6 octobre 2020 | Local, Aérospatial

Government awards design contract for future fighter infrastructure in Bagotville

From: National Defence

News release

October 2, 2020 – Ottawa, Ontario – National Defence / Canadian Armed Forces

As outlined in Canada's defence policy, Strong, Secure, Engaged, the Government of Canada is providing Canadian Armed Forces (CAF) personnel with the infrastructure they require to support their future operations.

Today, the Honourable Harjit S. Sajjan, Minister of National Defence, announced a $12.1-million contract award to EllisDon-EBC Inc. Joint Venture of Ottawa for the design of a new fighter jet facility at 3 Wing Bagotville, one of two main operating bases for Canada's future fighter aircraft. This infrastructure, along with the facilities being built at 4 Wing Cold Lake, will support the long-term maintenance and operation of 88 new aircraft being procured for the Royal Canadian Air Force (RCAF) through the Future Fighter Capability Project (FFCP).

This contract is an important milestone in preparing Bagotville for the future fighter, and delivering the infrastructure our aviators will need. Both the Cold Lake and Bagotville infrastructure projects will provide significant economic opportunities for the Canadian construction industry, as well as their respective communities. In total, approximately 900 jobs are expected to be created during the design and construction of both facilities.

The Bagotville facility will host two tactical fighter squadrons and will cover approximately 12,500 m2, providing space for daily operations, maintenance, administration, mission planning, and simulator training.

Quotes

“Modern infrastructure is a critical step to remaining operationally ready for the future, and this project is another guarantee that we will continue protecting Canadian sovereignty while standing with NORAD and NATO, today and tomorrow. We are well on our way to constructing the modern facilities we need to house our future fighter fleet.”

The Honourable Harjit S. Sajjan, Minister of National Defence

“By investing in infrastructure for the future fighter aircraft and the Canadian Armed Forces, the government is also investing in the Bagotville community. The design and construction of this new facility will provide economic benefits for Canadian industry and the Bagotville region, while ensuring our military remains strong, secure, and engaged.”

Anita Vandenbeld, Parliamentary Secretary to the Minister of National Defence

Quick facts

  • A $9.2-million contract was awarded in August 2020 to EllisDon Construction Services for the design portion of the Cold Lake future fighter infrastructure.

  • Construction is expected to begin at both bases in summer 2022.

  • Both the Bagotville and Cold Lake design contracts will include options for the contractors to build the new facilities, and any additional infrastructure once the future fighter is selected, should Canada decide to exercise these follow-on options.

  • By awarding these infrastructure design contracts now, before the future fighter is selected, necessary work can proceed and bases will be ready for the first aircraft deliveries.

  • These facilities will be designed and constructed to Leadership in Energy and Environmental Design Silver standards and will use energy efficient options wherever possible.

  • https://www.canada.ca/en/department-national-defence/news/2020/10/government-awards-design-contract-for-future-fighter-infrastructure-in-bagotville.html

Sur le même sujet

  • Coast guard ship breakdown ends 48-year science survey streak

    26 octobre 2018 | Local, Naval

    Coast guard ship breakdown ends 48-year science survey streak

    Paul Withers · CBC News North Atlantic Fisheries Organization meeting highlighted unreliability of Canada's research vessels For the first time in 48 years, Canadian fisheries scientists failed to complete an annual summer survey off Nova Scotia because of a mechanical breakdown on their coast guard research ship, adding to concerns over the reliability of Canada's research vessel fleet. "There have been instances in the past where we have been unable to do sections of a survey, but we've been usually able to cover most of the area in question," said Kent Smedbol, regional manager of population ecology at DFO Science Maritimes. "This is the first time that a substantial portion of the survey we were not able to complete." The 36-year-old coast guard ship Alfred Needler was scheduled to carry out the summer survey, which involves bottom trawling for multiple species and environment data collection, on the Scotian Shelf from Cape Breton to Georges Bank. The information would have been used to predict commercial fish stocks that support fisheries worth tens of millions of dollars. The Department of Fisheries and Oceans has been conducting the survey since 1970 from its base at the Bedford Institute of Oceanography in Halifax. Salt water knocks out motor, generator But even before the survey started in July, salt water in rough seas got into — and burned out — the Needler's trawl motor and generator, rendering the vessel unusable, said deputy coast guard commissioner Mario Pelletier. "That's critical equipment in order to conduct the survey, so they needed to come back to repair it," Pelletier told CBC News. "And given what just happened we wanted to make sure to prevent it so it doesn't happen in the future. So we put some extra work to make sure it would be protected from future salt water exposure should the ship be in rough seas again." 'We do what we can with the resources' DFO tried, but was unable, to charter a commercial fishing trawler. Another coast guard research vessel, the Teleost, was pressed into service for an abbreviated mission. The southern Scotian Shelf from Yarmouth to Halifax was sampled but two-thirds was missed entirely. "It is difficult. This is what we are asked to do by the department. So we do what we can with the resources we have at hand," said Smedbol. Stock assessment for species north of Halifax will not be updated this year. The Teleost broke off the survey at the end of July to carry out a scheduled ecosystem survey in Quebec. "Given our survey was already delayed, we didn't want to impact the survey in another region by trying maintain the use of the Teleost. It was best to have a full survey uninterrupted in the other region," said Smedbol. Same ship missed another survey in 2018 This was the second time in 2018 the Needler was sidelined and unavailable for a scheduled science survey. It also missed the annual winter survey on Georges Bank because it was stuck in an extended refit. Wasted steel decking had been discovered. The Teleost was expected to fill in on the Georges Bank mission. However, it was also unavailable because its scheduled refit had to be extended. In that case, DFO was able to charter the Mersey Venture at cost of $300,000 for an abbreviated 11-day mission. International criticism of Canadian 'deficiencies' The unreliability of Canadian government research vessels, including the Needler, was highlighted at a science council meeting of the North Atlantic Fisheries Organization this past June. Canada provides scientific survey data in areas off its coast to the international fisheries management agency. The NAFO science council report said "substantive mechanical issues with the Canadian research vessels resulted in very poor coverage of [Division 3L]" off southern Newfoundland in 2017. "This marks the second time in three years that the spring survey coverage of Division 3L has been very poor." The council report said that in 2017, for the third time in four years, a deepwater survey off Labrador was not covered, and for the fifth time in six years, a deepwater survey was not covered in southern Newfoundland. The scientists said the data holes make it harder to evaluate trends in biomass and abundance for a number of species. "Deficiencies in survey coverage also add uncertainty to the results of research on environmental trends and ecosystem status, functioning and productivity," the science council said. https://www.cbc.ca/news/canada/nova-scotia/coast-guard-ship-breakdown-ends-48-year-survey-streak-1.4877209

  • Arrival of new aircraft, lack of trained staff will cause 'significant disruption' for RCAF, generals told

    21 avril 2023 | Local, Aérospatial

    Arrival of new aircraft, lack of trained staff will cause 'significant disruption' for RCAF, generals told

    The Royal Canadian Air Force is dealing with a high number of inexperienced personnel, as well as shortages of staff in key jobs.

  • Maxar Technologies MDA extends industry leadership in unmanned airborne systems for surveillance and intelligence services

    12 février 2018 | Local, Aérospatial

    Maxar Technologies MDA extends industry leadership in unmanned airborne systems for surveillance and intelligence services

    Richmond, BC - MDA, a Maxar Technologies company (formerly MacDonald, Dettwiler and Associates Ltd.), (NYSE: MAXR; TSX: MAXR), announced today that it has signed a contract with an unnamed international customer. MDA will provide turnkey, unmanned aircraft system (UAS) surveillance services. The contract includes options for additional years. MDA's UAS service will use a fleet of Schiebel CAMCOPTER® S-100 rotary-wing unmanned aircraft to provide surveillance information. MDA will be responsible for all aspects of the service including acquisition of all the systems and required infrastructure, training, airworthiness, logistics, supply chain, maintenance and all flight operations. The S-100 aircraft is a vertical takeoff and landing UAS, which does not require a prepared area or supporting launch or recovery equipment. It operates day and night and is a very capable platform for a wide range of different surveillance payloads to meet a broad set of mission requirements. MDA's UAS service will equip the S-100 fleet with L3 WESCAM MX-10 EO/IR payloads. The MX-10 is a high-performance, multi-sensor multi-spectral imaging system for tactical surveillance missions. It carries multiple sensors including both high-definition day modes and night infrared modes. The MX-10 is currently operational for twelve nations worldwide on the S-100 including Naval Shipborne customers leading to a low risk, proven solution. Mike Greenley, group president of MDA said, “MDA is a global leader and trusted partner in UAS surveillance services in challenging, complex and hostile environments. This program is a key plank in our growth strategy, offering UAS services in many different environments, and for a diverse set of missions.” About MDA MDA is an internationally recognized leader in space robotics, satellite antennas and subsystems, surveillance and intelligence systems, defence and maritime systems, and geospatial radar imagery. MDA's extensive space expertise and heritage translates into mission-critical defence and commercial applications that include multi-platform command, control and surveillance systems, aeronautical information systems, land administration systems and terrestrial robotics. MDA is also a leading supplier of actionable mission-critical information and insights derived from multiple data sources. Founded in 1969, MDA is recognized as one of Canada's most successful technology ventures with locations in Richmond, Ottawa, Brampton, Montreal and Halifax. MDA is Maxar Technologies company (TSX: MAXR; NYSE: MAXR). For more information, visit www.mdacorporation.com. About Maxar Corporate Maxar Technologies (formerly MacDonald, Dettwiler and Associates) is a leading global provider of advanced space technology solutions for commercial and government markets including satellites, Earth imagery, geospatial data and analytics. As a trusted partner, Maxar Technologies provides unmatched end-to-end advanced systems capabilities and integrated solutions expertise to help our customers anticipate and address their most complex mission critical challenges with confidence. With more than 6,500 employees in over 21 locations, the Maxar Technologies portfolio of commercial space brands includes: SSL, MDA, DigitalGlobe, and Radiant Solutions. Every day millions of people rely on Maxar Technologies to communicate, share information and data, and deliver insights that empower a better world. Maxar trades on the Toronto Stock Exchange and New York Stock Exchange as MAXR. For more information visit www.maxar.com. About Schiebel Founded in 1951, the Vienna-based Schiebel Group focuses on the development, testing and production of state-of-the-art mine detection equipment and the revolutionary CAMCOPTER® S-100 Unmanned Air System (UAS). Schiebel has built an international reputation for producing quality defense and humanitarian products, which are backed by exceptional after-sales service and support. Since 2010, Schiebel's composite division supplies high-tech customers with products of supreme carbon fiber technology – all quality-controlled to meet ISO 9001 standards. With headquarters in Vienna (Austria), Schiebel now maintains production facilities in Wiener Neustadt (Austria) and Abu Dhabi (UAE), as well as offices in Washington DC (USA) and Phnom Penh (Cambodia). Forward-Looking Statements This release contains forward-looking statements and information, which reflect the current view of Maxar Technologies Ltd. (the “Company”) with respect to future events and financial performance. The forward-looking statements in this regard include statements regarding the award of a contract with an unnamed customer. Any such forward-looking statements are based on the Company's current expectations, estimates, projections and assumptions in light of its experience and its perception of historical trends. The factors and assumptions underlying the forward-looking statements in this release include relevant contracts not being terminated. Any such forward-looking statements are subject to a number of risks and uncertainties that could cause actual results to differ materially from current expectations. The Company cautions readers that should certain risks or uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary significantly from those expected. The risks that could cause actual results to differ from current expectations include, but are not necessarily limited to: changes in certain priorities, mandates, funding levels, contracts and regulations; satellite failure; failure of third parties and subcontractors; and failure to anticipate changes in technology, technical standards and offerings or compliance with the requisite standards, or failure to maintain technological advances and offer new products to retain customers and market position. For additional information with respect to certain of these risks or factors, plus additional risks or factors, reference should be made to the Company's continuous disclosure materials filed from time to time with Canadian and U.S. securities regulatory authorities, which are available online under the Company's SEDAR profile at www.sedar.com, under the Company's EDGAR profile at www.sec.gov, or on the Company's website at www.maxar.com. For more information, please contact: Wendy Keyzer MDA Media Contact MDA Telephone: 1-604-231-2743 E-mail: wendy@mdacorporation.com Marissa Poratto MDA Investor Relations Telephone: 1-604-331-2044 E-mail: mporatto@maxar.com https://mdacorporation.com/news/pr/pr2018020901.html

Toutes les nouvelles