28 juillet 2023 | International, Aérospatial

Hanwha Aerospace Selected as Preferred Bidder for Land 400 Phase 3 by Australian Army

This program includes 129 vehicles across two iants and will be ivered under an accelerated schedule, in alignment with the Australian Army's Defence Strategic Review.

https://www.epicos.com/article/769429/hanwha-aerospace-selected-preferred-bidder-land-400-phase-3-australian-army

Sur le même sujet

  • Germany calls for Rheinmetall to deliver Puma IFV ammunition - Army Technology

    22 janvier 2024 | International, Aérospatial

    Germany calls for Rheinmetall to deliver Puma IFV ammunition - Army Technology

    As part of an existing framework contract, the German Bundeswehr has requested Rheinmetall to produce and supply Puma IFV rounds.

  • To keep up with rivals, DoD nominee will weigh consolidation vs. innovation

    4 février 2021 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité

    To keep up with rivals, DoD nominee will weigh consolidation vs. innovation

    By: Joe Gould WASHINGTON ― President Joe Biden's nominee for deputy defense secretary, Kathleen Hicks, said she is “concerned” about consolidation in the defense industrial base, and that competition is needed to maintain an edge over China and Russia. Hicks, whose office would review deals that involve national security issues if she is confirmed by the Senate, told lawmakers Tuesday that she would work with them to ensure a healthy defense industrial base. The comments came amid market expectations that defense deal-making could take off in 2021. “Extreme consolidation does create challenges for innovation,” Hicks told the Senate Armed Services Committee. “We need to have a lot of different good ideas out there. That's our competitive advantage over authoritarian states like China, and Russia. And so if we move all competition out, obviously, that's a challenge for the taxpayer. But it's also a challenge in terms of the innovation piece.” As the space sector and technological developments drive growth in the aerospace and defense sector and the pandemic weakens commercial aviation firms, companies are “likely to pursue opportunities for consolidation,” the consulting firm Deloitte said in a recent report. Firms could seek new merger and acquisition opportunities, the report said, to “capture more value, drive cost-competitiveness, or acquire targeted niche capabilities and emerging technologies” such as “advanced air mobility, hypersonics, electric propulsion, and hydrogen-powered aircraft.” Recent years have seen a number of major deals, including the combination of Harris and L3 Technologies, United Technologies Corp. and Raytheon; BAE Systems and Collins Aerospace, and General Dynamics and CSRA. Lockheed Martin's $4.4 billion acquisition of Aerojet Rocketdyne, announced in December, has yet to clear regulators. The Federal Trade Commission and the Justice Department also review mergers and acquisition activity in the defense sector. At Tuesday's hearing, Connecticut Democratic Sen. Richard Blumenthal, whose state hosts General Dynamics Electric Boat, told Hicks a drop in the number of submarine suppliers from 17,000 to 5,000 over recent decades suggested broader problems for the defense industrial base, problems that he said were, “extremely alarming to me.” Blumenthal indicated Hicks had committed prior to the hearing to aid small suppliers struggling with the pandemic's economic fallout and to develop new small and medium suppliers. (This was one focus of DoD's acquisition and sustainment office under the previous administration.) “I'm hoping you will focus on the supply chain that is vitally important to suppliers like Electric Boat or Raytheon or any of our major sources of supply,” said Blumenthal, who has served as the top Democrat on SASC's Seapower Subcommittee. A broader theme for the hearing was how Hicks, whose job involves supervising the defense budget, would invest in forward-leaning technologies under a flat budget and divest from existing weapons platforms. Meanwhile, lawmakers grilled Hicks about whether she supported spending on nuclear modernization, shipbuilding and other programs with connections to lawmakers' home states. Acknowledging the political and budget tensions, Hicks said she wants to link future budgetary decisions with concepts for operations, to buy “capabilities that actually line up to theories of victory for how we are trying to pace challenges from China and Russia.” Other lawmakers told Hicks they wanted an easier paths for smaller, cutting edge firms from outside the Beltway to do business with the Pentagon and for them to scale production of their products, beyond the experimentation phase. “We've had testimony before this committee that many smaller companies, particularly in Silicon Valley, and in the technology field generally have given up on the Pentagon, it's too complicated is too lengthy is too expensive, even to fill out the forms,” said Sen. Angus King, I-Maine. For her part, Hicks said Tuesday she would “increase the speed and scale of innovation in our force,” and she would work to understand how alternative acquisitions methods are servings smaller non-traditional suppliers. She affirmed that those firms cannot survive on research and development funding alone. “I do think a sustain level of [research and development] investment is vital, but we actually have to field capabilities, and that's a place where DoD has really struggled,” she said, adding that exercises and experiments help demonstrate the value of new technologies. “When we can demonstrate value, then we're in a much better position to have a dialogue with Congress and with industry about where that where those capabilities can take us.” https://www.defensenews.com/congress/2021/02/02/to-keep-up-with-rivals-dod-nominee-will-weigh-consolidation-vs-innovation/

  • Defence Watch: New dates set for budget watchdog's reports on major naval projects

    27 octobre 2020 | International, Naval

    Defence Watch: New dates set for budget watchdog's reports on major naval projects

    David Pugliese, Two reports by the parliamentary budget officer looking into the costs of major Canadian naval equipment projects have been delayed. The Commons Standing Committee on Government Operations and Estimates had unanimously passed a motion in June to request the Office of the Parliamentary Budget Officer undertake a costing analysis of the Royal Canadian Navy's new joint support ships as well as the leasing of the Asterix supply ship from a private firm. The PBO study was to also look at the cost of building the joint support ships in Canada at Seaspan shipyard in Vancouver. The committee asked that the PBO report be provided by Oct. 15. Another motion from the committee, passed later in June, asked the PBO to examine the $60 billion price tag of Canada's proposed new fleet of warships – the Canadian Surface Combatant or CSC. Parliamentary Budget Officer Yves Giroux was tasked to investigate the cost of the CSC as well as examine the cost of two other types of warships: the FREMM and the Type 31. That study was supposed to be presented to the committee by Oct. 22. But those original motions from the committee expired when Parliament was prorogued. So new motions have to be provided to the PBO. The Commons committee passed a new motion on Oct. 19 on the Asterix and Joint Support Ship analysis. That analysis is to be delivered by Nov. 30, PBO spokeswoman Sloane Mask told this newspaper. A date for the analysis to be made public has not yet been determined. “Currently, we are also in the process of confirming the revised timelines for the CSC report,” she added.There is particular interest in the defence community about what the PBO determines is the current price-tag of the Canadian Surface Combatant project. Last year the Liberal government signed an initial deal on CSC that is expected to lead to the eventual construction of 15 warships in the largest single government purchase in Canadian history. Lockheed Martin offered Canada the Type 26 warship designed by BAE in the United Kingdom. Irving is the prime contractor and the vessels will be built at its east coast shipyard. Construction of the first ship isn't expected to begin until the early 2020s. But the Canadian Surface Combatant program has already faced rising costs. In 2008, the then-Conservative government estimated the project would cost roughly $26 billion. But in 2015, Vice-Admiral Mark Norman, then commander of the navy, voiced concern that taxpayers may not have been given all the information about the program, publicly predicting the cost for the warships alone would approach $30 billion. The overall project is currently estimated to cost around $60 billion. “Approximately one-half of the CSC build cost is comprised of labour in the (Irving) Halifax yard and materials,” according to federal government documents obtained by this newspaper through the Access to Information law. But some members of parliament and industry representatives have privately questioned whether the CSC price-tag is too high. There have been suggestions that Canada could dump the Type 26 design and go for a cheaper alternative since the CSC project is still in early stages and costs to withdraw could be covered by savings from a less expensive ship. Canada had already been pitched on alternatives. In December 2017, the French and Italian governments proposed a plan in which Canada could build the FREMM frigate at Irving. Those governments offered to guarantee the cost of the 15 ships at a fixed $30 billion, but that was rejected by the Canadian government. The other type of warship the PBO will look at is the Type 31, which is to be built for the Royal Navy in the United Kingdom. Those ships are to cost less than $500 million each. In 2017, then Parliamentary Budget Officer Jean-Denis Fréchette estimated the CSC program would cost $61.82 billion. The entry of the BAE Type 26 warship in the Canadian competition was controversial from the start and sparked complaints that the procurement process was skewed to favour that vessel. Previously the Liberal government had said only mature existing designs or designs of ships already in service with other navies would be accepted on the grounds they could be built faster and would be less risky. Unproven designs can face challenges if problems are found once the vessel is in the water and operating. But the criteria was changed and the government and Irving accepted the BAE design, though at the time it existed only on the drawing board. Construction began on the first Type 26 frigate in the summer of 2017 for Britain's Royal Navy. https://www.thetelegram.com/news/canada/defence-watch-new-dates-set-for-budget-watchdogs-reports-on-major-naval-projects-512897/

Toutes les nouvelles