea training center

ByChristen McCurdy

April 15 (UPI) -- The Navy has awarded Hensel Phelps Construction a $54.3 million contract for design and construction of an undersea operational facility, the Pentagon said Wednesday.

According to the contract announcement, the training center will be constructed in Oahu, Hawaii, and will support a variety of functions, including operator and undersea vehicle training, applied instruction and laboratories and computer laboratories.

The contract also includes a line item for furniture, repairs and equipment.

The center will also include diver support spaces, administrative spaces, maintenance and repair spaces and operator's gear storage lockers and maintenance and support spaces.

Construction is expected to be complete by April 2022.

https://www.upi.com/Defense-News/2020/04/15/Hensel-Phelps-Construction-nabs-543M-for-undersea-training-center/4831586995292

Sur le même sujet

  • A New NATO Buyer For JLTV; More Buyers On The Way?

    7 octobre 2019 | International, Terrestre

    A New NATO Buyer For JLTV; More Buyers On The Way?

    The sale to Montenegro might be small, but the US push into the Balkans will not make Moscow happy. By PAUL MCLEARY WASHINGTON: In a sign the floodgates may be opening for allies to buy the Army's newest tactical vehicle, the US appears to be finalizing a $36 million agreement with Montenegro to sell them dozens of brand-new Joint Light Tactical Vehicles. The tipoff came this morning when Secretary of State Mike Pompeo, who is visiting the country, said the US “offered an agreement to Montenegro for the largest sale of military equipment in the history between our two nations. The United States looks forward to delivering $36 million worth of light tactical vehicles to our NATO ally once this agreement is finalized.” A defense official confirmed the deal is for 67 Oshkosh-made JLTVs. If the deal goes through, Montenegro would become the fourth NATO ally to express interest or actually buy into the program, though so far Lithuania is the only country to receive US approval after the State Department signed off on a $170 million deal with the Baltic nation for 500 JLTVs in August. Mike Ivy, Oshkosh's senior VP for international programs, wouldn't comment on the Montenegro deal, but told me via email the “JLTV was intended from the beginning to be an international program,” pointing out the common systems on the vehicle make it easier for allies to work together in the field. A vastly larger sale is in the works with the UK, which is considering buying 2,747 JLTVs as part of its Multi Role Vehicle-Protected program. British Army officials acknowledged for the first time earlier this month that Oshkosh has been working on a UK variant. In October 2018, Slovenia also signed a Letter of Offer and Acceptance for 38 JLTVs, though no deal has been finalized. Montenegro joined NATO in 2017, and is a critical part of the Balkan region's slow turn away from their Russian-dominated past, which Washington and NATO have taken pains to nurture. “It is of strategic importance for Montenegro to have US and EU presence in the Balkans so there would be no space for those countries who do not share the same values,” Montenegro Prime Minister Dusko Markovic said alongside Pompeo Friday. Like so many DoD programs, the JLTV has had an exceptionally long and checkered past. The effort kicked off in 2006, eventually enduring a series of fits and starts before being forced to undergo a full requirements overhaul in 2011 after the Army realized the design would need to change to meet demands beyond those of counterinsurgency warfare. In 2015, Oshkosh was awarded a $6.7 billion contract for the initial 16,901 vehicles. In June the Army declared the JLTV was finally ready for full production, clearing the way for the sale of the truck to allies. Although the program spent 13 years churning through the development cycle, the JLTV has recently come under fire from the Army for being built for the wars in Iraq and Afghanistan, and not the potential conflicts of tomorrow against peer adversaries like China and Russia. In April, then-Army Secretary and now Defense Secretary Mark Esper said the JLTV, like the Chinook helicopter, was “designed for a different conflict,” but could still play a role on the battlefield. That shot came around the same time that the service slashed $800 million from its planned JLTV purchases, which translates to at least 1,500 vehicles over the next five years. The cut is only a dent in the massive program's armor, however. The Army has not backed off plans to acquire almost 50,000 JLTVs over the life of the program, which will run into the 2030s. The Marine Corps is also slated to buy about 9,100 JLTVs in the coming years. The Army and Marine Corps are planning to buy four versions of the truck, a general purpose model, a turreted gun truck, a TOW anti-tank missile launcher and a two-door utility variant, basically a militarized pickup truck. https://breakingdefense.com/2019/10/a-new-nato-buyer-for-jltv-more-buyers-on-the-way

  • Army wades back into effort to replace Bradley vehicle

    10 février 2020 | International, Terrestre

    Army wades back into effort to replace Bradley vehicle

    By: Jen Judson WASHINGTON — The Army is wading back into an effort to replace the Bradley Infantry Fighting Vehicle with the release of a market survey on Feb. 7, tapping industry for ideas on what a future Optionally Manned Fighting Vehicle (OMFV) might look like. After receiving only one bid in its previous attempt to develop and procure the OMFV and subsequently deciding to cancel the existing solicitation last month, the Army has a new plan to move forward that seeks to avoid some of the pitfalls encountered during its first try. The market survey itself asks companies to weigh in on what affected their decisions to participate, or not, in the previous OMFV competitive effort and how the Army might better engage with industry this time around. Instead of a laundry list of requirements that when paired together became unachievable — especially when delivered over an ambitious fielding goal of 2026 — the Army will be giving industry roughly nine characteristics, each of which will be laid out simply enough to take up just a page-and-a-half including a signature block, Army Futures Command Commander Gen. Mike Murray told a group of reporters at the Pentagon shortly before the release of the survey. The Army had previously laid out requirements such as the need to transport two vehicles in a C-17, for example, which turned out to be a difficult ask to industry within the timeline the Army was pushing. While the list of characteristics did not post with the market survey, Murray said the vehicle will have to protect soldiers, keep pace in a combined arms formation, be able to upgrade over time through open architecture, and be capable of growth without significant weight increases. It also must be lethal, and able to traverse bridges and main supply routes. Additionally, the vehicle should be transportable by rail, air or sea, and crew members have to fit in the back. An on-board training system would also be nice, Murray said, adding that the Army wants to take a look at different options for power and energy sources. Murray also stressed the document outlining the characteristics would change as the Army learned more down the road. Not required of industry will be physical bid samples as it previously requested. Only General Dynamics Land Systems was able to deliver a bid sample, but it did not meet all the requirements the service had laid out. Defense News first broke the news that a Raytheon-Rheinmetall team was unable to get its Lynx combat vehicle to the United States from Germany in time and was subsequently disqualified and that BAE Systems, the incumbent, wouldn't participate in the competition either. The ability to see what was possible from a technology and integration standpoint “was important to us and so I wouldn't say it was a mistake," Murray said of the decision to require a bid. “Did it lead to some problems we had? Maybe. But I would not characterize that as a mistake.” The Army, instead, will take a more measured approach, holding conversations with industry, requesting white papers and then choosing five prime contractor teams to design rough digital prototypes, according to the Army's acquisition chief, Dr. Bruce Jette. The Army plans to involve “soldier touch points” at every stage of the process and give soldiers a chance to heavily evaluate designs along the way, he said. Murray took pains to emphasize that soldiers would be involved in the design process, calling it “soldier-centered design,” which takes a page from other modernization efforts like the Integrated Visual Augmentation System (IVAS) program. And before ever bending any metal, the service will downselect to a group of three contractors that will provide more refined and detailed digital prototypes akin to a critical design review stage. Then the Army will choose two prime contractors to build prototypes that will be heavily tested and demonstrated in order to potentially choose a winner that would move into a manufacturing contract, Jette explained. While the timeline was ambitious in the previous effort and Army modernization goals dictated that it had to stick to schedule over all else, a schedule or even a benchmark for the first unit equipped isn't defined this time around. Murray said the Army will look to early conversations with industry to inform possible schedules based on what is feasible rather than setting an “arbitrary date” right up front. The Army is also planning to look at up to five vendors for major subsystems or components, Jette said. He also noted the service wants to “encourage companies to bring forth technology” that may not want to be a prime contractor, but have capabilities like automated loaders and fire control systems as well as in-cab wireless connectivity. “The barrier to entry is much lower for their investment,” he said. “By going to a digital design, as most do anyway, it makes it much easier for a company to participate as an [Original Equipment Manufacturer] OEM.” https://www.defensenews.com/land/2020/02/07/army-wades-back-into-effort-to-replace-bradley-vehicle/

  • Pentagon seeks commercial tech for hypersonic test vehicle

    2 septembre 2022 | International, Aérospatial

    Pentagon seeks commercial tech for hypersonic test vehicle

    DIU is seeking proposals from commercial industry for a hypersonic test aircraft to help alleviate the strain on DoD testing infrastracture.

Toutes les nouvelles