11 mars 2024 | International, Terrestre
Pentagon unveils $850 billion budget request amid spending uncertainty
The FY25 budget trims the Pentagon's procurement accounts to fit inside spending caps required in last year's debt-ceiling deal.
18 décembre 2020 | International, Terrestre
By
Christen McCurdy
Dec. 17 (UPI) -- GM Defense announced Thursday that it has started renovation of an existing General Motors building to support production of the Infantry Squad Vehicle, an all-terrain troop carrier designed to transport a nine-soldier infantry squad.
The 750,000-square-foot facility is located in Concord, N.C.
Construction at the facility is likely to continue into early spring, with the production line delivering vehicles in April.
"We have tremendous momentum behind our ISV win, featuring a first-of-its-kind tactical wheeled vehicle that gives our Soldiers speed, durability and performance to enhance mission success," said Tim Herrick, interim president of GM Defense. "GM Defense is responsible for the design, engineering and manufacturing of the ISV. This facility will enable us to meet our customer's timeline for delivery while continuing our journey to bring commercial technologies and transformative mobility solutions to the defense market."
The 5,000-pound ISV is based on the 2020 Chevrolet Colorado ZR2 midsize truck architecture and uses 90 percent commercial-off-the-shelf parts, but is engineered to fulfill military requirements and designed to provide rapid ground mobility.
The ISV is light enough to be sling loaded from a UH-60 Blackhawk helicopter and compact enough to fit inside a CH-47 Chinook helicopter, and includes a Rollover Protection System for transportability on any battleground.
The facility is slated to manufacture 649 ISVs in support of the production of the 2,065 vehicles GM Defense is contracted to deliver per a $214.3 million award awarded to GM Defense in June.
The deal is the first major award since GM created a defense subsidiary in 2017.
GM Defense delivered its first ISV to the Army in October.
 
					11 mars 2024 | International, Terrestre
The FY25 budget trims the Pentagon's procurement accounts to fit inside spending caps required in last year's debt-ceiling deal.
 
					19 août 2020 | International, Aérospatial
by Gareth Jennings The US Army has issued a request for information (RFI) for the ‘depopulation' of its remaining Boeing AH-64D Apache Longbow attack helicopters. Announced by the US Army Program Executive Office – Aviation on 17 August, the Apache AH-64D Attack Helicopter Depopulation RFI seeks to identify potential sources that possess the expertise, capabilities, and experience to meet the requirements necessary to depopulate (disassemble) hundreds of the service's remaining helicopters. “This RFI is to obtain qualified vendors to provide plans, procedures, production information, and reports addressing the depopulation of three to seven AH-64D aircraft per month. Additional work scope includes minor repairs in order to maximise reuse of components for production of the AH-64E [Apache Guardian]. The period of performance for this work is from January 2022 through December 2027 with the first delivery required in June 2023 and the last delivery required in March 2027,” the US Army stated on the beta.sam.gov government procurement website. https://www.janes.com/defence-news/news-detail/us-army-seeks-vendor-to-disassemble-remaining-ah-64d-attack-helos
 
					8 octobre 2024 | International, C4ISR, Sécurité
Awaken Likho shifts tactics, using MeshCentral in cyberattacks targeting Russian government agencies and industries.